Eglinton Crosstown Vehicle Testing - EMSF to Keelesdale Station

  Рет қаралды 48,632

CrosstownTO

CrosstownTO

Күн бұрын

Пікірлер: 110
@ramrod3922
@ramrod3922 3 жыл бұрын
You guys need to keep popping out these videos out weekly. It's fun and interesting to watch the progress of this each week. People' are home, there is not much to do....stay at home order's! Keep making these videos.
@Leo_Chan
@Leo_Chan 4 жыл бұрын
Wow, they actually did it. A full video!
@Nathan630pm
@Nathan630pm 4 жыл бұрын
This, and "We did it! 1 Station in 9 years!" Incredible.
@haweater1555
@haweater1555 4 жыл бұрын
What a rollercoaster in some places... can't wait to try it!
@cinthia9602
@cinthia9602 4 жыл бұрын
It good to know that something came out of all the years of construction irritation.
@anareel4562
@anareel4562 3 жыл бұрын
one thing i hate to call out this late is the different track gauge on this line and the Finch line compared to ALL other streetcars in Toronto. I know its the standard gauge used basically everywhere else in North America but having to purchase and maintain 2 separate fleets of essentially the same vehicles is counter productive
@Humulator
@Humulator 3 жыл бұрын
because these are the same vehicles going to other projocts and the others use standard gauge. its much easier for them to use standard
@anareel4562
@anareel4562 3 жыл бұрын
@@Humulator did u even read what I said? Thanks for saying the same thing with spelling mistakes. Thanks for adding to the conversation
@OntarioTrafficMan
@OntarioTrafficMan 3 жыл бұрын
The LRT fleet would be incompatible with the streetcar fleet regardless of the track gauge. They are wider and they can't go around the tight curves of the streetcar network. Streetcars can't run on LRT lines because they only have doors on one side
@anareel4562
@anareel4562 3 жыл бұрын
@@OntarioTrafficMan uhh as far as I know the turning circle of the Flexity and the Flexity are the same... The doors I can see being an issue but I wasn't saying it for vehicle sharing but for vehicle movement from 1 shop to another
@OntarioTrafficMan
@OntarioTrafficMan 3 жыл бұрын
@@anareel4562 "As far as I know"? Just look it up. Took me two seconds to find, since this is a really common question. The minimum turning radius is 25m for the LRVs, compared to 11m for the streetcars. They are 2.65m wide, compared to 2.54m. Their maximum grade (slope) is only 6%, compared to 8%. They can't navigate single-point switches (i.e. nearly all switches on the streetcar network). They run on 750 V rather than 600 V. There's absolutely no way the LRVs could run on the current streetcar network, regardless of the track gauge. There's a reason that the TTC had to get such custom-built streetcars.
@thevultrantransituniverse1487
@thevultrantransituniverse1487 4 жыл бұрын
Very excited to see this line opened!
@alexanderip1003
@alexanderip1003 4 жыл бұрын
I Think the Science Centre needs a theme (Molecule Shaped Pillars/Gables at the station)
@Boeing727ONTOP
@Boeing727ONTOP 3 жыл бұрын
Exactly! It just looks like all the other stations, and that’s not fun
@spongebobsquarepants921
@spongebobsquarepants921 4 жыл бұрын
I can't wait for them to come out
@purplerabbit638
@purplerabbit638 3 жыл бұрын
That's what she said
@metropolitantransit7276
@metropolitantransit7276 4 жыл бұрын
The surface track west of Eglinton is also complete, LRT still cannot be tested there as construction on some of the other underground stations are being worked on until 2022.
@metropolitantransit7276
@metropolitantransit7276 4 жыл бұрын
Sorry I meant east.
@KrishRaju-p4g
@KrishRaju-p4g 3 ай бұрын
Cool I am very excited and interested on riding the new lrt line
@MimicoBungalow
@MimicoBungalow 3 жыл бұрын
FINALLY! A more or less COMPLETE video. We're SO eager to have this thing DONE! I've driven by this on the way to work for years and watched the progress...my station/area of interest is the Mount Dennis / Keelesdale bit...I could do without the crappy 'commercial music' sound-track...but, obviously - parts of this were sped up a little so that 'ambient' sounds would not have worked...nevertheless - in future videos - if they are in 'real time' - how about the ambient sounds of the train? Wow.
@Absolute_Zero7
@Absolute_Zero7 4 жыл бұрын
Why does the video say to Caledonia, when the footage only reaches Keelesdale? Edit: Fixed
@MIKEJ788
@MIKEJ788 4 жыл бұрын
Lol
@Buzzlybee
@Buzzlybee 3 жыл бұрын
Petition to change Line 5 with actual subways
@haweater1555
@haweater1555 3 жыл бұрын
If the Sheppard subway is extended, they could save a lot by converting it to an LRT line.
@tristanridley1601
@tristanridley1601 3 жыл бұрын
Way too late for that. I hope they built it for relatively easy upgrading once the LRT capacity is overwhelmed.
@CANMONQUE
@CANMONQUE 2 жыл бұрын
The fact line 5 not a subway, the cost of the project for no grade separation and all the delays making it the biggest transit feature in Canadian History. Having said that the line will still be useful, particularly all the connections to others lines, but it could have been so much more. Hopefully this serve as lessons for the future. I am not against LRT but overall this project was poorly design. The location was perfect for a subway.
@olegs79
@olegs79 3 жыл бұрын
That's cool. Excited for this.
@hojoinhisarcher
@hojoinhisarcher 3 жыл бұрын
T.O stuff turns up in the algorithm for fun .Grew up here in the 50s when this was pastoral.If it hadn't been for the church at 4:30 would have no idea.
@raxvillanueva6310
@raxvillanueva6310 4 жыл бұрын
The 19-kilometre, 25-stop Eglinton Crosstown light rail transit line is set to open in 2022.
@abdullahrizwan592
@abdullahrizwan592 4 жыл бұрын
Nice, I wish this can get done one time with out any more delays
@bink023
@bink023 4 жыл бұрын
Looks great - but what happened to Caledonia?
@JayFow
@JayFow 4 жыл бұрын
apperently that was keelesdale, they made a mistake
@さくら鉄道チャンネル
@さくら鉄道チャンネル 4 жыл бұрын
Awesome video!!
@moses8758
@moses8758 4 жыл бұрын
KZbin recommendations at it agin but no problems look nice
@Hafiz100ify
@Hafiz100ify 4 жыл бұрын
God, I hope it isn't that slow during revenue service.
@sovb
@sovb 4 жыл бұрын
Of course it won't. As this is just a test run, they aren't putting it at full speed, most likely because of the fact that this is the first time they're putting the vehicles on the track. Who knows if there's some non-visible defect in the track that will mess up a train going at full speed. Also, there's workers on the line, and a lot of the signage most likely isn't up yet. In addition, there's also the fact that the line isn't even finished fully. Edit: Oh and, all of the signals are red.
@DP-gt7sr
@DP-gt7sr 4 жыл бұрын
@@sovb They are moving even slower than you think. Look at the cars on the road and the workers on the side. The film is sped up!
@brianmcdonald6519
@brianmcdonald6519 4 жыл бұрын
@@DP-gt7sr Thought I noticed the same thing a couple of times! Thought my eyes were playing tricks on me!! Lol!!
@lvalledor3440
@lvalledor3440 4 жыл бұрын
Theres another video that shows the LRT can go as fast as the subway trains
@d53101
@d53101 3 жыл бұрын
Bombardier vehicles, they can’t go any faster.🚂
@WeatherxCalipha
@WeatherxCalipha 4 жыл бұрын
I assume they plan on having two or three sets of cars hooked up to each other considering how long platforms on both the streets and in the stations are.
@happythecat9231
@happythecat9231 4 жыл бұрын
I wonder when they will finish
@nanaokyere7141
@nanaokyere7141 4 жыл бұрын
It was actually suppose to be in service now in 2020 but delays with bombardier making the trains on time and covid have pushed it back another 2 years. They've now scheduled it for 2022.
@PWingert1966
@PWingert1966 4 жыл бұрын
@@nanaokyere7141 Even then Eglington and Yonge won't be open for another seven months after that due to underground pipes that no one seemed to know about suddenly being discovered and having to be rerouted once they figure out what they are for who owns them and get permits from them to move them.
@davidbrowne3761
@davidbrowne3761 4 жыл бұрын
@@nanaokyere7141 As well Rob Ford wanting to change which stations are street-level and which underground 🚇 and the length of the LINE
@jeffskene42
@jeffskene42 4 жыл бұрын
Does anyone know if this route uses any of the old started Eglington Subway scraped by Mike Harris
@DarkDavesMirror
@DarkDavesMirror 4 жыл бұрын
No. Everything was filled in. So much for saving money.
@nanaokyere7141
@nanaokyere7141 4 жыл бұрын
Very cool. I wonder if they'll treat the surface stops as streetcar stops, meaning will they bypass surface stops if no one is there or hasn't pressed for their stop?
@guldukat2453
@guldukat2453 4 жыл бұрын
Stops every station like a subways. Cars will also be coupled (2-3 times more capacity than normal streetcar). Operating speed will be higher than streetcar due to grade separation. Basically, this is an LRT, not streetcar.
@tailiu223
@tailiu223 3 жыл бұрын
​@@fahim5183 Yes Rob Ford called them 'streetcars' and he wanted to build something better. Then he built NOTHING.
@tailiu223
@tailiu223 3 жыл бұрын
@@fahim5183 Other than capacity, there are speed, comfort, reliability, safety.....etc.
@tailiu223
@tailiu223 3 жыл бұрын
@@fahim5183 Speed, yes. The stops are further apart than streetcar stops and they are not in mixed traffic. Safety, yes. They are not in mixed traffic. Reliability, yes, they are separated from vehicle traffic.
@tailiu223
@tailiu223 3 жыл бұрын
@@fahim5183 No...those are streetcars.
@donteatthechalk
@donteatthechalk 4 жыл бұрын
Getting very excited!
@mikedrown2721
@mikedrown2721 4 жыл бұрын
I'd love to live here
@guillermogouldburn763
@guillermogouldburn763 4 жыл бұрын
So where is this for those of us who are not from there? Nice rail system by the way.
@MarcusCollins69
@MarcusCollins69 4 жыл бұрын
Toronto, Ontario
@TheODLawson23
@TheODLawson23 4 жыл бұрын
Cool, but sadly, old everything is gone. I miss those days in 80's and 90's.
@lbeaton1
@lbeaton1 4 жыл бұрын
Nice, but it's driving me just a little crazy that the camera isn't pointing straight ahead.
@ianglynwilliams
@ianglynwilliams 3 жыл бұрын
The problem is that the camera is fixed and not moving in concert with the wheel direction or eyesight of the operator.
@meee2170
@meee2170 4 жыл бұрын
oh it's going to be a streetcar. nice! atelast i can get to school quicker
@Epiceditz735
@Epiceditz735 4 жыл бұрын
true
@SomeGuy-lw2po
@SomeGuy-lw2po 4 жыл бұрын
I'm being pedantic, but it's called a tram. Cars and trollies are different.
@Epiceditz735
@Epiceditz735 4 жыл бұрын
@@SomeGuy-lw2po it called a streetcar
@SomeGuy-lw2po
@SomeGuy-lw2po 4 жыл бұрын
@@Epiceditz735 I hear you, but you're wrong. It's no big deal, but wrong is wrong
@RipCityBassWorks
@RipCityBassWorks 4 жыл бұрын
Uh, isn't a street car street running? This looks like it has a dedicated right of way to me...
@HAA0603
@HAA0603 3 жыл бұрын
Faster than the O-Train being built in Ottawa lol
@jayvonnoelsmith8445
@jayvonnoelsmith8445 Жыл бұрын
This needs to be finish
@ybmojimoji2066
@ybmojimoji2066 3 жыл бұрын
How big is it
@adheebrahumathullah4099
@adheebrahumathullah4099 3 жыл бұрын
Can’t wait to operate the system yes
@michaelrmurphy2734
@michaelrmurphy2734 3 жыл бұрын
Why on the road on the left hand side? Why not keep right like driving a car?
@dariansamuels9357
@dariansamuels9357 2 жыл бұрын
❤❤❤
@kelvincao8359
@kelvincao8359 4 жыл бұрын
Just PLEASE finish the whole construction already! I’m sick of driving through the whole mess of construction on Eglinton
@funvideofan1625
@funvideofan1625 3 жыл бұрын
Can you please rename Keelesdale To Keele North Station
@spencergraham-thille9896
@spencergraham-thille9896 4 жыл бұрын
Where is this?
@JruGordon
@JruGordon 4 жыл бұрын
What's EMSF? Edit: Eglinton Maintenance & Storage Facility
@billyfouronesix
@billyfouronesix 4 жыл бұрын
Maybe tell us what EMSF means?
@brosandshortfilms7647
@brosandshortfilms7647 4 жыл бұрын
eglinton maintanence storage facility
@cosmoray9750
@cosmoray9750 3 жыл бұрын
5:08 The station is not even heated. wtf.
@lvalledor3440
@lvalledor3440 4 жыл бұрын
Looking good. I do hope once the Eglinton LRT is in service it will run full time & hopefully not have to shut down parts of the line on the weekends & replace with shuttle buses due to track work, etc. I don't about anyone else but I feel sometime in the future the Eglinton LRT will extend west of Mount Dennis to Etobicoke & connect to the Mississauga Transitway Renforth station. That'd be nice too.
@cumhachd
@cumhachd 4 жыл бұрын
Yup, Metrolinx has already had public meetings about the extension plan. Currently they're showing two elevated stations going west from Mt Dennis over the valley around Jane, then underground all the way to Renforth where it will end at a surface station connecting to the Mississauga busway. They are talking about a future Pearson connection but I don't think that's well-studied yet. See www.infrastructureontario.ca/Eglinton-Crosstown-West-Extension/ Frequent shutdowns happen on the old lines because they are very old and need a lot of modernization, and they are used so much that the little time they can afford to close for repairs doesn't allow for efficient work. They could probably refurbish everything in one go working 24/7 but they'd be fully closed for months. If they'd only known about the pandemic ahead of time it could have been a great opportunity.
@KevinT3141
@KevinT3141 4 жыл бұрын
Signal Passed At Stop. Tsk tsk... :-)
@deepaksetia
@deepaksetia Жыл бұрын
3 years and still waiting 😂
@schnuurtchke
@schnuurtchke 4 жыл бұрын
Is it going to go faster than in the video during service
@sovb
@sovb 4 жыл бұрын
Of course it will. As this is just a test run, they aren't putting it at full speed, most likely because of the fact that this is the first time they're putting the vehicles on the track. Who knows if there's some non-visible defect in the track that will mess up a train going at full speed. Also, there's workers on the line, and a lot of the signage most likely isn't up yet. In addition, there's also the fact that the line isn't even finished fully. Edit: Oh and, all of the signals are red.
@thattallguy9053
@thattallguy9053 3 жыл бұрын
They our building one on finch and i’m hating the traffic. I mean seriously wtf are they doing.... They already opened finch west stn so why make an Lrt? waste of money
@anhbinbaccuc8850
@anhbinbaccuc8850 4 жыл бұрын
I remember 2-3yrs ago around this time when people were out Christmas shopping , traffic was bad and they closed off partially Eglington street, our bus was stuck on Eglington - Don Mill for 5-6hrs. The passengers in the bus even joke "lets call pizza"
@DarkDavesMirror
@DarkDavesMirror 4 жыл бұрын
With covid traffic, that won't be an issue this year.
@chromebomb
@chromebomb 4 жыл бұрын
Toronto transit seems fragmented......i'm just an american who has been to Buffalo and YYZ
@hoosierhermit
@hoosierhermit 3 жыл бұрын
The music is horrendous and loud
@lisaking4160
@lisaking4160 3 жыл бұрын
Please just finish it😒
@gmailgmail1010
@gmailgmail1010 3 жыл бұрын
Oh, it's just me or, It's so slow!
@TheOneThreeFour
@TheOneThreeFour 4 жыл бұрын
Obviously a test run should be done at safe speeds, but this is so slow that the video is significantly sped up and STILL is incredibly boring to watch. Might as well have pushed the rolling stock by hand.
@abdullahrizwan592
@abdullahrizwan592 4 жыл бұрын
lol
@bobjeffersonjeffy7968
@bobjeffersonjeffy7968 4 жыл бұрын
Build those fema camps just like the Nazis
@juliansmith4295
@juliansmith4295 3 жыл бұрын
For musicians, composing this sort of empty, one-size-fits-all background music that appeals to people in high positions who have crappy peach and off white prints of sailboats in their offices, must be like training to be a chef and ending up at MacDonald's.
@peterpankova5532
@peterpankova5532 3 жыл бұрын
Toronto is way behind European cities in terms of Public Transportation. The development will take decades. Still, building something is better than nothing.
@thetorontoyeller453
@thetorontoyeller453 3 жыл бұрын
What a fucking waste of money. The vehicles are the same as the street cars. They could have just gotten government subsidy to put as a street car right away. Looks the same as Harbour front right away.
@bobjeffersonjeffy7968
@bobjeffersonjeffy7968 4 жыл бұрын
Bet that place will start falling apart in 3 years
@Thanaxx3
@Thanaxx3 4 жыл бұрын
Where is this?
Eglinton Crosstown LRT vs Streetcars
9:00
notsmoothsteve
Рет қаралды 77 М.
28km of Light Rail | Eglinton Crosstown Progress Fall 2024
10:07
Transitthinker
Рет қаралды 31 М.
Леон киллер и Оля Полякова 😹
00:42
Канал Смеха
Рет қаралды 4,7 МЛН
It works #beatbox #tiktok
00:34
BeatboxJCOP
Рет қаралды 41 МЛН
She made herself an ear of corn from his marmalade candies🌽🌽🌽
00:38
Valja & Maxim Family
Рет қаралды 18 МЛН
Eglinton Crosstown First Vehicle Delivery
5:43
CrosstownTO
Рет қаралды 92 М.
Vehicle Ride: Laird Station to EMSF
5:35
CrosstownTO
Рет қаралды 37 М.
Eglinton Crosstown Surface Flyover - July 2020
6:22
CrosstownTO
Рет қаралды 25 М.
Ontario Line Renders UNVEILED! | The Most Modern Subway Line
15:37
[Toronto Subway] TTC Line 3 Action At All Stations
9:36
Technet9090
Рет қаралды 16 М.
Tunnelling for The Crosstown
3:40
CrosstownTO
Рет қаралды 102 М.
Eglinton Crosstown LRT - opening ... soon?
6:03
notsmoothsteve
Рет қаралды 47 М.
FIRST RIDE on Toronto's Line 5 Eglinton Crosstown!
8:01
RMTransit
Рет қаралды 120 М.