If this doesint open in june 1st 2025, I will actually lose it
@lkat511328 күн бұрын
2021! lol!!! Still won’t be open in 2025!
@WilhelmFreidrichАй бұрын
They will NEVER finish this. NEVER. It's just a scam to continuously steal taxpayers dollars.
@katey9547Ай бұрын
It’s taking forever and ever
@dh50402 ай бұрын
Another mess with Phatz Ford in charge.
@polarstar38402 ай бұрын
Bro... I can't believe how long both the construction and the speed of the train is. Is the train only slow due to the construction or i s that it's top speed? The video is literally 2x the original speed.
@twoonesixsixonetwo2 ай бұрын
i miss 2020 5:53 rip line 3
@katey95473 ай бұрын
Crazy delayed
@MimicoBungalow3 ай бұрын
So embarrassing I have relatives visiting from Ottawa and they were told that the system would be up and running two years ago and it's not.
@KrishRaju-p4g3 ай бұрын
Cool I am very excited and interested on riding the new lrt line
@Humulator5 ай бұрын
This is insane.
@jonchius5 ай бұрын
Who's still watching in 2024?
@HDTube1015 ай бұрын
July 2024 "Are we there yet"? No, be patient, there is still another decade to go.
@CcCcallaghan4735 ай бұрын
Line 2 Kipling/Islington/Keele/Woodbine/Warden/Kennedy/Sheppard East Line 3 Kennedy/McCowan Line 5 Kennedy/Mount Dennis/Renforth/Pearson Airport Keele/Eglinton Woodbine/Eglinton via Bloor-Yonge Keele/Woodbine
@sanaDyle6 ай бұрын
So you know how you have a train stop the sigh that goes down well I think they should have that for pedestrian when it's pedestrians turn to walk the the thing that blocks the train I think they should add that for pedestrian so that pedestrians our safe walking it would prevent more accidents. I think that law should be passed and safety monitor up .
@lawoftheuniverse80896 ай бұрын
Enjoy the Video People Cuz This is as Close as We are Every Gonna Get To Actually Riding This Thing...!!!
@lazerlayne6 ай бұрын
11 Years Ago Now and Phil Verster is still King of the Hill....making nearly a Million bucks a year for the LONGEST DELAY IN TORONTO HISTORY.....!!!!!!
@Hammer-w7x6 ай бұрын
Brilliant 👍
@lazerlayne7 ай бұрын
Decades and BILLIONS of Dollars, all thanks to Phil Verster.........!!!!
@lazerlayne7 ай бұрын
4 Years Later and still not functioning.......
@lazerlayne7 ай бұрын
With the MASSIVE RAISES you have personally received from Metrolinx which is paid directly via the CONSUMER....you should be FIRED Immediately......!!!!!
@lazerlayne7 ай бұрын
Since the start of this construction, I have gone from a working class individual to a retired person, by the time this open to the public, I will have past away....great work Metrolinx, time to fire Mr Verster....!!!
@shannon27118 ай бұрын
THis was posted 2 years ago. WHAT HAPPENED?! This looks near completion... I would love to see some transparency about why this project hasn't launched.
@jamesdmack8 ай бұрын
Video gets recommended. Awesome! It must be getting ready to open! *posted 2 years ago* Son of a b...
@vastlake9 ай бұрын
This line will be released at the same time as the video game remake of Cyberpunk in the year 2077
@dungeoncrawler92729 ай бұрын
2 years later, no update, no transit. But those ads telling us all to stop whining, those were great.
@TheHk1966Ай бұрын
Scratch that..3 years later and still no progress. EPIC FAILURE
@TheHk1966Ай бұрын
Guess you gotta take down that Science Center sign- add another two years
@michaelbrown57829 ай бұрын
I live at Rosemount where are they drop the trains off on the tracks
@jasonampaabeng987011 ай бұрын
😂😂Liars
@deepaksetia Жыл бұрын
3 years and still waiting 😂
@comp4nerd2 Жыл бұрын
The stations are too short. They will reach capacity in no time and then what? The original Toronto subway (built in less than half the time of this white elephant), built stations to meet the future increase in numbers of passengers.
@romanianisraeli Жыл бұрын
This will be nice to ride from Kennedy to Jane, once in a while i check it out to see the updates. However Toronto is still falling behind, New York, London and Paris subway lines, those are massive!
@lordpickle8424 Жыл бұрын
ford is a corrupt terrorist, as are all cuntservatives.
@pacman3556 Жыл бұрын
Wow and just think in another 75 to 80 years our great grand children may be able to have a chance to ride this thing
@metropolitantransit7276 Жыл бұрын
Can you guys do another flyover? It's been years since you made a video.
@rockybudgeboa Жыл бұрын
THANK YOU for saving this iconic Building
@timcarrington5977 Жыл бұрын
And it only took 12 years
@OptimusWombat Жыл бұрын
More than that. It may not even open in 2024.
@CPTE5069 Жыл бұрын
Can't believe Toronto tunneled most of the line just to make it into a tram.
@Humulator Жыл бұрын
Common... you can do better than this!
@malikshahidameerkhokhar1287 Жыл бұрын
@fahadbhattivalogs
@daerob1 Жыл бұрын
What a joke...
@judyArsh Жыл бұрын
And one year later your lack of attention to detail is already showing and no sign of an opening. Tracks are wrong. Platforms are wrong. It’s embarrassing. A complete ripoff of the public purse.
@anareel4562 Жыл бұрын
Still waiting for this to open....
@jayvonnoelsmith8445 Жыл бұрын
I like the Eglinton Crosstown LRT I want to see more progress
@jayvonnoelsmith8445 Жыл бұрын
This needs to be finish
@goyesseth Жыл бұрын
Phil you have failed this nation
@Humulator Жыл бұрын
It is time I ask again: Where is the new video?
@thevultrantransituniverse1487 Жыл бұрын
Ten years later, hasn't opened yet... 😑
@waltermuschenheim8880 Жыл бұрын
Yikes so many at-grade crossings. This line is going to be painfully slow.