Episode 15: Dam Breach Analysis & Johnstown Dam Failure

  Рет қаралды 12,050

The RAS Solution

The RAS Solution

Күн бұрын

Пікірлер: 11
@kylemiller4278
@kylemiller4278 3 жыл бұрын
Force 10 from Navarone - Dam breach movie with Harrison Ford. It has been free on YT lately. Thanks for the vodcasts, I always learn something new in the details you mention or short side tracks you take.
@Tommy48291
@Tommy48291 3 жыл бұрын
I would like to understand why after updating windows to the latest version, ras mapper stopped working and every time I turn it on it tells me "unhandled exception" and something about JIT. Does anyone else have the same problem ?
@TheRASSolution
@TheRASSolution 3 жыл бұрын
Windows updates can sometimes mess with the HEC-RAS software. I would recommend removing the RAS and RAS Mapper programs and reinstalling them
@kumariankita2085
@kumariankita2085 7 ай бұрын
When i run unsteady simulation the results of water depth has the same range of 0-15m in index for all the projects. Why is it coming so?
@anthonygreen4662
@anthonygreen4662 3 жыл бұрын
To apply rainfall only to one of the 2D areas do you use the older method of defining precip in the BC tab rather than the met tab in 6.0?
@TheRASSolution
@TheRASSolution 3 жыл бұрын
Anthony- if you just want a single excess precipitation hyetograph applied to a 2D area you can use the Boundary Condition input in the Unsteady Flow editor. If you want a more detailed hydrologic event simulated you'll need to use the Met tab.
@nbrahmareddy7690
@nbrahmareddy7690 3 жыл бұрын
Hello Users, I just need some insights on Breaklines. I have added breaklines into the 2d mesh area and enforced them as internal connections and entered weir data as top spillway elevation at 700m to the connections assuming they are acting as Embankments/weirs to the reservoir. But After I ran the Unsteady flow model successfully, in the results section in the RAS Mapper Water still flowing over the embankments at 653.55 only without filling the reservoir up to 700m elevation. What Should I do? Thank you in Advance #HECRAS #2dMODELING
@rodrigoperdigao9074
@rodrigoperdigao9074 3 жыл бұрын
That's Great!
@adityananta7677
@adityananta7677 2 жыл бұрын
i cant find any option for "Mixed flow regime" on running window in 5.0.7 version, how to activate that stuff?
@TheRASSolution
@TheRASSolution 2 жыл бұрын
Under the Unsteady Flow Plan window click on options--> Computation Options and Tolerance and click the far tab "1D Mixed Flow Options".
@adityananta7677
@adityananta7677 2 жыл бұрын
Thanks for your reply
Riprap sizing in HEC-RAS version 6.1
1:00:25
Australian Water School
Рет қаралды 6 М.
Amazing Parenting Hacks! 👶✨ #ParentingTips #LifeHacks
00:18
Snack Chat
Рет қаралды 23 МЛН
Win This Dodgeball Game or DIE…
00:36
Alan Chikin Chow
Рет қаралды 37 МЛН
规则,在门里生存,出来~死亡
00:33
落魄的王子
Рет қаралды 23 МЛН
Tailings Dam Breach Analyses
1:00:06
University of Alberta Geotechnical Centre
Рет қаралды 1,8 М.
HEC-RAS 2D Class: 5.1 - Dam Breaching Analysis
32:31
HEC RAS 6
Рет қаралды 11 М.
What the Maker of Ozempic Doesn't Want You to Know: It's Bankrupting America
12:01
Hoover Dam | All the Secrets of the Engineering Wonder
9:47
Lesics
Рет қаралды 12 МЛН
Thermoelectric cooling: it's not great.
32:51
Technology Connections
Рет қаралды 2,2 МЛН
Adding an Internal Structure to a 2D Mesh in HEC-RAS
8:56
Stanford Gibson
Рет қаралды 9 М.
Episode 27: Hidden Secrets of RAS Mapper
1:07:10
The RAS Solution
Рет қаралды 2,3 М.
HEC-RAS 2D Class: 5.2 - Selecting Breach Breach Parameters
28:43
Dam Breach Modelling
53:23
Australian Water School
Рет қаралды 19 М.
Amazing Parenting Hacks! 👶✨ #ParentingTips #LifeHacks
00:18
Snack Chat
Рет қаралды 23 МЛН