HEC-RAS 2D Class: 5.2 - Selecting Breach Breach Parameters

  Рет қаралды 5,975

HEC RAS 6

HEC RAS 6

Күн бұрын

Пікірлер
@isaacsinkala1574
@isaacsinkala1574 2 жыл бұрын
Thank you very much. I really need this knowledge.
@stanfordgibson
@stanfordgibson 2 жыл бұрын
Thanks Isaac. Yeah, these parameters are really important.
@vikassinghjadoun9952
@vikassinghjadoun9952 Жыл бұрын
When we give the upstream hydrograph data, what is the time duration that we give for the hydrograph. Is it the same as breach formation time as calculated by different methods.
@saeedgolian7535
@saeedgolian7535 5 ай бұрын
Just a quick question, if we have a tailing facility (non-Newtonian fluid) and a water dam (Newtonian fluid), then how these two can be modelled as in "Unsteady Flow Data", just one flow regime can be defined for the whole system, i.e. Newtonian or Non-Newtonian flow regime. Please correct me if I am wrong and if there is any solution to model these combination of flow regimes. Thanks
@stanfordgibson
@stanfordgibson 5 ай бұрын
This may be the most common question we get about 2D and I really need to do a video on it. In the standard fixed-bed NN tool, no, you only get one global Cv. But you can "hack" this by setting up a simple "mobile bed" sediment model (we even added simplifying tools like "concentration only" mode and a "deposition limiter" that will use the sediment engine to use the AD equation to route your debris flow into clear water...mix with the clear water, update the concentration, and feedback on the NN parameters. I really need to do a video on this...but i'm not sure when I'll get to it.
@_duniyadari_
@_duniyadari_ Жыл бұрын
How to calculate the pool volume at failure?
@onebyone9014
@onebyone9014 7 ай бұрын
Hello, I have a problem I am trying dam breach analys and I had an hdf error. It gives “Error in the time window Hdf error trying to close hdf output file hdf5 diag: Error detected in hdf5”
@firmansyahmardwiono2875
@firmansyahmardwiono2875 2 жыл бұрын
How to run dam breach for cascade dam?
@stanfordgibson
@stanfordgibson 2 жыл бұрын
If you have multiple dams in line, you could either set different breach times, or, better, set breach elevations for both of them, and after the first dam breaches, it will automatically fill the downstream reservoir and breach that dam.
@firmansyahmardwiono2875
@firmansyahmardwiono2875 2 жыл бұрын
@@stanfordgibson thank you very much
HEC-RAS 2D Class: 5.3 - Detailed Modeling with 2D Flow Areas
31:43
How Do You Steer a Drill Below The Earth?
14:53
Practical Engineering
Рет қаралды 4,2 МЛН
ССЫЛКА НА ИГРУ В КОММЕНТАХ #shorts
0:36
Паша Осадчий
Рет қаралды 8 МЛН
I'VE MADE A CUTE FLYING LOLLIPOP FOR MY KID #SHORTS
0:48
A Plus School
Рет қаралды 20 МЛН
HEC-RAS 2D Class: 5.1 - Dam Breaching Analysis
32:31
HEC RAS 6
Рет қаралды 11 М.
The Simple Math Problem That Revolutionized Physics
32:44
Veritasium
Рет қаралды 7 МЛН
Episode 15: Dam Breach Analysis & Johnstown Dam Failure
1:07:53
The RAS Solution
Рет қаралды 12 М.
All Things Water Course I, Activated Sludge
32:13
Blacoh
Рет қаралды 626 М.
Slavoj Žižek meets Yanis Varoufakis (Part 1)
21:33
How To Academy
Рет қаралды 156 М.
HEC-RAS 2D Sediment Data ad Output
31:13
HEC RAS 6
Рет қаралды 2,7 М.
Align Cells with Flow Direction: HEC-RAS 2D Mesh
20:44
Stanford Gibson
Рет қаралды 16 М.
Adding an Internal Structure to a 2D Mesh in HEC-RAS
8:56
Stanford Gibson
Рет қаралды 11 М.
26. Chernobyl - How It Happened
54:24
MIT OpenCourseWare
Рет қаралды 2,9 МЛН
ССЫЛКА НА ИГРУ В КОММЕНТАХ #shorts
0:36
Паша Осадчий
Рет қаралды 8 МЛН