Estimating quantities

  Рет қаралды 82,482

Principles of construction management

Principles of construction management

Күн бұрын

Пікірлер: 31
@ParthVaity-yi4wn
@ParthVaity-yi4wn 4 ай бұрын
There is a mistake in calculation, for the no of bar in footing. The no of spaces came to be 6.84 nos. The no of bars= 2*(6.84+1) = 15.7~16 Nos. So, 16*23= 368 nos.
@AmitPrakashces
@AmitPrakashces 5 жыл бұрын
how are you taking single overlap. The wall is considered to constructed between pillar. There is no wall that starts at one pillar and does not end at another pillar.
@janlevinson1604
@janlevinson1604 Жыл бұрын
in my opinion, 5-0.65*2 is not correct because 5 is clear distance, not center to center distance.
@kishlayjha1561
@kishlayjha1561 Жыл бұрын
Yes true
@De_cuttingedge
@De_cuttingedge 3 жыл бұрын
16:40 when u take the total length as 60 do we need to excavate entire 60m.sir can ask u something ,if the long walls are taken as 20m then the short wall won't be 10 m each.the 1.3 width will cover on each sides from the long wall length,isn't .Someone plz clarify my doubt
@pranavtagore
@pranavtagore 3 жыл бұрын
Yes, the inside span for the excavation will be reduced, but the excavation will also extend after the 20-metre span equals half of 1.3m from the centre, which will account for it.
@preeshanupadhyay146
@preeshanupadhyay146 7 жыл бұрын
how is it that after the deduction at 16:40 l=3.7? can anyone clarify?
@aswinivv4741
@aswinivv4741 4 жыл бұрын
Footing size taken is 900mm instead of 800mm. Taking 100mm for Pcc.
@ParthVaity-yi4wn
@ParthVaity-yi4wn 4 ай бұрын
Can anyone pls tell me how the Number came to be 21 and 2 in Double and single overlay in the bw?
@qqwzxcv
@qqwzxcv 4 ай бұрын
Please tell if you got the answer
@goteakshay08
@goteakshay08 4 жыл бұрын
Nice sirrrr
@shaileshmayekar2495
@shaileshmayekar2495 6 жыл бұрын
Hello sir please suggest a good book to do quantity estimating based on construction blueprints
@lb1923
@lb1923 4 жыл бұрын
Yes sir please
@AkashDubey94
@AkashDubey94 6 жыл бұрын
why P.C.C is required....sir asked the question,why we can't start brick after ground....please clarify ...
@dhruvzalawadia3099
@dhruvzalawadia3099 6 жыл бұрын
1) pcc is use for leveling. 2) you can't use any construction material because when it comes in contact of ground there will be a chance of corrosion of steel.
@shimish
@shimish 5 жыл бұрын
Sir at 16:40, how deduction is 3.7 m????
@santoshg3390
@santoshg3390 5 жыл бұрын
To construct the footings we need to excavate on eithe side of the pillar center line... which keeps the pillar in center of the footing.. so.. at the gate way which is 5mtr in width.. the footings on it left and right side will extend up to 0.65Mts from its centre.. as the gate way has two footings on both sides.. total deduction will be..5-(2*0.65)=3.7.. I hope ur doubt is clarified
@arialcad
@arialcad 4 жыл бұрын
5 m is the clear distance. iI is not center to center distance. Therefore 250 mm + 50 mm + 200 mm = 500 mm should be deducted from both ends. 250 mm is half of 500 mm and 500 mm is the difference between the dimension of footing 800 mm and the dimension of the column along the wall which is 300 mm. 50 mm is the extra width needed for the PCC bed and 200 mm is clearance for the working space. Thus in the calculation of deduction 5000 mm - 2 * 500 mm = 4000 mm (4 m) length should be used.
@preeshanupadhyay146
@preeshanupadhyay146 7 жыл бұрын
how is the number of pillars 23 can someone clarify 17:42
@ankitchauhan3207
@ankitchauhan3207 7 жыл бұрын
when the boundaries are closed (think of a circle) no of pillars/nodes = no of segments divided = 60/2.5=24 but when boundaries are open no of pillars = no of segments +1=(60-5)/2.5 +1=23 it is similar to the seating arrangement problem of circular table and row
@moriwahfelix7309
@moriwahfelix7309 5 жыл бұрын
Pls sir how can I get the lecture 1-5 of the video to download
@ankitchauhan3207
@ankitchauhan3207 7 жыл бұрын
structural steel =152.59 kg?
@ParthVaity-yi4wn
@ParthVaity-yi4wn 5 ай бұрын
How? Mine came 153 kg. Here is what I did 1) total ht of ISA=0.55m 2) Total no of pillars= 23 3) Total wt of ISA=12.1 kg/m Therefore, total wt= 0.55x23x12.1 = 153.06kg
@fakhrysami
@fakhrysami 3 жыл бұрын
Thanks clear
@karamveersinghtomar4874
@karamveersinghtomar4874 5 жыл бұрын
How to calculate brickwork
@rameshatla8668
@rameshatla8668 5 жыл бұрын
sir i want to more videos sir plz send
@Sprkoppal
@Sprkoppal 4 жыл бұрын
👍
@fakhrysami
@fakhrysami 3 жыл бұрын
Thanks
@shaikirshad2872
@shaikirshad2872 5 жыл бұрын
remove subtitles pls because its not comfortable to understand ..
@abbashusainkhan8249
@abbashusainkhan8249 3 жыл бұрын
You can change in settings
Description of items
22:49
Principles of construction management
Рет қаралды 24 М.
Estimation of project cost
28:28
Principles of construction management
Рет қаралды 37 М.
GIANT Gummy Worm #shorts
0:42
Mr DegrEE
Рет қаралды 152 МЛН
What is Bill of Quantity (BOQ)? Explained in Detail WIth Example
15:27
Engineering Academy
Рет қаралды 422 М.
How to Calculate Steel Quantity in Slab.
14:32
Online Engineers
Рет қаралды 99 М.
Economics decision making in construction projects
31:08
Principles of construction management
Рет қаралды 26 М.
Long Wall Short Wall Method | Estimation of a building by Long Wall and Short Wall Method
22:55
All About Structural Analysis and Design
Рет қаралды 154 М.
Quality control in construction
41:47
Principles of construction management
Рет қаралды 79 М.
Record Truss Bridge 2012 - University of Auckland Engineering
6:34
FrascoTecSolutions
Рет қаралды 6 МЛН
Dispute resolution in construction projects
30:10
Principles of construction management
Рет қаралды 22 М.
Different types of Estimates - (Quantity surveying & Valuation) - (Lecture - 2)
24:10
CIVIL ENGINEERING CHAPTERWISE
Рет қаралды 14 М.