intersting two trams running in same direction normally tracks in two directions but rare to see it
@tyjoseph73432 жыл бұрын
Yeah :) They were testing the electrification catenary (overhead wire) systems to make sure they can fully power the trains operating on both lines using the same substation for power at any one an area of track.
@epicgamer420693 жыл бұрын
What you see here is the two most important jobs: the two dudes holding the stop signs on the sidewalk.
@metropolitantransit72763 жыл бұрын
This one has 2 cabs unlike the Eglinton LRT which has 1 cab per unit.
@tyjoseph73432 жыл бұрын
Plus its two sections longer! I like the increased length of 7 units (Eglington and Waterloo have 5) and even with that extra length, will still operate as two-cars (two LRVs) long during rush hour, which will be awesome to see!
@maurixiogarciasanchez22782 жыл бұрын
They need a train from the Airport to downtown.
@SkyOfTheUniverse3 жыл бұрын
Nice
@nathantaylor70263 жыл бұрын
two! of! them!!!
@amo_res92662 жыл бұрын
I can’t wait for this to be operational
@mariawong6965 Жыл бұрын
Dream for it then!
@MrSquareart2 жыл бұрын
Nice video!!!!!
@Mnedho_Vision20502 жыл бұрын
Still testing, will it ever run in real?
@bandvitromania96423 жыл бұрын
Looks nice
@HELLH0WND2 жыл бұрын
That's a lot of squeaking goin' on for something that hasn't had one paying customer yet.
@tyjoseph73432 жыл бұрын
That's actually quite common and to be expected, especially with new vehicles on a new track going into a curve, and actually helps build traction. Nonetheless, you usually see this fade overtime as the vehicles are 'broken-in' just like a new car :)
@mariawong6965 Жыл бұрын
It is ridiculous that 7 years, the line still not in service. I think the whole project should be fired!
@ZBS44683 жыл бұрын
I made a lrt vid
@ZBS44682 жыл бұрын
Thanks check it out love your time-lapse lrt
@minion9862 жыл бұрын
@@ZBS4468 thank you. I plan on doing one for the Valley Line. Hopefully i wont be using a trail version editor with the damn watermarks