Рет қаралды 17,457
The Green Line is a rapid transit line in the MARTA rail system. It operates between Bankhead and Edgewood / Candler Park stations, running exclusively inside the Atlanta city limits.
The Green Line is a stub of the originally planned North Line, which would have served points north beyond Bankhead such as Northside Drive in Brookwood Hills, serving the Perry Homes projects along the way. But the line was only ever built as far as Bankhead. It shares trackage with its counterpart, the Blue Line, between just west of Ashby and Edgewood / Candler Park. Green Line rush-hour trains start at Avondale and pass Decatur and East Lake without stopping before pulling onto a pocket track just east of Edgewood/Candler Park.
The Green Line runs above ground, at-grade and below ground in various portions of its route. It begins at the western terminus of Bankhead station, paralleling Proctor Creek through West Atlanta. (This is the only portion of the Green Line not to share trackage with any other route, albeit a short distance.) It is joined by the Blue Line before Ashby station. The Green Line enters downtown Atlanta, where it meets the Red and Gold Lines at Five Points station. It continues into East Atlanta, where the Green Line reaches its eastern terminus at Edgewood/Candler Park station, while the Blue Line continues on to Indian Creek station. Enjoy!
Join this channel to get access to special perks!
▶️ / @djhtransport
Click here to Subscribe! bit.ly/SubwayVideo
"Like" the Facebook page! ▶️ / djhtrains
Check us out on TikTok! ▶️ / djhammerstrains
Join the Transportation Facebook group! ▶️ bit.ly/TransportFB
Follow us on Twitter! ▶️ / djhtrains
Taken in March 2023.