Full Cycle 6-meter round narrated

  Рет қаралды 127,028

Jory Dion

Jory Dion

Күн бұрын

Пікірлер: 284
@lakshansamarasinghe2439
@lakshansamarasinghe2439 2 жыл бұрын
Appreciate your effort and clear commentary to deliver the first hand experience as it is!
@dotdissonance
@dotdissonance 7 жыл бұрын
So much attention to detail and patience (it seems). Thanks for talking the time to show this.
@rexm3669
@rexm3669 7 жыл бұрын
This was really cool to see mining at this scale. I've only ever worked on tiny jackleg headings
@williammoses6460
@williammoses6460 3 жыл бұрын
I never worked UG. I had overwhelming desire to go home at the end of the day. I really admire, and understand, the joy of a good crew. You guys are good. “We get to play in the sandbox. With the water hose. And we get paid for it.” I miss the work.
@jeremym9739
@jeremym9739 3 жыл бұрын
I worked underground as a diamond drill offsider, it's not for everyone that role, I don't like being underground for so long, just away from the sun etc. Feels depressing
@ALAPINO
@ALAPINO 7 жыл бұрын
AvE sent me here to your channel a long time ago and I always love this sort of content. Thanks, Mate!!!
@CamMacMastermusic
@CamMacMastermusic 5 жыл бұрын
ALAPINO same here ! Awesome workings !! Love Ave too ... whoever the frig he is !
@gragor11
@gragor11 4 жыл бұрын
AvE sent me here too. What a guy. He also sent me to Abom.
@ALAPINO
@ALAPINO 3 жыл бұрын
@Hilma Gegenheimer FYI to anyone reading this, this is some sort of weird bot set up that has these two have a fake conversation about Instagram password hacking. Pointless and ineffective.
@jackglossop4859
@jackglossop4859 2 жыл бұрын
Not sure why I’m watching this video for the third or fourth time. I just find it so incredible. It’s another world.
@JoryDion
@JoryDion 2 жыл бұрын
That comment makes my day . So glad you enjoy it . I love sharing
@JoryDion
@JoryDion Жыл бұрын
No diamond drillers on this site ..it's not a mine
@JoryDion
@JoryDion Жыл бұрын
@daniellysohirka4258 for water .
@becker990
@becker990 7 жыл бұрын
I'm speechless... This is off the charts of how incredibly amazing... This really puts things in perspective up here where the sun shines... I feel... USELESS
@mattd5256
@mattd5256 7 жыл бұрын
Cheers for posting this, this not much of this that has been filmed and put for everyone to see, let alone with commentary from someone who's there working at the face Definately a bit different to the U/G mines I have worked at in northern WA/NT, Australia. Everywhere I've worked a jumbo does all the scaling, mesh and bolting and then charging is done with a normet or orica charge rig. I've never even seen a dedicated machine for scaling nor a twin boom jumbo with a man cage, although everywhere I worked has had sandvik drills not atlas
@delsen.oboisen2245
@delsen.oboisen2245 Жыл бұрын
Well detailed and compiled. Great narration too. Appreciate your time and effort in sharing this. ✌🏽👍🏽💯💥💣⛏️ This is Gold.
@RobertSzasz
@RobertSzasz 7 жыл бұрын
Also was sent over from AvE a long long time ago. The vids where you just show what happened are interesting, but the explanation makes it easier to understand.
@rao-foto
@rao-foto 3 жыл бұрын
Super interesting. I work as a surveyor (engineer) in civil projects. Never done the ground works like this though. In the tunnels I've been it was already blasted, ready for construction of services, roads, constructions inside etc. You don't understand how moist, dirty, dusty, muddy, noisy and wet a raw tunnel is untill you work in one, as you would know :D I was very happy when we finally built a provisional road from crushed and compacted rock to move us up and away from the mud...
@TheCaptainSeven
@TheCaptainSeven 3 жыл бұрын
Dude, this was awesome to see the process, as someone who is going underground for the first time, soon. Thanks for the effort!
@timtrainor9720
@timtrainor9720 3 жыл бұрын
This is a great training video, you and your crew should be proud. That little girl sure is a time and lifesaver. I never did any hardrockin but I did work 8 yrs at 10,500' in a 30' uncontaminated beautiful Anthracite coal seam. We went 8,000' at a 15% pitch down under the mountain, 12 mi. from Aspen, Co.(as the crow flies) doing "Room and Pillar mining. At the Dutch Creek #1,2 and #3 mines. Most exciting time of my life. There were many tragedies and many rewards but theres nothing like working with a well oiled crew. That was 40 yrs. ago and I still miss a lot of those guys. Ty, you did a great job on the video.....wait for it......lol
@propaycheque
@propaycheque 4 жыл бұрын
Underground Life! ... that vent tube was gorgeous
@bunyip7343
@bunyip7343 4 жыл бұрын
Excellent work Jory! Your narration is really clear and helps explain all aspects of the process, whilst also providing tips and advice on best practice and what to look out for. Love the Boomer E2!
@JoryDion
@JoryDion 4 жыл бұрын
thanks for watching and the comment! I love the boomer E2 also
@bunyip7343
@bunyip7343 4 жыл бұрын
@@JoryDion Must confess, I work at the Epiroc factory in Sweden - so am perhaps a bit biased about the E2 - would have been really interesting to see how some COP 3030 or 4038 rock drills would have gone in cutting down the drilling part of the cycle - especially as you were doing 6m rounds. Though for that Canada needs to try 1000V systems due to the power requirements (95/110kW powerpack per rock drill)...... I have forwarded a link to your page to some of my training department colleagues - hope that is OK? I really like the style you have used in presenting the tunnelling process for this hydro tunnel job in BC (also like your mining clips as well). Keep safe, and Happy New Year!
@JoryDion
@JoryDion 4 жыл бұрын
@@bunyip7343 Epiroc factory in Sweden!?! So cool 😍. I really miss the E2C booms for side winders! I’d be honoured knowing some of my videos making the rounds at Epiroc factory.
@bunyip7343
@bunyip7343 4 жыл бұрын
@@JoryDion Those double rotation units on the BUT 45 booms do make life easier for cross-cutting....they are stiff and fast moving as well, cutting down positioning time. I used to look after the Boomers from 2007-2013, though now have the Boltec/Cabletec machines. Bolting in Canada is undergoing some big changes now with the push for boom bolters vs the old scissor lift stuff... hence Canada is a growing market for my machines. I have been in Sudbury many times over the years. Next time I am in Canada, will have to track you down for a beer..... Covid begone!! Keep safe mate!
@JoryDion
@JoryDion 4 жыл бұрын
@@bunyip7343 I have heard lots of the Boltec but never seen one in action. Would love to see / try and compare to DS411. I have watched some videos but hard to get the feel for the use, all videos are ideal scenarios in a test mine with no screen lol. I love to chat mining or equipment anytime. im on the other side of Canada from Sudbury though lol. I have personally kinda moved on from Jumbo to new bolters myself . The operating of the new bolters is super fun and in my opinion more complicated and lots of room for creativity in machine operation.
@reyalb
@reyalb 4 жыл бұрын
This is perhaps the best UG video I have watched. I've been around the world operating UG. and the quality of the video, the organization of the tasks, the narration.. you should be doing the next UG film (not LOS 33 though). congratulations, more than just informational, it is very inspirational.
@JoryDion
@JoryDion 4 жыл бұрын
Thank you very much.
@Danger_mouse
@Danger_mouse 3 жыл бұрын
Thanks for sharing. You guys do it VERY differently to us here in Australia. After the loader clears the blast, we either use the jumbo to scale and mesh the heading and then check for butts, or the hydroscaler on the shotcrete rig to wash out any holes. Then shotcrete if/when required depending on local ground conditions. Either way, there is never ever anyone under unsupported ground, even if scaling has been completed. That's a big risk removed. We also use the same jumbo to bolt with, before boring the cut. Saves having so many different machines and also the set up time to swap them out.
@JoryDion
@JoryDion 3 жыл бұрын
you use split sets mostly? or? We used just the 1 split feed jumbo for bolting and drilling for a short while. but when we got the big 6 meter slides it gained us a lot of ground over week.
@Danger_mouse
@Danger_mouse 3 жыл бұрын
@@JoryDion Typically, yes. And on the longer decline cuts like the ones in your video, we have a dedicated bolting Jumbo to assist the automated development jumbo. Australia was the reason, back in the day, that companies like Sandvik (Tamrock) offered the Extra Swing components on the rails to get around 90°deg to the roof and walls.
@JoryDion
@JoryDion 3 жыл бұрын
@@Danger_mouse I have always wanted to see the ground support method in Australia. do you add each split set by hand? or have a carousel? I have done lots of split setting with jumbo but have a hard time imagining the safety efficiency method for full ground support.
@Danger_mouse
@Danger_mouse 3 жыл бұрын
@@JoryDion The operator typically has a drill off-sider who loads bolts into the rail for the jumbo operator. By turning the rail around, the off sider can remain under supported ground during loading. Operators generally prefer Power Class Sandviks, with their pilot controlled hydraulics, rather than the electronic Super Drill models due to being able to operate multiple boom levers at the same time to speed up the process. They can be lowering and swinging the boom while rolling and swinging the rail all at the same time. The Super drill is 2 x movements at a time max. Watching a good competent operator lift, drill, hold and bolt a sheet of mesh in place is a pretty cool thing to see.
@JoryDion
@JoryDion 3 жыл бұрын
@@Danger_mouse this is the same method we use but often do not have a helper due to the limited workforce.
@gragor11
@gragor11 5 жыл бұрын
Most interesting video on KZbin. Yes still watching to the end. Excellent sound and camera work. Yes the vent tubing is nice and straight. The cross shift must have put it up for ye eh? As a person who did all this by handish I had great fun figuring out what you were up to. Great camera work and explanations. Our tunnel rounds were, of course, only 8 to 10 feet high x 8 feet wide x 8' deep so different kettle of fish. Nice cut, even straighter than the vent tube. Learning to drill 8 foot long holes parallel with a jack leg has stood me in good hands for the drilling I do now as a renovator electrician. Never wanted to cross holes with a hand held pneumatic drill with hoses all over it to wrap you up. Safety fuse, stick power, nitro headaches, and orange prill anfo. Oh ya and termolite for connecting the holes. 22,000 fps is what I learned as well. Were you using non-els or primacord to the time delayed detonators at the bottom of the holes? Don't need time delays when you use thermolite safety fuse ignitors as the burn rate is something like a couple of inches per second not 22,000. Never have to pump iron when you are working underground, or at least I never did. Just scaling out the round with those long steel scaling bars was quite the work out as was collaring those holes on a 4 or 8" steel in the 80lb jackleg being held in place by a scrawny 145 pound miner. At the end of the day I just didn't weigh enough and had to go learn to do something else. Thanks for showing us what you were doing up there. I could have gone to Myra when I moved back down here in '76 but I knew I was a light weight and couldn't cut it. Plus Myra was trackless and all I had done was tracked so I discovered tree planting instead and later transferred my blasting knowledge over to developing an avalanche control program at Mt W. You learn a lot of life skills underground like keeping your head up and planning ahead plus like you were saying, be efficient, don't waste time and energy, be thorough and do it right the first time for example. I'm going to say it again, outstanding video. Thanks for putting in the effort. Going to share this on the Book of Faces so perhaps you might get a few more hits for such a yeoman effort.
@JoryDion
@JoryDion 4 жыл бұрын
I am not sure how I missed this comment and sorry for a late reply. We used non-els and B-line (primacord) for detonation. Long steel scaling bars all the way rather than the gym for sure! I started in the track drift at Myra actually, they had several track drift parts of the mine all conventional mining. you are probably healthier now from tree planting and avalanche control ;)
@gragor11
@gragor11 4 жыл бұрын
And the award for the best use of Thermolite in a music video goes to . . . . . Muse ;) kzbin.info/www/bejne/rWmugqCmqJKGpck
@Mike_Malloy
@Mike_Malloy 4 жыл бұрын
Very interesting! Thanks so much for sharing all the work that is needed to tunnel.
@Sidicas
@Sidicas 3 жыл бұрын
Interesting to compare this to those channels that explore old mines that have much smaller narrower tunnels.
@Mythrell
@Mythrell 7 жыл бұрын
That is actually pretty impressive stuff. It's easy to forget how advanced the equipment used in these kind of jobs are unless you get to see them. It's all about maintaining and controlling the huge ass machines, it feels like something out of an old sci-fi movies like Aliens. And definitely something I couldn't do with my crappy ass stereoscopic vision. :)
@craignicholson505
@craignicholson505 7 жыл бұрын
Thank u so much for the walk thru on your day
@PauMallol
@PauMallol 4 жыл бұрын
Really cool and informative. Glad “she is fine” after the blasting!
@TomandJulieMineExploring
@TomandJulieMineExploring 4 жыл бұрын
Great job on the video. Thanks!
@knucklesdamone916
@knucklesdamone916 5 жыл бұрын
saw u on ave channel and i had to come see your stuff its cool
@esterling371
@esterling371 2 жыл бұрын
Thank You for Sharing your experience, I´m from Perú
@JoryDion
@JoryDion 2 жыл бұрын
Glad you enjoyed.
@jackglossop4859
@jackglossop4859 4 жыл бұрын
I had no idea at the amount of work that goes into this. I thought you just drill a hole Chuck a banger down it and walk away. I’m amazed. Forgive my ignorance!
@wasinlatamafrica3290
@wasinlatamafrica3290 4 жыл бұрын
Great job Jory!
@wrightfarms9589
@wrightfarms9589 3 жыл бұрын
Absolutely love this!!!
@keenynman34
@keenynman34 2 жыл бұрын
Wild we just bolt, bore, charge, muck, dump for development. Get about 3 rounds a shift. Do the scaling and gs with jumbo
@JoryDion
@JoryDion 2 жыл бұрын
Yes it was weird at first to do it like this. This is not a mine, for civil projects we just do what the engineers want.
@junkus
@junkus 3 ай бұрын
Great ending 40:35. Thank you.
@SJR_Media_Group
@SJR_Media_Group 2 жыл бұрын
Thanks for the expert video clips and narration in easy to understand terms. Your video production time did take longer than a full cycle. Most people only see the 'boom' and nothing else. Planning and Prep is usually unseen by outsiders. All those carefully placed holes drilled themselves, loaded themselves, wired themselves, and magically made many tons of rock go boom and move themselves. Hard rock blasting in a quarry is challenging enough, but controlling it underground is a whole level more difficult. Drilling is much harder, loading is much harder, and mucking is much harder. Mistakes underground tend to be more serious than above ground operations. I have witnessed above ground hard rock blasting. I would love to go underground and see first hand hard rock blasting in tunnels. Can you imagine using some really 'Old School' techniques like hand held drill bit being hit with a sledge. Black Powder rammed into drill holes. Safety Fuse that wasn't so safe. Mucking out by hand and wheelbarrow. Before Black Powder, they would build fires at rock face then throw cold water to shock rock enough to break. Yeah... the good old days were not so good if you were making tunnels.
@JoryDion
@JoryDion 2 жыл бұрын
Glad you liked the video. Makes the effort it takes to make them worth it 👍
@SJR_Media_Group
@SJR_Media_Group 2 жыл бұрын
@@JoryDion I was really impressed with your attention to detail and focus on safety. Your ventilation system was above and beyond: Fresh air in, bad air exhausted out. Water spray after each shot. PM on all equipment. You hit the nail on the head, far less expensive doing it right the first time. I wasn't sure what was being pumped into drill holes after loading stick powder. I heard word 'water'. Didn't know if a slurry type explosive or just to confine force of blast. Water doesn't compress and really amplifies explosion. I have seen others use expanding foam insulation spray in a can to seal off holes. Again, great job with video and your worksite.
@JoryDion
@JoryDion 2 жыл бұрын
@@SJR_Media_Group we pump emulsion it's like liquid stick powder
@SJR_Media_Group
@SJR_Media_Group 2 жыл бұрын
@@JoryDion Thank you it did look like emulsion and not water. I know on large quarry operations, emulsion is less expensive than stick. They use enough stick to ensure all emulsion detonates. What amount of delay do you build in ? Final scene in video couldn't really tell, but there was a decent delay between blasts.
@111jkjk
@111jkjk Жыл бұрын
i didnt know these tunnels were so massive
@JoryDion
@JoryDion Жыл бұрын
The more you know right
@fiaapog
@fiaapog 4 жыл бұрын
muy bien video!, gracias por compartir.
@avo-autonomousvehicleorgan1899
@avo-autonomousvehicleorgan1899 7 ай бұрын
Fantastic videos and narration! We should connect as my company is building some phenomenal tech to improve efficiencies and safety of these headings.
@JoryDion
@JoryDion 7 ай бұрын
Send me an email
@BrendanHampshire
@BrendanHampshire 3 жыл бұрын
Very informative and interesting, thank you!
@garymcknight9032
@garymcknight9032 2 жыл бұрын
Did you take a shift to advance your services (air, water, drain, vent, etc) or was that done during one or more of the activities in your video? Thanks for an informative description of the development round
@JoryDion
@JoryDion 2 жыл бұрын
services where usually installed behind the jumbo during the bolt / drill part of the cycle
@chrisstaylor8377
@chrisstaylor8377 2 ай бұрын
Amazing vidio have worked in open caste .coal iron ore .love being involed in blasting
@backcountryshitok
@backcountryshitok 5 жыл бұрын
Hell yeah beachday sandbox . That's gonna be my attitude for the first hours tomorrow morning
@JoryDion
@JoryDion 5 жыл бұрын
oh ya buds. sandbox all the way
@markmayer2029
@markmayer2029 Ай бұрын
Hi Jory, How did you drill and load the perimeter holes? Spacing and hole size? Thanks for putting out the best under ground videos on all of KZbin!
@JoryDion
@JoryDion Ай бұрын
@@markmayer2029 here we did sheer holes. So we drilled extra perimeter holes and then loaded every other hole with stick powder and traced with 200 grain det cord. Used a 45mm bit
@AndyRAK
@AndyRAK Жыл бұрын
Collar prime your first hole or anything special to pull 6 meters? Especially with 4 reamers
@JoryDion
@JoryDion Жыл бұрын
No why would collar prime ? Very precise home burden is key I think
@AndyRAK
@AndyRAK Жыл бұрын
@@JoryDion Never tried it just heard it helps clear the cut better in the deeper/softer rounds.
@JoryDion
@JoryDion Жыл бұрын
Can't say I have ever tried that or understand how it would work. Very interesting
@AndyRAK
@AndyRAK Жыл бұрын
@@JoryDion I guess the idea is you start clearing rock from the collar first leaving more room as the hole detonates towards the back.
@8spc1
@8spc1 Жыл бұрын
I've been in mining for 18 years in various roles in several mines in Canada and the USA. I have to say this is the first time I've seen someone go under unsupported ground (even with a canopy over them to paint up the bootlegs. What Province is this?
@JoryDion
@JoryDion Жыл бұрын
Ya it was wierd . It's not a mine it's a tunnel so different rules 🤷‍♂️
@a-aron2379
@a-aron2379 Жыл бұрын
Is that a Normet scaler? Series? Looks Normet tan/yellow in the light. Guy painting bootleg with the basket going under unsupported ground, even with a FOPS, is unusual. Same for that bolting cycle, haven’t seen it done quite like that in the 7 different countries i have worked in. I always enjoyed spraying shotcrete myself, something satisfying about it for me.
@JoryDion
@JoryDion Жыл бұрын
Not sure on the scaler model . Before the scaler we went in the basket and hand scaled ! Doing a civil Job in the tunnel was all different rules from mining . It was wierd at first
@af.tatchell
@af.tatchell 4 жыл бұрын
Really fascinating stuff, and amazing how intricate the process seems. I was wondering during the blast at 40:36, what caused the spark below the vent tube?
@JoryDion
@JoryDion 4 жыл бұрын
good eye. That was fly rock.
@Sam-81_98
@Sam-81_98 3 жыл бұрын
Really Cool. Thanks for the video. Where is this mine located?
@JoryDion
@JoryDion 3 жыл бұрын
its a hydro tunnel not a mine. Working in both minining and tunneling I can say they are both underground but different for sure.
@oneononehiggo7921
@oneononehiggo7921 3 жыл бұрын
Why are they installing bolts in in supported ground,and can they drill and bolt with jumbo at same time
@JoryDion
@JoryDion 3 жыл бұрын
The shotcrete is temporary support that men are allowed to work under. The additional bolts are for long term ground support.
@rutherfordclan5693
@rutherfordclan5693 4 жыл бұрын
Imagine back in 1800s how they would do this by hand.... HARD HARD WORK
@JoryDion
@JoryDion 4 жыл бұрын
RutherfordClan yes to hard , that’s why we made machines 🤷‍♂️
@rutherfordclan5693
@rutherfordclan5693 4 жыл бұрын
Exactly, if the historic miners could see how advanced mining has become ....incredible
@Porty1119
@Porty1119 4 жыл бұрын
@@rutherfordclan5693 I know guys who started mining after WWII with jacklegs and overshot muckers and wound up working trackless mines with longhole stopes and RRC LHDs. The industry has come a very, very long way in the last fifty years.
@tpmanihuales483
@tpmanihuales483 4 жыл бұрын
thank you, nice job.
@lesflynn4455
@lesflynn4455 3 жыл бұрын
Impressive stuff. I have zero knowledge of underground mining. This is really interesting to me..
@SageThyme23
@SageThyme23 Жыл бұрын
Great video
@JoryDion
@JoryDion Жыл бұрын
Thanks glad you enjoyed
@AndrewWalsh23
@AndrewWalsh23 2 жыл бұрын
This is so cool! How deep down are you, what’s the temperature down there?
@JoryDion
@JoryDion 2 жыл бұрын
Not that deep maybe couple hundred feet 🤷‍♂️. Similar tempnas outside maybe 5 degrees warmer
@gwabmpofu8650
@gwabmpofu8650 5 жыл бұрын
what are minerals are you mining? this is very interesting and professional
@lukea9873
@lukea9873 2 жыл бұрын
gonna be doing this in qld australia soon coal mine thanks for the vid
@JoryDion
@JoryDion 2 жыл бұрын
Congrats
@lukea9873
@lukea9873 2 жыл бұрын
@@JoryDion thanks, ya from the looks of things pretty similar, we export coking coal to china
@venturedcanada2848
@venturedcanada2848 Жыл бұрын
Dude, nice video. But I blown away that you guys are allowed to go under the unsupported ground. I’ve driven probably 10 miles of ramp, lateral drives, raise, shaft, etc. and I’ve never seen crews actually allowed to go under unbolted ground in a jumbo heading to do the prep work and bolt installation that is show in this video. The only time ive seen it part of the process is in raise mining and some jack leg sub drifting. Where is this video being shot? Nice drilling FYI.. lol
@JoryDion
@JoryDion Жыл бұрын
It was weird for us at first to. The shotcrete is considered ground support and the bolts are just extra. There was no screen used at all in this project.
@snowmobileguy101
@snowmobileguy101 11 ай бұрын
Is it common practice to stand beside the boom while shotcreteing as seen in this video we just had a guy die at the mine I work at when he allegedly fell and hit the controls in a way during the fall that caused the boom to crush him, the remote was pinned under him and the boom so they could not get it off him quickly
@chrishare3981
@chrishare3981 Жыл бұрын
That’s artist work
@digitor24
@digitor24 4 жыл бұрын
The ground control is really impressive alot of extra care I'm not used to seeing.
@JoryDion
@JoryDion 4 жыл бұрын
Saythein this is a civil project . Underground yes but lots more control then mining. Engineers where always watching a taking notes for their bosses .
@digitor24
@digitor24 4 жыл бұрын
@@JoryDion Oh ok that makes sence now. Ya we usually scale and bolt and sometimes screen brows but nothing like that. I also noticed you screen the ribs we almost never do that either.
@JoryDion
@JoryDion 4 жыл бұрын
Saythein not sure where in this video you saw any screen at all. Was all fiber shotcrete and mechanical bolts. Mining we screen the rib cause the ground here moves a lot so it’s important to bolt it up tight or it falls apart
@digitor24
@digitor24 4 жыл бұрын
@@JoryDion Ya i agree i duno how i flubed that comment, i think i was watching your video on labtop and commenting on phone and was watching that rehab drift with resign bolts. or possibly i saw the bolt plates and just assumed there was screen behind it. no idea but lots of respect you know your shit, i wish we had you at tha mine i work at.
@JoryDion
@JoryDion 4 жыл бұрын
Saythein all good! Thanks for the comments
@jacobwilson8537
@jacobwilson8537 Жыл бұрын
Looks like a cold mine with those jackets on
@JoryDion
@JoryDion Жыл бұрын
Ya it's actually Christmas during the shotcrete section. I was left to spray while everyone on surface eating pizza 😆
@jacklegminercanada3866
@jacklegminercanada3866 2 жыл бұрын
I ran a Copco m2c for a short while I'm Sudbury. What make is yours?
@JoryDion
@JoryDion 2 жыл бұрын
E2C in these videos
@yoshy4072
@yoshy4072 4 жыл бұрын
I found your vids through AVE also, credit to both you guys!!
@coderedcodered8161
@coderedcodered8161 Жыл бұрын
just used single boom secoma always watched how my water was coming of the end of the boom
@JoryDion
@JoryDion Жыл бұрын
Water watching is a good trick . Good for checking the grade of your road also
@MrSamueladerach
@MrSamueladerach 5 жыл бұрын
Hi Jory Dion. Very impressive stuff!!! Would you be ok if I use 3 seconds of your video (The explosion part) on a video Project of mine? Cheers
@JoryDion
@JoryDion 5 жыл бұрын
Sam Couto ya sure no problem
@MrSamueladerach
@MrSamueladerach 5 жыл бұрын
@@JoryDion Thanks! :)
@yoshy4072
@yoshy4072 4 жыл бұрын
Standards and procedures and bonus systems vary, and tie your hands so to speak, but if the drilling was my option, I would be breaking that round nicely with under 80 holes. Sorry not meant to criticize, we needed to cycle this round in 24 hrs to make money. Nice to see different methods and equipment, I loved drifts this size but also loved smaller jack leg drifting. Good memories.
@JoryDion
@JoryDion 4 жыл бұрын
Yoshy small heading where my fav , i agree it could have been blasted In less but was heavily engineered controlled... I just drill to the plan or they give me shit ...we did cycle this 6m in 24 hours so Methods are up for debate. On this project I’m just a simple operator who crushed engineering job task completion expectancy .
@christinespencer406
@christinespencer406 10 ай бұрын
Slow progress how much advance 24hours .howhigh is the coal is it long wall or boared and pillar 😊
@JoryDion
@JoryDion 10 ай бұрын
Not coal at all. 8.5x8.5 in most areas. Some.larger some smaller This is a hydro tunnel no coal in site
@coderedcodered8161
@coderedcodered8161 4 ай бұрын
what is the temp in this stink hole? thanks
@JoryDion
@JoryDion 4 ай бұрын
@@coderedcodered8161 I'd say average 15-20 degree Celsius. 5 in the winter
@uptide1214
@uptide1214 7 жыл бұрын
at 27 mins that reamer has a cool sound
@uptide1214
@uptide1214 7 жыл бұрын
also, how many of these can you guys do a day? It seemed like that took all day.
@haripidikiti7052
@haripidikiti7052 2 жыл бұрын
Awesome! HI, Can we know the number of reamer holes and dia drilled and the pull you are getting?
@JoryDion
@JoryDion 2 жыл бұрын
I was drilling 5 3'' reamers, 6M pull. Pull being the the amount of ground broken after the blast?
@boxtruck.5014
@boxtruck.5014 3 жыл бұрын
awesome video ! cheers for sharing, one question.. was this cycle performed in one day? would the next day be exactly the same?
@JoryDion
@JoryDion 3 жыл бұрын
The cycle was avg about 11 hours. Usually was the same thing everyday unless someone had a really good or bad day (night shift / day shift)
@gantiraabdillah1349
@gantiraabdillah1349 3 жыл бұрын
nice vidio bro, piece miner from indonesia
@mkhodaveysi1636
@mkhodaveysi1636 7 жыл бұрын
In one word: Perfectly Narrated! Well done! I just think that drilling burncuts is missed out? an maybe extending services as well. I greatly appreciated if you just add to the cycle timing above how long it actually took as well for instance: mucking 1 hour. and one last thing, how big is the profile? and the blasting depth is 6m or is it 6*6 drive profile?
@JoryDion
@JoryDion 7 жыл бұрын
profile is 8.3m-8.5m
@ricklarade3593
@ricklarade3593 3 жыл бұрын
where do you guys work, every job i've ever been at, you are not allowed forward of the jacks when in operation
@ricklarade3593
@ricklarade3593 3 жыл бұрын
looks like a vent repair...lol, thanks for the cycle!!
@JoryDion
@JoryDion 3 жыл бұрын
This was a civil project in Canada that is now complete. You are correct about not workings infront of jacks when machine in operation. If the job required a man near the drill we would do a JHA (job hazard assessment)
@mitchtrochimchuk7494
@mitchtrochimchuk7494 Жыл бұрын
Why not ground support installed first ?
@JoryDion
@JoryDion Жыл бұрын
Shotcrete is ground support apparently. Also can't spray over the bolts because they get grouted
@mitchtrochimchuk7494
@mitchtrochimchuk7494 Жыл бұрын
Long process for a round. Why shotcrete every round??
@JoryDion
@JoryDion Жыл бұрын
This is a hydro service Tunnell. No plans for rehab. And additional construction later on
@JoryDion
@JoryDion Жыл бұрын
@@mitchtrochimchuk7494 Engineers 🤷‍♂. Civil project, spare no expense when its tax dollars paying for it
@jacklegminercanada3866
@jacklegminercanada3866 2 жыл бұрын
Man basket doesn't get in the way ever? On the jumbo I mean
@jacklegminercanada3866
@jacklegminercanada3866 2 жыл бұрын
Nevermind, seperate bolting jumbo
@JoryDion
@JoryDion 2 жыл бұрын
Man basket can be lame doing side winders or something but most of the time it's handy.
@Ausheshkumar_verma.347
@Ausheshkumar_verma.347 3 жыл бұрын
From india ❤️🇮🇳
@tynan555
@tynan555 7 жыл бұрын
I'm an apprentice electrician in Vancouver, is there any companies I can apply to up north or on the island to get into this sort of stuff?
@krisbailey7160
@krisbailey7160 7 жыл бұрын
Tynan Cuthbert nyrstar which owns Myra Falls Mine is re starting on the island. Or you might want to try New Gold news afton mine in Kamloops.. lots of open pit mines in the province too..
@mattricher21
@mattricher21 3 ай бұрын
What is your Cut?
@JoryDion
@JoryDion 3 ай бұрын
I can't remember what exactly it was but I remember 6 reamers My go to is . . . o o . o . o o . . . Looks like crap typing it but u get the idea 😆
@jackglossop4859
@jackglossop4859 4 жыл бұрын
May I ask: why does the blast not just rip that ventilation pipe straight off the wall?
@JoryDion
@JoryDion 3 жыл бұрын
It is hung off chain and ground support bolts. you can have the blast actually pritty close and it survives
@chrisstrobel3439
@chrisstrobel3439 2 жыл бұрын
I take it this isn’t a gem Tourmaline mine, gold mine? Is this all Miner Mike approved? 😉
@JoryDion
@JoryDion 2 жыл бұрын
Not a mine at all. It's a civil hydro tunnel project
@ivansergienko5473
@ivansergienko5473 4 жыл бұрын
Hey bro! Good job! Thanks for your videos, its very interesting to see how our foreign colleagues work. Can you answer, what kind of ground was in this video? We usually use 2 or 3 meter cycles, but 6!!! Good luck and be carefull!
@JoryDion
@JoryDion 4 жыл бұрын
Being close to surface they called it class 1...🤷‍♂️ class 2 and 3 needed longer support. Longer rounds are easier with computer jumbo and controlled blasting .
@hamzajaffri1423
@hamzajaffri1423 5 жыл бұрын
If you didn't shotcrete the rounds, would you still do total station navigation when bolting or would you bolt based on the operators judgement?
@JoryDion
@JoryDion 5 жыл бұрын
This is actually a tunnel job so all ground support is orseen by an engineer. eventually we just switched to pattern bolting based on total station navigation.
@davewrigley82
@davewrigley82 3 жыл бұрын
Look up square setting
@chrisbreedt9599
@chrisbreedt9599 3 жыл бұрын
Whats the company name of the Vent duct
@JoryDion
@JoryDion 3 жыл бұрын
we just used some steel culvert for out exaust duct. ABC is the only Duct company I know really
@hamzajaffri1423
@hamzajaffri1423 4 жыл бұрын
How long does it take you guys to cycle a 6m round? Also what's your average break on the round? Does it always break 6 meters or does it bootleg a bit?
@vanislerc3438
@vanislerc3438 4 жыл бұрын
Hamza Jaffri 24 hours was the cycle time. With 6 reamers it always broke to the nuts. 6.2m was average break. (Checked after every blast )
@hamzajaffri1423
@hamzajaffri1423 4 жыл бұрын
@@vanislerc3438 what length steel does the jumbo have?
@JoryDion
@JoryDion 4 жыл бұрын
Hamza Jaffri 6.4 m
@basticore88
@basticore88 3 жыл бұрын
Hey, great videos you're making there! I work myself in a flourite mine. What are you doing in the ground holes after drilling? Is the wood or hose
@JoryDion
@JoryDion 3 жыл бұрын
we put PVC in the lifters (ground holes) to prevent material from getting in them and so they are easy to find after drilling is completed
@basticore88
@basticore88 2 жыл бұрын
Hey, thanks for the answer, really cool new videos! What size is your big drillbit in the free hole?
@JoryDion
@JoryDion 2 жыл бұрын
4 inch
@chrisbreedt9599
@chrisbreedt9599 3 жыл бұрын
What Vent ducting are ussing
@JoryDion
@JoryDion 3 жыл бұрын
ABC soft duct and just some giant culvert tubes for our exaust
@GrizzledVet
@GrizzledVet 3 жыл бұрын
Cool video. How long in hours or shifts for the full cycle?
@JoryDion
@JoryDion 3 жыл бұрын
Shift and a half. Or just under 24 hours
@GrizzledVet
@GrizzledVet 3 жыл бұрын
@@JoryDion Right on. Appreciate the videos.👍
@JoryDion
@JoryDion 3 жыл бұрын
@@GrizzledVet no problem, glad you like the videos
@001desertrat3
@001desertrat3 6 жыл бұрын
AWW , I was hoping you'd have the remote camera a lot closer so we could actually watch the Face go POOF . LOL
@JoryDion
@JoryDion 6 жыл бұрын
yes me to. was not sure how close i could get lol. was not willing to sacrifice my camera at that time :)
@gragor11
@gragor11 5 жыл бұрын
@@JoryDion That was a way longer blast then the tunnel rounds I described above. And judging by the sparks off the pipe there that camera of yours was still in danger.
@markyes2041
@markyes2041 5 жыл бұрын
@@gragor11 Flyrock appeared to be coming back 35 - 40 metres . he calculated the risk of camera damage pretty well. :)
@gragor11
@gragor11 5 жыл бұрын
When I went to Mining School in Rossland we finally got to blast the round we had been working on all week. We were standing around outside the portal and the instructor kept telling us to stand aside, get back and then finally MOVE IT. Someone got to push the handle of the detonator, setting the round off and a giant rock the size of a human head came flying out of the mouth of the portal at about 5 feet in the air, blew by us and proceeded across the landing and over the edge of the mountain. We were all duly impressed and have stood well away ever since. That was something I had to work on later when I was hand bombing avalanche paths with 1KG sticks of water gel. Being 60 feet away from a lit charge was a bit hard to take.
@gragor11
@gragor11 5 жыл бұрын
@@markyes2041 I'll say.
@carllowe4816
@carllowe4816 6 жыл бұрын
Do you have to be a licensed blaster to load and where is this tunnel.
@JoryDion
@JoryDion 6 жыл бұрын
-son_of Russ yes you need a ticket , or be under the direct supervision of someone with a ticket . This is in British Columbia
@carllowe4816
@carllowe4816 6 жыл бұрын
Awesome video thx for posting I’ve been blasting above ground for 15 yrs now and have always heard about tunnel shooting and wondered about the process.
@Porty1119
@Porty1119 5 жыл бұрын
Not in New Mexico, unless working at a surface coal mine, but this tunnel is not in New Mexico!
@nickdemsey7188
@nickdemsey7188 Жыл бұрын
how are you guys okay with the undetonated powered every where? that’s not normal or okay. whoever timed this doesn’t know what he’s doing.
@JoryDion
@JoryDion Жыл бұрын
Im not sure where you are seeing undetonated powder everywhere emulsion was used and there is none to be found . Engineering timed it and gives us blasting prints so we are not allowed to deviate from the plan. If there is a mishole just wash it out no big deal 🤷‍♂️
@Straya501
@Straya501 Жыл бұрын
What are you actually mining?
@JoryDion
@JoryDion Жыл бұрын
I'm not actually mining here in the sense of mineral extraction. This is a civil tunnel project so it's classified ad construction
@mattgirvin2676
@mattgirvin2676 4 жыл бұрын
Great video Jory! Is this in Phillips Reach?
@JoryDion
@JoryDion 4 жыл бұрын
negative. way to professional. John heart project.
@jukesters123
@jukesters123 3 жыл бұрын
Cheers man HUGS still???nnorm here. hows the old man?
@JoryDion
@JoryDion 3 жыл бұрын
Retired and enjoying it. Hugs still yes
@jukesters123
@jukesters123 2 жыл бұрын
@@JoryDion i was like Whattt.they got a scaler??wow.it took 30 years.
@JoryDion
@JoryDion 2 жыл бұрын
@@jukesters123 ya this was in the Tunnell . We still don't have a scaler mining but power coard helps alot with cutting back on loose. Also row bolters are so big we don't have to go any where near open ground anymore
@jukesters123
@jukesters123 2 жыл бұрын
@@JoryDion Sweet.In my time 4 fatalities.this is what is needed there.
@kabaghesunday3865
@kabaghesunday3865 3 жыл бұрын
do these booms hit each other at some point?
@JoryDion
@JoryDion 3 жыл бұрын
only if the operator sucks
@michaelhutchinson1789
@michaelhutchinson1789 4 жыл бұрын
Hey Jory, just started as an air-leg nipper, any hot tips?
@JoryDion
@JoryDion 4 жыл бұрын
Pay attention. dont be afraid to think outside the box... Just because it's a job that has been done for so many years doesn't mean there isn't a better way to do something. Ask lots of questions. Show initiative. Always be eager to help.
@ThisIsNotAVideo
@ThisIsNotAVideo 5 жыл бұрын
Any exposure to TBMs underground? I read about mechanical excavation making inroads in underground mining, but at the same time drill and blast tools seem to keep improving.
@JoryDion
@JoryDion 5 жыл бұрын
Red Daly yes everything is improving alot depends on who runs project and type
@jossmaxwell00
@jossmaxwell00 4 жыл бұрын
Found this channel and really liked the content. Former UK miner here. Very interesting watch the whole procedure from start to finish. Thanks Jory. Subscribe as well
@TheMarshalMurat
@TheMarshalMurat 3 жыл бұрын
UK coal?
@jossmaxwell00
@jossmaxwell00 3 жыл бұрын
@@TheMarshalMurat British coal. Uk coal was the private sector that took over some mines after closure of the pits
@rivokumaseh3805
@rivokumaseh3805 2 жыл бұрын
Its better to use Hydroscaler
@JoryDion
@JoryDion 2 жыл бұрын
I agree that the mechanical scaler is maybe not the best for every day use. But it sure does a good job on bigger loose
@jacklegminercanada3866
@jacklegminercanada3866 3 жыл бұрын
nice face on 6 meter round dude
@ianels419
@ianels419 4 жыл бұрын
The motivation for a six m round? Won't you cycle better with a 4m round? Great video Tx.
@JoryDion
@JoryDion 4 жыл бұрын
That is a common assumption and in some cases true. We actually destroyed our projected completion time for this tunnel. for every 2x6M rounds you gain extra 4M. so 36m completed in 5 day work week then we had to do 40m probes on Saturday to stay ahead of the development. 20m vs 36m every week was a no brainer for bean counters.
@mattgirvin2676
@mattgirvin2676 4 жыл бұрын
Never mind! Watched to the end, hydro project.
@TCBYEAHCUZ
@TCBYEAHCUZ 3 жыл бұрын
This is incredible, what qualifications or career path does one need to go into to become that operator of the shotcrete boom?
@JoryDion
@JoryDion 3 жыл бұрын
I am sure there are many paths to take. Shotcrete is important underground and not overly saught after. I would say the first step is to get a job at a mine or a tunnel project. Then wait for a posting and make it obvious that is what you want to do. Just keep working at it.
@TCBYEAHCUZ
@TCBYEAHCUZ 2 жыл бұрын
@@JoryDion Just got in underground! finally lol, diamond driller offsider, and will try then get into nipper as I did a bit of research that's where you start in the path towards jumbo!
@JoryDion
@JoryDion 2 жыл бұрын
@@TCBYEAHCUZ Congratulations! Diamond Driller is a pritty cool job. All the jobs are related one way or another. Diamond Drilling is like the scout to where we want to go mining.
@TCBYEAHCUZ
@TCBYEAHCUZ 2 жыл бұрын
@@JoryDion Yup! Just done an 37 dip uphole, my boots are soaked! 😂
jumbo drilling a round + 2 slashes narrated
12:19
Jory Dion
Рет қаралды 6 М.
Gearing in Maclean Bolter
21:13
Jory Dion
Рет қаралды 7 М.
«Жат бауыр» телехикаясы І 26-бөлім
52:18
Qazaqstan TV / Қазақстан Ұлттық Арнасы
Рет қаралды 434 М.
SLIDE #shortssprintbrasil
0:31
Natan por Aí
Рет қаралды 49 МЛН
УНО Реверс в Амонг Ас : игра на выбывание
0:19
Фани Хани
Рет қаралды 1,3 МЛН
Maclean bolting practices
33:29
Jory Dion
Рет қаралды 46 М.
Handling Explosives in Underground Mines
15:02
NIOSH
Рет қаралды 81 М.
Blasting Ceneri Base Tunnel
4:37
Alptransit Gotthard
Рет қаралды 673 М.
3 day cycle. Drill cut out from start to finish
30:03
Jory Dion
Рет қаралды 26 М.
Blowout in Oklahoma
21:20
USCSB
Рет қаралды 3,7 МЛН
The Mine Cycle
53:44
nevadamining
Рет қаралды 540 М.
How Do You Steer a Drill Below The Earth?
14:53
Practical Engineering
Рет қаралды 4,3 МЛН
Miners Unknowingly Enter a Death Trap
16:34
Scary Interesting
Рет қаралды 2,2 МЛН
Newgold Block Caving video
10:02
Breaker Technology, an Astec Brand
Рет қаралды 115 М.
«Жат бауыр» телехикаясы І 26-бөлім
52:18
Qazaqstan TV / Қазақстан Ұлттық Арнасы
Рет қаралды 434 М.