Рет қаралды 39,399
Full Commissioning sequence for the installation and commissioning of a Enphase Battery Storage system with System Controller2 via the Enphase Installer App
Always turn on AC before DC when installing or replacing a battery
Do not plug in wireless comms kit before updating the Envoy
Follow the best practices to wire an RSD (rapid shutdown switch) on IQ8 sunlight and storage backup systems with system controller 2. Not following could cause the system controller to brick.