Рет қаралды 1,109
One of our students attempted to install a difficult Cured In Place Pipe patch but to no avail.
He called us in to get it done. Three hard 90's in a DN100 pipe.
It took a lot of physical effort and some ingenuity to accomplish the repair but we got it done!
The weapon of choice for this repair: Pro-Kanal 70-100 packer with S1E pushrods, pull rope and a lot of elbow grease.
Feel free to contact us at yaacov@prupisplumbing.com or +972.54.323.7877
We offer complex trenchless drain repairs in Israel in addition to training professionals in the field.