Рет қаралды 124,995
Takt Time vs Cycle Time vs Lead Time हिंदी में | Lean Production Terminologies | AYT India Academy
_____________________________________________________________________
Visit Our Website @ www.aytindia.com
AYT India Academy @ / aytindiaacademy
AYT India FB Page @ / aytindia
LinkdIN @ / shakir-mohd-483a75103
_____________________________________________________________________
Channnel Videos:
What is TPM & TPM 8 Pillars : • What is TPM & TPM 8 Pi...
7 Quality Control Tools : • 7 Quality Control Tool...
What is KAIZEN CONCEPT of LEAN : • What is KAIZEN CONCEPT...
Lean Manufacturing सिर्फ 15 मिनट में सीखें (हिंदी) : • Lean Manufacturing सिर...
What is O.E.E (Overall Equipment Effectiveness): • What is O.E.E (Overall...
____________________________________________________________________
Channel Playlists:
LEAN Manufacturing : tinyurl.com/y3...
Quality & Systems : tinyurl.com/yx...
TPM (Total Productive Maintenance) : tinyurl.com/y3...
Inventory & Store Management Series : tinyurl.com/y3...
G-Suite- Google Form, Google Sheet etc. : tinyurl.com/y3...
PPT / MS- PowerPoint Classes : tinyurl.com/y3...
-------------------------------------------------------------------------------------------------------------------
Music: www.bensound.com
-------------------------------------------------------------------------------------------------------------------
Reference:
-------------------------------------------------------------------------------------------------------------------
About Myself: Shakir Mohd (B.TECH)
• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
Welcome Footwear, Bahadurgarh
RKP Packers, Delhi
Presto Stantest Pvt., Faridabad
United Cores Private Limited, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
Durga Engineering Works, Faridabad