Thanks..... don't forget to subscribe..you will get more useful videos on this channel and also share videos with friends
@gufrankhan99844 жыл бұрын
very good .. explained
@shaikhshahzad71774 жыл бұрын
Thank you for made this video.
@brijeshkumar-bk6xv5 жыл бұрын
Useful information...
@arsalanbaig3304 жыл бұрын
Short and useful video. Thanks. Please keep the video short as possible as you can, similar to this one.
@kahat14483 жыл бұрын
Good
@pg39164 жыл бұрын
👍👍
@Aamir.Allinone Жыл бұрын
Thanks
@mdshamshiralam69494 жыл бұрын
Thank sir pressure differentioal transmition or kuchj clearance kitna pic lga skte hai or kis kis location me sir
@usmankhalid29544 жыл бұрын
Best regards from Pakistan Sir kindly explain in detail about low delta t syndrome. Please it's a kind request. Always stay Blessed
@mdshamshiralam69494 жыл бұрын
Ake Research park ka building hai ous building 10 Raised hai to mai kis Raised me lga ye DPT or chill water ka plant low side dusre building me hai sir jii to mai kai se install kare sir jii
@HVACWorld4 жыл бұрын
Furthest point pe lagate hai DPT...aap top point pe lagao
@VIVEKKUMAR-99553 жыл бұрын
Mujhe ese lgane ka pura trika btay
@HVACWorld3 жыл бұрын
Ok
@SwalihMuhammad-h2s Жыл бұрын
Brother how to connect DPT to vfd ? DPT connect to DDC rite ?
@mdakhil26473 жыл бұрын
Sir pump ki vfd connected to DPT...agar pressure difference zyada hoga to command jayegu aur dheere dheere vfd speed of pump ko kam ya zyada karega??? Agar yehi system constant flow pumps hogato...i think DPT ki zaroorat nahi hogina???
@HVACWorld3 жыл бұрын
Ok
@sadmemory54104 жыл бұрын
Sir live dikha do kis jagah me install karte h ?
@HVACWorld4 жыл бұрын
Ok
@edupurpose6031 Жыл бұрын
Sir i have completed my diploma in mechanical engineering meri soch hai ki mein hvac Field mein apna career bnao,aap btaye starting kaun ki course se krun .
@VickySingh-nm1sy11 ай бұрын
I'm diploma and working in hvac field
@mustafaabdalla19593 жыл бұрын
Thanks sir, please tell me how can set the point, and which dpt should be used?
@sreekanthshaji95965 жыл бұрын
DPT is not installed at the top , but at 2/3 rd of the riser ....
@IrfanShaikh-wk8lk4 жыл бұрын
it should install at end of supply & return line
@gufrankhan99844 жыл бұрын
we can install near chiller in and out line
@Rameshkumar-hm6sj3 жыл бұрын
What is the least count of it and from I can get this? I need it for research purpose. Help me
@Premkumark904 жыл бұрын
Sir,if we by pass the return line then there no pressure development in pipe line ,then what is the use of this?
@VIVEKKUMAR-99553 жыл бұрын
मुझे इसे लगाने का पुरा तरीका बताए
@syauqisabili37765 жыл бұрын
it is possible to connect this sensor to microcontroller?
@HVACWorld5 жыл бұрын
Yes....DPT is generally installed on the top most point of the chilled water riser and this sensor is connected with controller through communication wire
@syauqisabili37765 жыл бұрын
@@HVACWorld what is the communication protocol of this DPT sensor? Or just analog data? And this sensor can measure flow rate?
@HVACWorld5 жыл бұрын
It gives analog input (0 to 10V DC) to controller pane and then controller gives command to Vfd to modulate the VFD speed
@HVACWorld5 жыл бұрын
It can't measures the water flow..it can only sense the pressure difference between supply chw and return chw pipe/riser
@syauqisabili37765 жыл бұрын
@@HVACWorld hmmm. I mean from the getting ∆P we can measure flow rate? From the eq. Q=C√∆P .