Best video I’ve seen on the timeframe of building a home.
@TyWilde3 жыл бұрын
Thanks for the compliment & for watching my video. I appreciate you more than you know. Are you building a home somewhere?
@TyWilde3 жыл бұрын
Thanks for the compliment & for watching my video. I appreciate you more than you know. Are you building a home right now?
@sidneywynn40893 жыл бұрын
I’m in the process of building. They just just excavated the lot last week. So I’ve been looking for a video like this one. This one was the best!! Thanks a lot
@TyWilde3 жыл бұрын
@@sidneywynn4089 That's awesome. I've got loads of videos to guide you through the home build process. When they're done framing, you'll want to watch the video on the 4-way & then I have another video for the final walk through & etc. Best of luck & please let me know if you have any questions.
@ne19622003 Жыл бұрын
Doing this now in Macon,Georgia Bibb county. Adams homes some time summer 2024. Good information for this military veteran
@TyWilde Жыл бұрын
Congrats my friend.
@AdventuretainmentTV3 жыл бұрын
Dude, this is your best video YET! A MILLION View worthy for sure!! All those people who are building a homes should watch this video first!
@TyWilde3 жыл бұрын
Thanks brother. A lot of work went into this video. I'm sure it will help a lot of people.
@AdventuretainmentTV3 жыл бұрын
@@TyWilde Keep it rollin'!
@wildecat14413 жыл бұрын
Excellent video. Seems like there's a lot of people building homes right now that can benefit from all your videos.
@TyWilde3 жыл бұрын
Thanks. I hope so!
@dianedo83143 жыл бұрын
Talk about details Ty! I am so anxious of the timeline during this crazy time, lumber costs, contractor shortages, etc. OMG - talk about biting my fingernails here! When u said some homeowners were told 18-24 months for completion for homes to be built - my heart dropped a bit! I am thinking they might have told the homeowners that so they can cancel and resell it for higher price and watch them complete in 12 months! My biggest fear is that my home won't be ready in 9 months which is the estimated timeframe by builder gave me which I signed on 4/5/21 or worse call me to say there needs to be an increase due to lumber cost increasing again. The price went up $5K on new builds since I have signed on. I am coming to hot summer months, holidays, crazy market.... Thank u soooooooo much for the vid Ty!
@TyWilde3 жыл бұрын
Yeah, we're in for some crazy times. There's definitely a lot of unknowns. And you're right, home builders would love for people to cancel so they can resell the home at a much higher price.
@mstoon38913 жыл бұрын
@@TyWilde are they allowed to raise the price even after your under contract?
@mstoon38913 жыл бұрын
@@TyWilde it did not. My builder (Taylor Morrison) has actually been great. Base price on my model went up 10k the day after I went under contract. Hope it stays this way.
@TyWilde3 жыл бұрын
@@mstoon3891 At this point it should. Most builders won't raise prices because it's bad publicity.
@chippope8984 Жыл бұрын
Ty, you're the guy!!! This is sooo helpful. My rental home had a fire and needed to be gutted from the inside. Most of the framing is still in tack with few repairs needed. There were companies that wanted to take over the entire process of completion but I, having done some interior remodeling on a couple flips, I wanted to do it myself so I could save some money and use that savings to get upgrades and a couple footprint changes. I wasn't so sure what it would entail, but after listening to your video's I feel confident that I can get the subs I need and get this home done with all the interior build steps. Thanks! I have decided to let SurfPro do the mitigation part and take over from there. Again, many thanks!!!
@TyWilde Жыл бұрын
So glad I could help. Best of luck & please let me know how it goes.
@Davrainbow2 жыл бұрын
We signed in February 2021 on a
@TyWilde2 жыл бұрын
That is awesome! I'm sure it will be done before you know it. Best of luck!!
@FreedomCounty2 жыл бұрын
Thank you for awesome channel and informative videos! Just FYI - Nowadays, in 2022, it takes 14-15 month to build a home in Texas (Dallas).
@TyWilde2 жыл бұрын
Thanks for the info! I've heard that's happening in a lot of places. In Utah most builders are 12 months.
@debracummins5413 жыл бұрын
We’re stuck for 10 days of nothing, waiting for the cement trucks to become available to pour the basement slab. It’s a crazy time!
@TyWilde3 жыл бұрын
It really is. I can't imagine how we ended up in this spot with all of the technology & up to date data & statistics we have available at our finger tips.
@seriousladywes84563 жыл бұрын
Thank you. Great info
@TyWilde3 жыл бұрын
You're Very welcome! Thanks for watching!!
@willie93973 жыл бұрын
Wow! and not one rain delay, amazing, lol good video Ty
@TyWilde3 жыл бұрын
Utah has actually been very dry this year. Thanks for the compliment on the vid. Have a great day.
@frdnla.3892 жыл бұрын
Hi there! Very detailed video, thank you! I just had my pre-drywall inspection, but the estimated closing date is in 4 months. I hope i move-in sooner, though!!
@TyWilde2 жыл бұрын
You’re welcome. Thanks for watching and for your comment. Best of luck to you.
@sandyjackson85353 жыл бұрын
Thank you so much for this video. We went under contract mid December, and our builder just broke ground on the 12th of April. The earlier part of this week the footings/foundation was inspected. I’m assuming the slab is next. Since this is our first time going through this process, I have been trying to educate myself and keep up with what’s going on. This helps tremendously! Thank you for taking the time out to make this video, your videos help more than you’ll ever know. #newsubbie
@TyWilde3 жыл бұрын
Great timing. Congratulations. I'm so happy to hear that your home is moving forward. Thank you sincerely for the compliment & best of luck. Where are you building?
@sandyjackson85353 жыл бұрын
@@TyWilde Thank You! We are building in Southern Maryland. We are about a 25-30 minute drive from Washington, DC.
@TyWilde3 жыл бұрын
@@sandyjackson8535 You are literally on the other side of the country from me.
@sandyjackson85353 жыл бұрын
@@TyWilde lol, I know right!
@TyWilde3 жыл бұрын
@@sandyjackson8535 Some day I'll make it to the East coast.
@jermaineclarke43173 жыл бұрын
Love your videos. It took my builder 6 months to get my building permit approved. I signed last year in February. Right now we're waiting on the widows to be installed. We did save over 40k on base price because we signed last year.
@TyWilde3 жыл бұрын
Thanks for the compliment. It sounds like you're sitting in a great spot. Where are you building a home?
@jermaineclarke43173 жыл бұрын
@@TyWilde I'm building in Ohio with Schumacher Homes. Thanks for the reply.
@TyWilde3 жыл бұрын
@@jermaineclarke4317 You're welcome. Have a great weekend.
@jhtrico18502 жыл бұрын
Nice. Any reason it look so long to get approved, or were they just working on others first? I signed 2 months ago, I think the permit will finally get approved. There had been pushback from the county because the builder assumed the county would roll over and accept an elevation with less than 70% brick. But now I get more brick than I was promised :)
@destiny130063 жыл бұрын
I’m under contract to build a home in Utah. We put our down payment down mid March and they’re scheduled to break ground the first week of May. Hopefully everything goes smoothly! 🤞🏻
@TyWilde3 жыл бұрын
Yeah, things are crazy. I would expect delays. Who's building your home?
@shanefurudolf9972 Жыл бұрын
Thank you~
@TyWilde Жыл бұрын
You're welcome 😊
@nklingler3 жыл бұрын
Crazy, our timeline is following exactly to this video. They just poured our foundation walls today is 7/6/21. Will be interesting to see how it follows your timeline
@TyWilde3 жыл бұрын
That's great. Hopefully it stays that way.
@nklingler3 жыл бұрын
@@TyWilde Well, it looks like we are falling behind. We just poured the garage on 8/16/21. We do not have our lumber yet either. According to the builder we are supposed to start framing end of this week or first of next. Im not holding my breath on anything at this point. Very frustrating.
@TyWilde3 жыл бұрын
@@nklingler Yep. Here you go. The first of probably multiple delays. As long as you’re prepared for it it won’t be as hard to handle.
@nklingler3 жыл бұрын
@@TyWilde First of many delays was right lol. Our lumber has been sitting next to the foundation for 3 1/2 weeks now. Crazy how nothing is getting done.
@TyWilde3 жыл бұрын
@@nklingler Yeah, first it was a lumber shortage & now the unemployment benefits is so good that we are now having a labor shortage. It's a joke.
@ernieforrest72182 жыл бұрын
Ty, responding to your return message, i was a home builder for over 40 years. Also a licensed real estate broker and a member of the National Assn Of Realtors for over 25 of those years. Now TY, how many guesses do you need as to why i bacame a real estate agent? Fact is i had been selling my own homes for many years before that. Fact also is there isnt a more seedy group than real estate agents as a whole. Which is why so many of them like you for example are making videos in order to promote themselves, while trashing others.
@TyWilde2 жыл бұрын
I’m proud of you Ernie Forest. However, you don’t know a thing about me. You are clearly taking your preconceived notion‘s about real estate agents in general & applying them to me because I’m a real estate agent. I don’t trash other agents on my channel or ever. I don’t need to, nor do I want to. I’m an honest hard-working guy who always has my clients best interest at heart.
@TheMnky73 жыл бұрын
Great Video! You are very knowledgeable! My final walkthrough is 6 days before our close date. Hopefully that will give the builder plenty of time to fix items if needed
@TyWilde3 жыл бұрын
Thanks for the compliment & congratulations. You're almost to the finish line. I'm sure 6 days will be fine, a lot of builders have a similar timeline. Thanks for watching & please let me know if you have any questions.
@TheMnky73 жыл бұрын
I have another question for you Ty as I am hoping you can help. The builder sent us a notice that we are nearing completion and it stated: “A Guided Tour of Your New Home - This is the date and time you will meet with your Home Care Specialist, for your homeowner orientation. The purpose of this meeting is to demonstrate the many wonderful features of your new home. Only buyers on contract are invited to this walk thru. Please remember children are not permitted. The meeting will last approximately 2 to 3 hours. It is imperative that you be on time as these appointments are scheduled back to back daily. We appreciate your cooperation.” During this “guided tour” will the house by fully complete by then or do we just get to see it and see how to use the appliances etc?
@TyWilde3 жыл бұрын
@@TheMnky7 Excellent question. The home should be 99% done. Maybe just final touchups. I would have them show me how to use everything! Best of luck. You're almost done.
@TheMnky73 жыл бұрын
@@TyWilde can we still do the walkthrough if there is no fence and garage door?
@TyWilde3 жыл бұрын
@@TheMnky7 Yes. Just make sure if it's the final walkthrough & they are having you sign something make sure everything they said they would do is in writing.
@rosenieauguste44922 жыл бұрын
Very informative!
@TyWilde2 жыл бұрын
You're awesome, THANKS!!!
@goyaliza3 жыл бұрын
Great video. Some things I've seen too with the process: delays due to weather, delays from the builder side where they build other homes faster in order to get these sold, and try not to get frustrated if you don't see progress on your home and there is progress on other homes (not sure if there's a red flag here). Different materials and even appliances might go out of stock and other choices will need to be made. Last one, (this is not a good or common one) builder builds more homes than planned and this causes issues with the city and utilities thus causing delays for months while they dig for water.
@TyWilde3 жыл бұрын
Thanks for the compliment & your comment. These are all very good points. Often people get upset because other homes are built faster around them. The builder usually builds home in the order in which the building permits are received. But sometimes different materials may slow or speed up the home you are building.
@tannerprebe14893 жыл бұрын
My question is, is it likely for home builder to adjust the cost of the home during the home construction process? And how likely? How would you as the agent help navigate that? Is there any protections for the home buyer? PS you’re awesome.. lol
@TyWilde3 жыл бұрын
That's an excellent question & it can get ugly. A lot of builders right now are giving ultimatums. Things like if you want to move forward, the price is going to be $50,000 more or you can cancel & we'll give you back all of your Earnest Money. Most builders are just eating it, which is cool. As an agent we just need to understand each builder contract. That being said, most builders do have the ability to cancel you without repercussions as long as they return your deposits.
@shawnpetty38373 жыл бұрын
Signed in March, groundbreaking expected late June or July with an expecting closing date between December and February. It's madness, but long timelines like this certainly allow me more time to prepare and put money away. The other crazy thing is the base price of the model I am building is already above the base price plus options that I chose for the house! That is a +25/30k change since signing!
@TyWilde3 жыл бұрын
Oh yeah, it's been crazy with more to come. Where are you building?
@shawnpetty38373 жыл бұрын
@@TyWilde Central Ohio - building a Maronda home
@TyWilde3 жыл бұрын
@@shawnpetty3837 Thanks. Best of luck to you my friend.
@chrissyjohnson68323 жыл бұрын
Question for ya Ty? If a builder forgets to install a fireplace during framing, will that delay the tradesman coming?
@TyWilde3 жыл бұрын
Great question. Yes, most likely. I would definitely prepare for that.
@chrissyjohnson68323 жыл бұрын
@@TyWilde Thank you for responding. I’ll definitely prepare for that.
@TyWilde3 жыл бұрын
@@chrissyjohnson6832 You're welcome. Best of luck to you.
@DaveVideos53 жыл бұрын
Great video ! We are building New home Plumbing just got installed. However waiting on delayed sliding door and two windows . In your opinion do you think completion would be early August ? 2700-3000 sq foot home partial finished basement. builder does not do driveway for landscaping.
@TyWilde3 жыл бұрын
Thanks for the compliment and for watching my video. That is an excellent question and there’s probably too many variables for me to make a educated guess. That being said I probably wouldn’t count on it being done in early August.
@DaveVideos53 жыл бұрын
@@TyWilde 😬 completely understand this . Builder is great ! Very reliable from reviews . Said be in home in 120 days . Contract does say 120-150 days though. Crossing our fingers 🤞 Groundbreaking was in early April
@TyWilde3 жыл бұрын
@@DaveVideos5 Yeah, there's just been a lot of delays for most builders. You never know what's going to slow you down next. Hopefully they hit that date. It's definitely possible, I just wouldn't count on it.
@DaveVideos53 жыл бұрын
@@TyWilde cool thanks again , I went to our property , I did not see a gas meter on the home . I do see gas stake in front that it was run . however at this point . framing is done roof has shingles, plumbing is done . Electrical is not run yet , is it a concern I don't see a gas line running into the home yet? typically would it gas be run in home when electrical is ?
@TyWilde3 жыл бұрын
@@DaveVideos5 That’s a great question. Not necessarily. If you ask the builder what the timing is, I’m sure they would love to tell you.
@najeemullahkhan21993 жыл бұрын
Sir how about osb plywood making factory business ?
@TyWilde3 жыл бұрын
Thanks for your excellent question. I don't know the profit margin of each part of the home sorry.
@jesseigo99672 жыл бұрын
Hey Ty, You mentioned a home builder builds equity the longer it takes the builders.. can you explain how that works ?
@TyWilde2 жыл бұрын
In a market where home prices are going up, the home will increase in value while it's being built. Since you lock in the price at time of contract several months before the home is completed you can easily gain $10k-$50,000 in equity before you ever move in. The market over the next several months will stabilize so I wouldn't expect major gains.
@marciabrown57942 жыл бұрын
What are windows wells
@TyWilde2 жыл бұрын
That is an excellent question. A window well is placed in homes with basement where windows are placed. It's usually corrugated steal attached to the exterior of the foundation wall to hold the dirt back away from the window. Did that answer your question?
@rosenieauguste44922 жыл бұрын
Hello ty I am in the process in starting a real estate development business and this channel is very help TY I have a question for you do you know where home builders order their supplies from? For example plywood and so on also if I am building a home with blocks where would I order the blocks from? I am about to take a home building course soon, but I am very curious about Certain things because I am new to the real estate industry.
@TyWilde2 жыл бұрын
Thanks for watching & for your excellent questions. The supplies come from many different locations all over the US & the world. The builder selects the location that they think is best either because of price or quality & often both. Have a great day & I hope you subscribed.
@lunisean3 жыл бұрын
Paid the Ernest deposit 2 weeks ago and they started the following week. Original start date was June with an end date of December. Now the end date is expected at the end of July. Is this normal?
@TyWilde3 жыл бұрын
No! It's not normal. BUT... Nothing is normal right now. Every single builder is having delays. It's totally annoying but there's nothing anyone can do about it. We are in a sever shortage. What state or city are you building in?
@lunisean3 жыл бұрын
@@TyWilde Las Vegas and the builder is Beazer Homes! And stick to the Oakleys bro! The viper make you look like your pulling off a cyberpunk cosplay 😆!
@TyWilde3 жыл бұрын
@@lunisean Ha thanks. I agree with you on the sunglasses but the vipers are fun. I'm an Oakley's guy all the way. It's tough to beat the comfort & quality.
@kimaugustine34813 жыл бұрын
What are things I need to look for when I go visit my new construction weekly? I'm a first time home buyer and have no idea what I'm looking at or for!
@TyWilde3 жыл бұрын
First off, thanks for watching & for your excellent question. It totally depends on the stage of the home. I think the best answer would be for you to watch my super in-depth video on the new home construction process. Here's the link... kzbin.info/www/bejne/pmqvnXuFnMt8m6c
@parsonj232 жыл бұрын
I started my contract last year July, was supposed to close in April, then May, and then July/ August, well we are in August. Now being told September/Oct. But I was told I have about $30k in equity, I’m just trying to be patient. I could have signed a lease with my apt, but opted to do month to month.
@TyWilde2 жыл бұрын
Yeah, it's been tough for a lot of people who are building a home. Make sure you watch, The Closing Process with Home Builders. Here's the link - kzbin.info/www/bejne/bKiznK2fobmkgac
@parsonj232 жыл бұрын
@@TyWilde Maronda Homes
@parsonj232 жыл бұрын
I’m in Florida and Hurricane season has started so there’s another delay
@TyWilde2 жыл бұрын
@@parsonj23 I love Florida, but there's too many of them dang hurricanes. They ruin everything.
@parsonj232 жыл бұрын
@@TyWilde oh and it’s been raining every day 😩
@djswamy10642 жыл бұрын
You should open a business here in New York.
@TyWilde2 жыл бұрын
Thanks for the compliment. I would love to do that.
@islandsnow3 жыл бұрын
At what point should you hire your own inspector to do an inspection? Pre-dry wall stage? Post-dry wall stage? Before final walk through? All of the above? Not sure if an inspection covers all of that or if it’s all separate and paid separately I know you said your timeline is in normal times but that seems pretty fast how they can bring up a home like that. So in “normal” times it only takes roughly 3 months from excavation to moving in?
@TyWilde3 жыл бұрын
Excellent Questions. Most people just get an inspection at the end. If you're not comfortable with the work the builder is doing, you might want to get an inspection done at the 4-way/pre drywall stage too. A normal timeline is about 4 months, give or take a week or two. Thanks for watching & for your comment.
@davidaoregan3 жыл бұрын
What size square footage home are you assuming. How much is main floor, basement and then 1st floor? Also if I am building a house 2x as big does this mean it takes 2x time? Thanks. The videos are excellent and very helpful. My family and I are moving from Florida to Heber and building with Ivory Homes
@TyWilde3 жыл бұрын
Thanks for watching & for you compliment. I'm so grateful I could help you. I would say anything up to about 4500 sq ft total maybe 3500 or 3600 finished sq ft. You're only adding a few days here or there as you increase in size. Worst case scenario you'd add about a month. Custom homes can take a lot longer & then of coarse in this market, everything is taking longer. BTW, I visited Florida a few years ago & loved it, but I'm very happy here in Utah. Welcome! Please let me know if you have any questions.
@bossent.95753 жыл бұрын
Thanks for making this video, The permit for our home is ready and they can start building just as soon as we leave the design center this week, however it has been raining Almost everyday for the last 3 weeks and we are soon approaching hurricane season. How much delay can Rain cause on building a home?
@TyWilde3 жыл бұрын
Rain is actually one of the biggest pains because there's not a lot that can be done when the rain won't stop. Once the home is framed in with the roof on, the rain doesn't slow things too much. But, up to that point it can really slow things down. Where are you building?
@bossent.95753 жыл бұрын
@@TyWilde thanks for the info and we are building in Jacksonville fl
@TyWilde3 жыл бұрын
@@bossent.9575 Cool. I love Florida.
@SornSam3 жыл бұрын
Do you know if builders generally center your house in the lot? What determines the placement of the home?
@TyWilde3 жыл бұрын
Thanks for watching & for your excellent question. A lot of builders center the home on the lot while many others will slide the closer to the lot line on the non-garage side which will allow you to install an RV pad or even add a 3 car garage in the future. If you ask, most builders will place the home where you like. Where are you building a home?
@SornSam3 жыл бұрын
We are building in NC but I have been watching a lot of your videos and found them extremely helpful!
@TyWilde3 жыл бұрын
Thank you for taking a moment to write. I appreciate the compliment & I'm grateful for your views. Best of luck to you & please let me know if you have any questions.
@guifre19893 жыл бұрын
I have a question, which is more difficult, being a real estate agent and selling a house, or building the house?
@TyWilde3 жыл бұрын
That's an excellent question. Both are hard for different reasons. I'm actually putting out a video hopefully tomorrow about what it's like to be a new home salesperson So that should explain that for you. In this video I explain that there are multiple crews that do different things to build the house, but we use a construction manager to make sure things are being done on time.
@guifre19893 жыл бұрын
@@TyWilde video I want to see :)
@michaelhowell88983 жыл бұрын
As a new realtor that recently signed a contract for my clients in new construction. What is the steps or timeline of things I need to be doing that you recommend leading up to closing?
@TyWilde3 жыл бұрын
Stay in contact with the builders agent. For the most part, he'll want you to stay out of the way. You will want to attend the 4-way & the final walkthrough. I've made videos for both of those that you'll want to watch. Thanks for watching & best of luck to you my friend.
@steveludwig42004 ай бұрын
The time from framing to completion here is way too short for good quality workmanship. Should be at least double the timeline or even more like triple.
@TyWilde4 ай бұрын
Thanks for sharing your thoughts. In Utah this is common timing. The quality seems great to me.
@jensenjake95752 жыл бұрын
👍🏿👍🏾👍🏽👍🏼👍🏻👍👍🏿👍🏾👍🏽👍🏼👍🏻
@TyWilde2 жыл бұрын
Thanks dude!!
@TyWilde3 жыл бұрын
For more great videos like this hit the subscribe button. kzbin.info/door/0X9q1Yr_JARSO8hYHf9RRg