How Many Float Paths Do I Specify in Primavera P6, When Using Multiple Paths?

  Рет қаралды 11,037

Plan Academy Inc.

Plan Academy Inc.

Күн бұрын

Michael Answers a question from a P6 user wondering how many paths they need to specify when using multiple float paths.
Advanced Scheduling Building Course:
www.planacadem...
Primavera P6 Professional Online Training:
www.planacadem...
Our full Course List:
www.planacadem...
~
TAGS:
primavera p6, p6 tutorial, float paths, multiple float paths, p6 total float, p6 float paths, plan academy, online trianing, project controls training, project controls, michael lepage, p6, michael answers questions, p6 help

Пікірлер: 9
@Shashanknayyar1
@Shashanknayyar1 2 жыл бұрын
It flew above my head 🤯
@mahansor8295
@mahansor8295 4 жыл бұрын
Many thanks 😘☺️
@heliojcosta
@heliojcosta 4 жыл бұрын
Great video, but which float paths (or part of the various float paths) are par of the driving or critical path for a specific activity somewhere in the "middle" of the programme?
@PlanAcademy
@PlanAcademy 4 жыл бұрын
Please clarify...not sure I get what you're asking. Float Path 1 is typical the driving critical activities from the start of the schedule to specified activity or milestone.
@heliojcosta
@heliojcosta 4 жыл бұрын
@@PlanAcademy Hi and thanks for your reply. Happened more than once that the driving/critical path included activities belonging to more than one float path and not only those in Float Path 1. Realized that tracking back (trough driving/critical activities) from the activity to the 1st. Some of them were in other float paths (not only in Float Path 1). So, how do I spot all the critical activities belonging to other float paths?
@warrensaplot
@warrensaplot 2 жыл бұрын
Why there are times when a completed activity showed up in a float path?
@PlanAcademy
@PlanAcademy 2 жыл бұрын
I wouldn't expect this so this is strange behaviour, and maybe a bug? If an activity is completed, then "Total Float" is empty as well as "Free Float". Those fields should be empty, meaning they should not show on a float path. I would check if Total Float and Free Float are empty for your activity. Maybe there is a resource with some "remaining units" ? Is the activity marked "completed"? and Activity Status = "Completed"? Things to check.
@tcattie189
@tcattie189 Жыл бұрын
If it says no float path is that simply because it is, for example, on float path 11 where you’ve only asked P6 to calculate flu paths one through 10?
@PlanAcademy
@PlanAcademy 11 ай бұрын
Most likely, yes.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06
Plan Academy Inc.
Рет қаралды 19 М.
5 Primavera P6 Tips and Tricks [Live Training Highlights]
11:29
Plan Academy Inc.
Рет қаралды 2,5 М.
Sigma girl VS Sigma Error girl 2  #shorts #sigma
0:27
Jin and Hattie
Рет қаралды 124 МЛН
Who is More Stupid? #tiktok #sigmagirl #funny
0:27
CRAZY GREAPA
Рет қаралды 10 МЛН
I Sent a Subscriber to Disneyland
0:27
MrBeast
Рет қаралды 104 МЛН
Critical Path Analysis in P6 - 5 Things I Wish I Knew Earlier
9:55
Plan Academy Inc.
Рет қаралды 206 М.
Find Loops in Your P6 Schedule and How to Fix Them
7:59
Plan Academy Inc.
Рет қаралды 23 М.
Resource Loading in Primavera P6 - 5 Tips to make it EASIER
8:11
Plan Academy Inc.
Рет қаралды 37 М.
Traditional Tea & Coffee Maker in English
1:43
Everyday Beverages
Рет қаралды 27
Out of Sequence in Primavera P6
8:07
Plan Academy Inc.
Рет қаралды 10 М.
Update P6 Schedules Easier with Excel [How To]
13:01
Plan Academy Inc.
Рет қаралды 4,8 М.