Why go through all the trouble of cutting the concrete if your just going to drill through the new? Could you not just drill through the previous concrete?
@Remodelaholic Жыл бұрын
It needed footings because of the size of the pergola. If it was smaller than 200 sqft you might be able to get away will no footings.