@@SoftEdemy do you have oil & gas construction project P6 file?? If it is pls share me to paramesh869@gmail.com
@SoftEdemy3 жыл бұрын
WhatsApp:wa.me/+923155537580 Website : www.softedemy.com For any query contact us on our email : info@softedemy.com
@jacknavarrovargas27632 жыл бұрын
Thanks a lot, it's so good lesson
@SoftEdemy2 жыл бұрын
Glad you liked it!
@Hussam073 жыл бұрын
Thanks, great content by the way what is IPCs??
@SoftEdemy3 жыл бұрын
Interim payment certificates.
@faithjarrett17104 жыл бұрын
Thank you a lot,I love this
@SoftEdemy4 жыл бұрын
You're welcome 😊
@uwezahradnik38964 жыл бұрын
SoftEdemy would you be able to post me the Villa Construction Project? Uzahradnik59@gmail.com
@kaanberkaycoplugil46053 жыл бұрын
Are there any shortcut to copy and the paste existing activity codes ? I ve got 300 activity project all activity codes are same but i have to assign them one by one any shortcut ?
@SoftEdemy3 жыл бұрын
Select one then open assign code then press control and select the activities to assign similar code. then select the code and assign. if you need a video on it share your file on Softedemy@gmail.com thanks, an apology for the late reply.
@aunghtetzawlatt88764 жыл бұрын
thank you so much
@SoftEdemy3 жыл бұрын
Welcome
@randross4655 Жыл бұрын
nice video, you helped me finally figure out this assignment. Before this video, I was beginning to think maybe I was just retarded.
@SoftEdemy Жыл бұрын
Thanks for your valuable comment.
@Mahrash3 жыл бұрын
How Activity codes are different from WBS
@SoftEdemy3 жыл бұрын
My preference is to build a schedule utilizing a WBS, in a traditional manner, to lay out the projects deliverables and workflow. I would then use Activity Codes to supplement the ability to group, filter, and sort project data, therefore, enhancing performance analysis and reporting. I have also utilized project structures where the WBS was built out to a level 3 or 4 and then activity Codes were used for the remaining project levels. Project integration to Master Projects, owner requirements, and project management principles are other factors to consider when deciding how to structure projects.
@SoftEdemy3 жыл бұрын
The following are WBS attributes that cannot be performed and/or utilized by Activity Codes. WBS Summary Activities: A great way to highlight a Level 2 Schedule with a neat waterfall flow and to manage resources and costs at a rolled up level WBS elements can have Notebooks assigned WBS elements can have Work Products and Documents assigned Security can be assigned at the WBS level Thresholds, Risks, and Issues can be monitored and tracked at the WBS level Budgets, Spending Plans, and Budgets Logs can be managed and tracked at the WBS level Copying activities is a much easier task when grouped by WBS Earned Value attributes including WBS EV Milestones can be set at the WBS level The Tracking View is designed to use WBS elements Long range Resource Planning can be performed at the WBS level Projects can be summarized to specific WBS levels
@Mahrash3 жыл бұрын
@@SoftEdemy Thanks for your reply your time efforts, I really appreciate and god bless you for your work.