How to assign Project Weightages in Primavera p6

  Рет қаралды 18,133

Learn with EngrWaqas

Learn with EngrWaqas

Күн бұрын

Пікірлер: 21
@shahruledree
@shahruledree 2 жыл бұрын
Thanks, really appreciated
@AtifKhan-we7rt
@AtifKhan-we7rt 2 жыл бұрын
Good Presentation, But I believe it doesn't work for Weightage having value 0.001% as Primavera considers 0.00 value only. You have to enter it Manually is the best practice and more control.....Appreciate your work!
@faisalgulzar4538
@faisalgulzar4538 10 ай бұрын
Sir, even if you export data with "Rs" or "d" symbol, it can easily be separated into 2 columns using the data tab in excel.
@sarbelandkhan7830
@sarbelandkhan7830 Ай бұрын
If all the amounts are entered into the P6 along with WBS, then why it cannot calculate the weightages by itself? Its just dividing individual costs by the cumulative project cost.
@reginaldibenne6875
@reginaldibenne6875 6 ай бұрын
Nice presentation.🙏 I noticed after importing back the schedule, the weightage % go back to 0.2, 0.3, 0.89 just to say. ie the percentage did not multiples in those values. What's the cause, sir?
@nithinkokkula5866
@nithinkokkula5866 2 жыл бұрын
Sir thnks for awesome video . Sir pls solve my query , after weightage is assign and when we enter actuals how to get project actual progress values against schedules ones
@engrwaqas
@engrwaqas 2 жыл бұрын
Thanks
@minhazali4090
@minhazali4090 Жыл бұрын
Schedule values are derived from baseline. Actual is derived from updated schedule as physical progress or earned value
@madanmoharana77
@madanmoharana77 Жыл бұрын
wrong way of presenting ...it will not work in real time project. cost based weightage is not working most of the time & in update time your method also not work.
@engrwaqas
@engrwaqas Жыл бұрын
Oh dear Oh Dear
@carlodigma819
@carlodigma819 6 ай бұрын
Hi, I have one Query I tried it but, when exporting P6 to excel the out come the activities are not in order. I tried to use the define and inter all percentages in all activities automatic wbs was filled with total wt. %, but when i Share the xer file to the client the outcome with them not the same value of Wt. % please guide Thanks
@engrwaqas
@engrwaqas 6 ай бұрын
Whatsapp +92 3114396983
@carlodigma819
@carlodigma819 6 ай бұрын
Not coming when i export to p6 value are difference
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
how we can calculate weightage % if cost is not loaded?
@minhazali4090
@minhazali4090 Жыл бұрын
Man-hours
@engrwaqas
@engrwaqas Жыл бұрын
Duration based Man hour based
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
@@engrwaqas can you explain sir further
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
@@engrwaqas plz sir elaborate duration based....
@benzonjhermogeno
@benzonjhermogeno 4 ай бұрын
Use budgeted labor units ​@@muhammadusmananwar8992
@carlodigma819
@carlodigma819 6 ай бұрын
The wbs not tally the percentage.
@engrwaqas
@engrwaqas 6 ай бұрын
How ?
Manpower Resource Loading including S-curve in Primavera P6
13:30
Бутылка Air Up обмани мозг вкусом
01:00
Костя Павлов
Рет қаралды 2,4 МЛН
Kind Waiter's Gesture to Homeless Boy #shorts
00:32
I migliori trucchetti di Fabiosa
Рет қаралды 9 МЛН
If Barbie came to life! 💝
00:37
Meow-some! Reacts
Рет қаралды 62 МЛН
а ты любишь париться?
00:41
KATYA KLON LIFE
Рет қаралды 2,6 МЛН
Managing Baselines in Primavera P6
10:21
Ten Six
Рет қаралды 115 М.
Primavera P6: Reporting and Preparing KPI Charts
19:13
Zero Float
Рет қаралды 49 М.
Monitor the project without cost or Resource loading
15:34
Planning Engineer FZE.
Рет қаралды 10 М.
Primavera P6 Layout for EASY Earned Value Analysis
8:52
Plan Academy Inc.
Рет қаралды 11 М.
Бутылка Air Up обмани мозг вкусом
01:00
Костя Павлов
Рет қаралды 2,4 МЛН