How to assign Project Weightages in Primavera p6

  Рет қаралды 20,590

Learn with EngrWaqas

Learn with EngrWaqas

Күн бұрын

Пікірлер: 24
@shahruledree
@shahruledree 2 жыл бұрын
Thanks, really appreciated
@AtifKhan-we7rt
@AtifKhan-we7rt 2 жыл бұрын
Good Presentation, But I believe it doesn't work for Weightage having value 0.001% as Primavera considers 0.00 value only. You have to enter it Manually is the best practice and more control.....Appreciate your work!
@faisalgulzar4538
@faisalgulzar4538 Жыл бұрын
Sir, even if you export data with "Rs" or "d" symbol, it can easily be separated into 2 columns using the data tab in excel.
@billytubes
@billytubes Ай бұрын
Hi Waqas, I dont have a cost loaded programme, can we use weightage and a fake cost resource to prsent s cruve and generate spi/cpi. ?
@reginaldibenne6875
@reginaldibenne6875 9 ай бұрын
Nice presentation.🙏 I noticed after importing back the schedule, the weightage % go back to 0.2, 0.3, 0.89 just to say. ie the percentage did not multiples in those values. What's the cause, sir?
@saudpm40
@saudpm40 2 ай бұрын
Whats the benefit of using weighted sheet ? Is it linked with EVM?
@engrwaqas
@engrwaqas 2 ай бұрын
Yes , If your project progress measurement is based on such WTgs then yes it will create EVMs trends
@sarbelandkhan7830
@sarbelandkhan7830 5 ай бұрын
If all the amounts are entered into the P6 along with WBS, then why it cannot calculate the weightages by itself? Its just dividing individual costs by the cumulative project cost.
@nithinkokkula5866
@nithinkokkula5866 2 жыл бұрын
Sir thnks for awesome video . Sir pls solve my query , after weightage is assign and when we enter actuals how to get project actual progress values against schedules ones
@engrwaqas
@engrwaqas 2 жыл бұрын
Thanks
@minhazali4090
@minhazali4090 Жыл бұрын
Schedule values are derived from baseline. Actual is derived from updated schedule as physical progress or earned value
@carlodigma819
@carlodigma819 9 ай бұрын
Hi, I have one Query I tried it but, when exporting P6 to excel the out come the activities are not in order. I tried to use the define and inter all percentages in all activities automatic wbs was filled with total wt. %, but when i Share the xer file to the client the outcome with them not the same value of Wt. % please guide Thanks
@engrwaqas
@engrwaqas 9 ай бұрын
Whatsapp +92 3114396983
@madanmoharana77
@madanmoharana77 2 жыл бұрын
wrong way of presenting ...it will not work in real time project. cost based weightage is not working most of the time & in update time your method also not work.
@engrwaqas
@engrwaqas 2 жыл бұрын
Oh dear Oh Dear
@carlodigma819
@carlodigma819 9 ай бұрын
Not coming when i export to p6 value are difference
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
how we can calculate weightage % if cost is not loaded?
@minhazali4090
@minhazali4090 Жыл бұрын
Man-hours
@engrwaqas
@engrwaqas Жыл бұрын
Duration based Man hour based
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
@@engrwaqas can you explain sir further
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
@@engrwaqas plz sir elaborate duration based....
@benzonjhermogeno
@benzonjhermogeno 7 ай бұрын
Use budgeted labor units ​@@muhammadusmananwar8992
@carlodigma819
@carlodigma819 9 ай бұрын
The wbs not tally the percentage.
@engrwaqas
@engrwaqas 9 ай бұрын
How ?
Can You Find Hulk's True Love? Real vs Fake Girlfriend Challenge | Roblox 3D
00:24
ТЮРЕМЩИК В БОКСЕ! #shorts
00:58
HARD_MMA
Рет қаралды 2,4 МЛН
МЕНЯ УКУСИЛ ПАУК #shorts
00:23
Паша Осадчий
Рет қаралды 4,6 МЛН
import progress updates with actual dates to primavera p6
10:32
Planning Engineer FZE.
Рет қаралды 27 М.
Manpower Resource Loading including S-curve in Primavera P6
13:30
Primavera P6: Reporting and Preparing KPI Charts
19:13
Zero Float
Рет қаралды 51 М.
Monitor the project without cost or Resource loading
15:34
Planning Engineer FZE.
Рет қаралды 10 М.
Can You Find Hulk's True Love? Real vs Fake Girlfriend Challenge | Roblox 3D
00:24