How to Make the BEST Gantt Chart in Excel (looks like Microsoft Project!)

  Рет қаралды 1,458,094

David McLachlan

David McLachlan

Күн бұрын

Пікірлер: 1 000
@michellealexi9901
@michellealexi9901 11 ай бұрын
For those of you who just want to copy and paste that first formula for the date thing: =IF(MONTH(D3-WEEKDAY((D3),2)+1) < MONTH(D3), (D3-28-DAY(D3)+7) - WEEKDAY((D3-DAY(D3)+7),2)+1, (D3-DAY(D3)+7) - WEEKDAY((D3-DAY(D3)+7),2)+1)
@jasminfarr1242
@jasminfarr1242 10 ай бұрын
Thank you 😢
@Deyvid_Autumn
@Deyvid_Autumn 13 күн бұрын
you're a hero Michelle
@ahmedr.5002
@ahmedr.5002 6 күн бұрын
What kind of kindness do have man, thanks a million!
@kelvindoble
@kelvindoble 2 күн бұрын
I have typed it in a dozen times and couldn't get it to work so was delighted to see this thank you. However have you noticed that it doesn't seem able to cope with a project date before the 28th January - it can't go back to proceeding year Even the early chart shows a project start date of the 1st but the first week commencing is the 3rd. I have spent too many hours trying to make it work 😂
@DubseditionTCG
@DubseditionTCG 5 ай бұрын
I can honestly say, my team was impressed when I whipped this out to present the other day
@trustedconsultingllc9902
@trustedconsultingllc9902 2 жыл бұрын
David, you're a natural born teacher. Very much appreciate your positive and encouraging tutorial on how to do these things for yourself.
@derekmurray59
@derekmurray59 Ай бұрын
Took me a bit longer than 15 minutes to get the hang of it. Wish I had read these comments beforehand and noticed somebody was kind enough to drop all the Excel formulae. Well worth the effort though. This is a great tool.
@hettardsplat
@hettardsplat 9 ай бұрын
Fantastic step by step! Some of the bits went a little quickly so a LOT! of pausing and repalying but I now have an amazing Gantt chart to use across multiple projects! well worth the time invested. One suggestion would be to post the different formulas in the description to make it easier and save a LOT of typing and re-typing when things go wrong.
@mh5832
@mh5832 25 күн бұрын
Have never put together a Gantt Chart or done any formal training and this video has saved me! Thank you David!
@hamodeosso6507
@hamodeosso6507 Жыл бұрын
Hands down the most straight forward and visually appearing GANTT chart
@beckysings1669
@beckysings1669 17 күн бұрын
Thank you so much! As someone who struggles with even the basics of Excel, I'm amazed that I was able to create such a professional and functional Gantt chart following your instruction! All of the formulas worked for me bar the formula for creating the days for the calendar and the one for creating the golden colour when a task is complete; if anyone had any ideas about why they didn't work and how to fix them, I'd really appreciate that :)
@Lilly_Olivia_R
@Lilly_Olivia_R 2 жыл бұрын
Hi! I passed my PMP exam with above target in all three categories. Thanks for your videos!
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
That is amazing Linda, congratulations! You have conquered a very difficult task 🙂
@s2_p_2524
@s2_p_2524 2 жыл бұрын
@@davidmclachlanproject Hi David . Thanks for the video , was really helpful . How can I get this template please ? I tried creating it , but getting stuck at the end . Thanks 🙂
@andyMFsample
@andyMFsample 3 ай бұрын
Aside from the cut at 10:35ish, it was incredibly easy to follow. At that junction, there's really no explanation on what to actually do here, but fortunately I found the answer in the comments. Select K6 (assuming you followed the guide exactly) and then do ctrl+shift+end, and it will automatically select the entire chart, then you can go into the conditional formatting, select the create new rule option, paste the equation there, and then you can format the cell and continue on. Thank you David for such a helpful and insightful video!!
@Deitzable
@Deitzable 2 жыл бұрын
For the Milestones, none of my conditional formatting is working when plugging in the formulas, and the wingdings aren't showing up. Need help!
@simondavis2116
@simondavis2116 5 ай бұрын
I'm currently undergoing a Site Management course. I've been banging my head against the wall trying all sorts of formulas to get this right. This is by-far one of the best examples of a self-build Gantt Chart, and has become indispensable to me! Many Thanks, David! P.S. I've managed to manipulate a formula to introduce and over run on any particular task! Again Thanks David!
@carolinewarren3587
@carolinewarren3587 7 ай бұрын
Thank you, David, for an (almost) idiot-proof tutorial on creating a customized Gantt chart. It took me about 4 hours, but I'm thrilled with the result, and the fact that I can use this template for other projects in the future. Many, many thanks for your help!
@12parkourdude12
@12parkourdude12 25 күн бұрын
May I ask how you went about adding the 'golden colour to show complete' formula please? It won't work for me.
@beckysings1669
@beckysings1669 17 күн бұрын
@@12parkourdude12 I was about to comment this exact thing! I also can't get that formula to work, so if anyone has any advice, that would be really appreciated!
@12parkourdude12
@12parkourdude12 17 күн бұрын
@@beckysings1669 Hi Becky, so it worked for me in the end. I basically thought I was being clever by putting the status table on another sheet (thought it would look neater) and I also had another sheet with something else on (so 3 sheets open, 1 including the gantt chart). Even though I selected 'this worksheet' on the conditional formatting, it wouldn't work. So, I decided to copy and paste the whole gantt chart (only) onto a brand new excel sheet, I quickly re-did the status table using the previous guide and kept it on the same sheet as the gantt chart this time. I then tried the 'golden colour for complete' formula and it worked. Not that technical of a fix, but it worked. I can't do the final 'percentage blocked' formula though. That still won't work. Good luck and keep singing!
@kaleemullahbilal
@kaleemullahbilal 2 ай бұрын
Hi David, The level of Dedication and hard work you are putting in to make such a mind-blowing content, you deserve millions of Subscribers.
@gelsondiaz198812
@gelsondiaz198812 Жыл бұрын
Excellent work. This tutorial was very easy to follow and easy to implement. As a recommendation you could add the formulas on the description for faster Gantt chart creation and that way we can focus more on the explanation.
@dougmowbray2606
@dougmowbray2606 10 ай бұрын
my thought exactly
@corneking5878
@corneking5878 8 ай бұрын
I can't get any of the formulas to work, giving up. Wasted soooo much time trying. Will just buy a project software.
@martin3958
@martin3958 6 ай бұрын
Your positivity has made excel bearable for me. Thank you
@johnsebastianrozofuentes5796
@johnsebastianrozofuentes5796 2 жыл бұрын
I am a beginner and it took me about an hour. To be honest, I never thought I would make it, anyway I tried, and I actually made it. It wasn't that difficult because of the way you explained it all. Man, can´t thank you enough! blessings
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
An hour, that's impressive! It took me about a week after work to figure out all the bits and pieces, so: time saved 🙂
@yourfatherofyourmother2035
@yourfatherofyourmother2035 Жыл бұрын
@@davidmclachlanproject can you please give us the functions for day per day ?
@faseehaneil3809
@faseehaneil3809 Жыл бұрын
​@@davidmclachlanprojecthey David I'm making this right now, an absolute beginner here. I just don't get how to like get that calender thingy. I mean the rows and columns size and height after I how to do that?
@Safari_Secrets.
@Safari_Secrets. Жыл бұрын
@@yourfatherofyourmother2035 Did you ever find out
@quentonwillis3846
@quentonwillis3846 2 ай бұрын
Just created a Gantt following this video. Turned out great. Can't wait to use this for my team's project!
@flowzone.
@flowzone. 5 ай бұрын
awesome job - one additional need would be a "dependencies" function where certain tasks can be linked and thus influence each others timeline back and forth. Other then that fantastic tutorial and product
@kasperraunholst
@kasperraunholst 6 ай бұрын
Such contageous enthusiasm. I love how a square becomes "a beautiful diamond". Thanks a lot for making this one.
@jaredbarber7257
@jaredbarber7257 10 ай бұрын
This video is fantastic and the presenter does an amazing job. David's enthusiasm is infectious and I honestly had fun making a Gantt chart for my project - never thought I'd say that!
@eljacoby
@eljacoby 2 жыл бұрын
You have literally SAVED MY LIFE today with this!!!! Thank you!!!!!!!
@shreyapandey376
@shreyapandey376 2 жыл бұрын
Simply amazing! I had no idea excel sheets could look so aesthetic. You've completely changed my life, this Gantt chart is a game-changer!
@vincentgoransson9729
@vincentgoransson9729 Жыл бұрын
@@dwightPhoenix How and where?
@smgsmusic
@smgsmusic 2 ай бұрын
Thanks for the great video. One little hint for the other viewers: You have to take a close look at where he put the dollar signs ($). If you leave them out the cell dragging won't work how you want it to. I had to learn the hard way
@laielatolentino7019
@laielatolentino7019 Ай бұрын
I went brain dead during conditional formatting, I keep replaying, but the I don't get where the $ are on the cells, 4 hrs here now, I'm almost done...my God
@barryluo2011
@barryluo2011 11 ай бұрын
Hello David, thank you for the tutorial, any chance we can switch this into a tracking sheet by days instead of weeks? What are the things we need to modify based on this tracking sheet? Thanks in advance!
@IOSALive
@IOSALive 24 күн бұрын
David McLachlan, amazing video you deserve more subscribers
@meaningofmovementpodcast5996
@meaningofmovementpodcast5996 11 ай бұрын
This is a straight-up amazing walkthrough on how to create a well functioning Gantt Chart. Thanks so much for sharing, it will be put to great use!
@jodyswartz2827
@jodyswartz2827 7 ай бұрын
Thank you so much for this!! I've created a Gantt chart that my boss will be happy with for a company-wide project! ⭐⭐⭐⭐⭐
@mikekennedy5843
@mikekennedy5843 7 ай бұрын
Thanks David, this is one of the best tutorials available for Gantt Chart creation and Conditional Formatting
@CarrieannHardaker
@CarrieannHardaker 3 ай бұрын
Thank you so much, this was so easy to follow and re-create alongside you. My project team were impressed.
@Simon-jg4qf
@Simon-jg4qf Жыл бұрын
Thank you David, this is incredibly useful as I am a civil engineering student at a university that does not provide access to MS Project regardless of the crazy fees that I'm paying 🤣
@louisdasselaar7806
@louisdasselaar7806 Күн бұрын
this is by far the best one
@TKtotheMax
@TKtotheMax Жыл бұрын
Hello, thank you for showing us how to do it. would it be possible to copy the formulas into the description so we can copy and past them in and change the cell references. I have tried to type up the formula into the cells and I keep getting error messages. It says it is too long to even try the first one. Thank you
@lajosn
@lajosn Ай бұрын
You are a Master at this. ... and it was also a good presentation. God bless you!
@richardwalton3613
@richardwalton3613 Жыл бұрын
Well done. Though it is missing a key component of a gantt chart: Dependencies. The whole purpose of a (complete) gantt chart is to show what tasks depend on what other tasks and what the impact of changing one or more tasks has on the schedule. If your intention was artistic in nature, this is very good. But don't sell this as a gantt chart. Thanks for showing how to build our own sheets. Much more impactful than simply uploading someone else's sheets.
@southcoastsynthesis
@southcoastsynthesis Жыл бұрын
I agree. The point of using a tool like MS Project is for predecessors and successors and the whole scheduling engine. Also, summary tasks and other features for navigating a large project schedule. Not to mention resourcing features. Excel might be OK for a very simple task list but I can't imagine running an actual project without something like MS Project!
@robertduda4234
@robertduda4234 Жыл бұрын
See my question about the FOUR types of dependencies.
@danielbarnatt9332
@danielbarnatt9332 10 ай бұрын
I think how important this is depends on the size of the project, Many mini projects can and are managed on excel sheets manually and this automates some of the basic functions of laying out a chart. I find managing an ms project plan cumbersome in pretty much all but the most rigidly defined projects. Equally i often find faults in the ms-project scheduling engine that can put your entire plan out of kilter, meaning you up end spending more time getting your plan to behave correctly than you do actually delivering anything. In the kind of environments i manage manage projects in i need something that is quickly editable on the fly at a whim, without being to concerned with what impact changing one line may have on the rest of the plan. I can make notes against the cells in excel and cater for the dependencies later when i have time. Also in complex changing environments dependencies are always changing , and often things that you thought were dependencies turn out not to be and vica versa. In my experience having a plan that is a little looser in is restrictiveness can actually be helpful for a busy project manager.
@jamessbca
@jamessbca 8 ай бұрын
@@danielbarnatt9332this has been my experience as well. Any MS project schedule I create is like a beautiful work of art on Day 1. But I’ve never successfully tracked progress in it. I’ve been developing a “task list” in excel that simply has tasks, estimated hours per task, and a “percent complete” cell, which drives 10 conditionally formatted cells that represent a “gas gauge” - how close to done the task is, From 1-10 Real life is always way more complicated than an MS project schedule. The fact that project doesn’t let me take notes anywhere on the screen just kills me. I’m reinvigorated with the idea of doing this in excel (and keeping it very simple) due to recently working with a very competent project manager who uses a white board and post-it notes. He doesn’t use a computer at all, let alone MS project. (And I just save the excel file with a new date in the filename each time, so I could always go back in time super easily if I ever wanted to…)
@laielatolentino7019
@laielatolentino7019 Ай бұрын
Finally got the hang of it, many many thanks, super worth having spent my 5 hours with you...All the very best and hope for more videos to come :)
@paulkelly6446
@paulkelly6446 2 жыл бұрын
Nice work. I added the following formula and named range to the ID# so that deleting a task renumbers and keeps the tasks id in order =IF(ROW(id)=ROW($B$5)+2,1,MAX(prev_col_range)+1) named rage id = $B5 and named range prev_col_range = $B$5:B4
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
Nice one! 👍
@nyxjrstone7470
@nyxjrstone7470 Жыл бұрын
How to change if i want month
@flowzone.
@flowzone. 4 ай бұрын
Hey Paul what cells do you apply this to?
@ejvideos07
@ejvideos07 Жыл бұрын
Oh my Lord !! This changes everything I do at work. I thought the answer was to use Charts, but this is so much better. Thank you.
@MRMOTOFOTO
@MRMOTOFOTO 2 жыл бұрын
Took me 4 hours...lol, but that was great. Thanks!!!
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
It took me 2 weeks, so you did well 😂
@sohanv8403
@sohanv8403 Жыл бұрын
Thank you for the detailed explanation. Really helped me out when my boss asked me to prepare a project tracker...
@chloehugaga2203
@chloehugaga2203 2 жыл бұрын
Thanks for such wonderful video, but I failed to do the today’s bar. Tried few times with the possibilities on my understanding. Can u teach again on where should I type the formula? Thanks
@ibd991
@ibd991 Жыл бұрын
Same place i got stuck because if I put the formular it gives me error. Did you find a way around it?
@chloehugaga2203
@chloehugaga2203 Жыл бұрын
@@ibd991 yes. I found the solution. how about you?
@suzanneocchipinti6318
@suzanneocchipinti6318 Жыл бұрын
@@chloehugaga2203can you please share it?
@christos7440
@christos7440 2 жыл бұрын
Nicely done - I can actually hear your smile in your voice
@natassakazepidou6639
@natassakazepidou6639 2 жыл бұрын
great video; may I ask if you provide the formula where you use to format the dates across the year?
@robertduda4234
@robertduda4234 Жыл бұрын
I think you are asking about 2 consecutive calendar years: How do you sort by start dates if your project spands TWO years?
@khchan8341
@khchan8341 2 ай бұрын
Just created this on excel. Fantastic looking chart and offers quite good flexibility. Let's see how far I can use this for my projects. Thanks very much.
@holidays5476
@holidays5476 2 жыл бұрын
This is slick - thanks so much! Love your energy into the video. Going to use this for my next project.....people may think I know what I'm doing! :)
@benjaminmangu4833
@benjaminmangu4833 Жыл бұрын
😄😄😄💪
@kdickee
@kdickee 2 ай бұрын
Your way of explaining is calm, interesting and excited. Thanks I created my first ever Gantt chart today for new job. FYI- learnt Gantt chart meaning today... thanks again!
@robertduda4234
@robertduda4234 Жыл бұрын
May I suggest that we organize (organise) a project to incorporate some / all of the desired features: • Critical Path Analysis • Dependencies of Activities • Resources Loading • "What if" scenario calculations • Resource leveling / smoothing • Unexpected loss / delay of a resource • •
@chaitiroy7678
@chaitiroy7678 2 жыл бұрын
Great experience to create successfully the template with zero knowledge - Thank You David
@chaitiroy7678
@chaitiroy7678 2 жыл бұрын
David, can dependencies be done as well that becomes visible as dashboard in XL?
@brookepittman8505
@brookepittman8505 2 жыл бұрын
This is a great video but for us beginners it goes a little fast. I wish it was a little more broken down in the formatting portions and adding the tasks and stuff. Overall still a great video.
@bexwhiting81
@bexwhiting81 2 жыл бұрын
Agree. Great video but for a beginner, formatting the cells went way too quickly.
@robertduda4234
@robertduda4234 Жыл бұрын
You tube allows for playback down to 25% to 75% of normal.
@AbeerPervaiz
@AbeerPervaiz 2 жыл бұрын
OMG! i Canno believe this but I made the GANTT CHART and its amazing! Thank you for this tutorial.
@billgordy169
@billgordy169 Жыл бұрын
David, you're making me look like a genius. This has been so informative and useful. Thanks so much for sharing.
@Rhitalbaldwin
@Rhitalbaldwin Жыл бұрын
SUPER HELPFUL!! One thing, as a new learner, I did not realize that the formulas you are plugging into the formatting don't exist in any cells yet.
@DeannaYildiz
@DeannaYildiz Жыл бұрын
Great job. I completed the Gantt chart and am very excited to implement it. You are excellent, sir!
@mardyra
@mardyra 3 ай бұрын
Is it too much to ask if you could kindly send your template? As you can imagine someone needing an advanced chart like this is in crunch time mode 😢. Thank you so much in advance 🙏🏻
@kevenc
@kevenc Жыл бұрын
Clearly you are an Excel time genius! Thanks!
@chantellelavie
@chantellelavie Жыл бұрын
Excellent tutorial! Exactly what I was looking for. Thank you for taking the time to create and share it.
@nicholastugume1081
@nicholastugume1081 11 ай бұрын
I am stranded at the addition of ghantt bars. what could be doing wrong
@agluglu8456
@agluglu8456 10 ай бұрын
@@nicholastugume1081 i managed to do that, but i am stucked at the diamond milestone
@kunalpatil1776
@kunalpatil1776 9 ай бұрын
@@nicholastugume1081 same, my ghantt bar isnt visible even after applying the right formula. Some formatting in the later part is not working too. Can someone help - what may be going wrong ?
@MarinaCortez-c3w
@MarinaCortez-c3w 11 ай бұрын
Thank you very much for the tutorial! My head is already aching from working on this Gantt chart. My boss has been requesting it for weeks.
@brittneyjasmin
@brittneyjasmin 2 жыл бұрын
Stuck on the step around 9:40 - making it show a u when that date falls within the week selected above. the formula isn't showing any errors and appears to be pulling from the right places but I am not getting the u on the week it should appear (the end date is 4/30/2022 and it should appear in the work week of 25-Apr). I even tried changing the end date to match the week day exactly and it doesn't seem to want to work. Anyone have any tips / advice?
@Gibraltariano
@Gibraltariano Жыл бұрын
Hey, did you get an answer or resolve yourself? I also can’t get the symbol to appear.
@feeldulfo9387
@feeldulfo9387 Жыл бұрын
manually add the formula, also do the fancy thing formula he said right at the beginning when he just start adding the day and month e.g., 22-Sep
@settyc
@settyc Жыл бұрын
Work Around: I inserted a Column for Week Number for the End Date and used this formula =IF($G5-WEEKNUM(L$4)=0,"u"," ")
@jernejge
@jernejge 5 күн бұрын
​@@settychey, how do you define the week number in the column?
@nicparham9115
@nicparham9115 Жыл бұрын
Very clear instructions - thank you. But the main purpose of a Gantt chart is to clearly show the dependencies in a project and to show when deadlines may not be met as priors are not on schedule. If you are able, a tutorial showing how to create dependencies would be v helpful
@docco6767
@docco6767 Жыл бұрын
This is considerably better than the ones in my work. Thank you and your formulas actually work, unlike 90% of the ones on KZbin.
@PatchedBandit
@PatchedBandit 8 ай бұрын
Mine are not working though. "problem with formula"
@prodriver_es5647
@prodriver_es5647 6 ай бұрын
@@PatchedBanditI need to change “,” to “;” and worked for me. Hope you solve that problem.
@amjadkataw1172
@amjadkataw1172 6 ай бұрын
Thank you so much for a great explanation for a simple but yet very useful method.
@dalilas5085
@dalilas5085 8 ай бұрын
You are my life saver THANK YOU SO MUCH for the amazing content!!!!!
@dalilas5085
@dalilas5085 7 ай бұрын
p/s my team are IMPRESSED with this ganttchart for real !!!!!
@nmorton100
@nmorton100 4 ай бұрын
This is great thank you so much. Also, I think it needs a project summary bar on the top 2 rows so you can see at a glance if the entire project is on track or ahead or behind schedule. Also a popup calender when inserting dates into the 'start' and énd' would be good to avoid human error inputting dates. Thanks again.
@Sali7691
@Sali7691 2 жыл бұрын
Absolutely amazing and much needed, I was looking for some advanced Gantt chart for. months, and here I got it, many thanks, considering buying your template, looking for some discount !
@diladina8312
@diladina8312 29 күн бұрын
you are amazing... your video and explanation is very clear. i manage to do it and looks quite professional. Thanks a lot 😊
@conoromelia8435
@conoromelia8435 2 жыл бұрын
Very very impressive chart. Im 100% going go make one, its 100% going take me hours to do though 🤣
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
It took me two weeks to figure it all out and put it together, but I am not the fastest person 😂
@conoromelia8435
@conoromelia8435 2 жыл бұрын
Im a project manager and that chart is going to become part of my arsenal. Thank you!
@johnvodopija
@johnvodopija Жыл бұрын
I keep returning to this video even though I have followed along and recreated the template myself as a learning exercise. I have created a daily version for a more detailed view but use the weekly version to provide an overview. Simply superb! Thank you again. 👍😃
@khuloodal-alawi6907
@khuloodal-alawi6907 Жыл бұрын
=IF(K$4=($F6-WEEKDAY($F6,2)+1),"u","") this one didn't work for me how to fix that
@summajae
@summajae Жыл бұрын
Hi there! I'm looking at a daily version as well, but for some reason the =IF(K$4=($F6-WEEKDAY($F6,2)+1),"u","") formula doesn't work in the daily version. It works for 3 rows but the rest are a few days out. Did you use a different formula to place the diamonds on the gantt? Thanks!
@webdev3730
@webdev3730 Жыл бұрын
@@summajae intriguing, i have come across the exact same issues. maybe its a version of excel thing??? mine do not work at all
@jimmietraylor7413
@jimmietraylor7413 5 ай бұрын
I am trying to set one for daily tracking as well but am having issues getting the conditional formatting formulas figured out. Any way you can provide those?
@hmnc444
@hmnc444 2 жыл бұрын
Its crazy how you manage to use excel to create such a complex and useful gantt chart. I can barely get my formatting to work hahaha. Great stuff.
@tsend-ayushtserendavga6948
@tsend-ayushtserendavga6948 2 жыл бұрын
A2¹
@whistlinclipz
@whistlinclipz 2 жыл бұрын
How can I download this
@goonershezz9714
@goonershezz9714 2 жыл бұрын
Work smarter not harder 😂😂😂
@namiland_movie
@namiland_movie Жыл бұрын
Having taken courses on LinkedIn Learning and other KZbin channels and reading books on MS Excel, I can say this lesson of yours is one of the best, I've taken on Excel so far! Thanks a lot Buddy, Keep it rolling....
@jonstevens7269
@jonstevens7269 2 жыл бұрын
This is really good! Can you show how in this example -- John is ready for another task 16 May. How do you add that without losing the previous tracked task? That way, you could forward allocate tasks and the entire year would show a record of time allocation by team member. When the director asks "what have your people been working on all year?".
@prodriver_es5647
@prodriver_es5647 6 ай бұрын
It is the same example I requested now hope David give us a tutorial or a template to buy with that issue. I really need it for planning tasks!!!
@hemanbassi12
@hemanbassi12 8 ай бұрын
Thanks, David! Despite the availability of other tools, I felt compelled to give this one a try. I've just forwarded my Gantt chart to my supervisor.
@KonfliktZW
@KonfliktZW 5 ай бұрын
Hi can I have the completed gannt chart please..I can't get the formulas to work
@dagwould
@dagwould Жыл бұрын
A couple of thoughts: drop down lists maybe on a separate 'tools' sheet: easier to use across tabs and to update. Use a table for the list. % complete only for when the output is countable. Estimates never work. If there is no countable output, the activity is 0% until it is 100%. And 100% means accepted by the PM (and the client). IMO, better to have an expected completion date, so it is concrete and drives commitment on the reporter.
@davidmclachlanproject
@davidmclachlanproject Жыл бұрын
These are great ideas, certainly do-able 🙂
@dagwould
@dagwould Жыл бұрын
@@davidmclachlanproject David, glad you found my thoughts of interest. One more thought, in my domain, a milestone is a durationless event; I identify a milestone as an activity of zero duration: so start and end dates are the same. They usually come at the end of a sequence of activities that produce a work package or discrete component.
@CharlesA24
@CharlesA24 5 ай бұрын
You are way to inthousiast about pastel colors!! haha, but thank you very much you make turorials actually fun to watch. Thanks for those tips!
@ianlynch3594
@ianlynch3594 Жыл бұрын
Hi David, great Gannt chart and very easy to follow and develop, just wondering is there an easy way to make the date dependant?
@Nadiapm2001
@Nadiapm2001 Жыл бұрын
Thank you so very much! I feel so proud of myself...courtesy of your shared wisdom and insane Excel skills!
@ipm131
@ipm131 2 жыл бұрын
Hello and thank you for this video. I am having an issue with trying to get the Gantt bars, the formula =K$4=(TODAY()-WEEKDAY(TODAY(),2)+1) comes back as FALSE. And I am also confused about whether I'm replacing the formula for the weeks in K4 with this one.
@jermainepitter2001
@jermainepitter2001 2 жыл бұрын
Great question, having the same issues.
@sandropegado7462
@sandropegado7462 2 жыл бұрын
Great question. Having the same issue.
@ddothill
@ddothill 2 жыл бұрын
The Gantt bar formulae need to be entered as Conditional Formatting rules. If you've created all the dates in row 4, and all the row data you are using in columns C to I, then you need to click on cell K6, then press Ctrl+Shift+End and it'll highlight the range of cells you are testing. Up on the Home menu, click Conditional Formatting, New Rule... then select the bottom rule type "Use a formula to determine which cells to format", enter the formula in the box below, set the Format... you want. Click OK, then Apply, then OK.
@ManjitKaur-fd1jb
@ManjitKaur-fd1jb Жыл бұрын
Great video, yes I am having the same issue - please help
@ramialsouqi7514
@ramialsouqi7514 2 жыл бұрын
Hi David, I noticed you updated your video on 28 February, you have done great job. 👍
@herminiogarcia4303
@herminiogarcia4303 2 жыл бұрын
In my opinion, it is the best timeline chart I have ever seen. I need a help on the "Percent Done". The formula of the Percent Done on the Bar does not work for me: =AND($I6>0, K$4 = $E6 - WEEKDAY($E6, 2)+1). Shows an error. Help me!
@Hogidibi
@Hogidibi 2 жыл бұрын
I'm getting the same :(
@jacobashdown8876
@jacobashdown8876 2 жыл бұрын
same
@jessicakahanek3845
@jessicakahanek3845 2 жыл бұрын
He never responded did he? I'm stuck on the same thing.
@swapnilkadam6641
@swapnilkadam6641 2 жыл бұрын
I think that's where almost everyone got stuck...is he going to respond on it or not?
@pietercharle8055
@pietercharle8055 Жыл бұрын
had the same but resolved it this way: Added a closing parenthesis for the WEEKDAY function before the +1 in the second argument. Changed the greater than or equal to sign (>=) to just the greater than sign (>) in the third argument.
@odrazleinad
@odrazleinad 3 ай бұрын
Awesome video... applied many of the ideas for my project planner template. Thanks for the really useful content David.
@sainimadhur
@sainimadhur 2 жыл бұрын
Hi @David, Great work. How can we break down the timeline from weeks to days. Your inputs will be really helpful. Thank you for the video. 🙏
Жыл бұрын
@David, answer please to this question
@aerolleameermitra1630
@aerolleameermitra1630 Жыл бұрын
Do we already have an answer for this? 🙏
@vcanadian1971
@vcanadian1971 Жыл бұрын
Instead of +7 change to +1
@jimmietraylor7413
@jimmietraylor7413 5 ай бұрын
@@vcanadian1971 The conditional formatting formulas need to be changed as well.
@madisoncarter9036
@madisoncarter9036 4 ай бұрын
David thanks so much, really amazing video! I plan on purchasing some of your templates via Etsy. Best instructional video on this topic.
@IrishBoySF
@IrishBoySF 2 жыл бұрын
I was following along fine and then once I got to the milestone integration and with the formulas I got lost. I have tried placing in the exact formula to no avail so I can't go any further with the GANNT creation. :-(
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
One thought: if you're not using the "fancy" start date formula, make sure your project date starts on a Monday. This should work with the rest of the formulas!
@IrishBoySF
@IrishBoySF 2 жыл бұрын
@@davidmclachlanproject I tried changing the start date to Monday and it still doesn’t work. It’s a shame I really like to look at this chart but I can’t go any further. I spent a few hours designing this and now I can’t use it
@phungvuong840
@phungvuong840 3 ай бұрын
@@davidmclachlanproject I tried this on a Monday and it works! Thank you
@KiyoshiMarin
@KiyoshiMarin 7 ай бұрын
What a Gantt chart! Really the best! Thank you so much, David.
@paolamorales2751
@paolamorales2751 2 жыл бұрын
Do you have a tutorial on how to add dependencies between tasks? Great video!
@davidmclachlanproject
@davidmclachlanproject 2 жыл бұрын
Not yet but it's a good idea 🙂 Will get on it soon!
@michaelgilmartin4350
@michaelgilmartin4350 3 ай бұрын
@@davidmclachlanproject loved this video and was able to get a gantt up and running, Having the ability to do dependencies would be amazing
@lehlohonolotumelo7109
@lehlohonolotumelo7109 Жыл бұрын
All the way from South Africa. i would like to thank you for such an amazing work and assist. Thank you bro😃
@DarthJ2164
@DarthJ2164 Жыл бұрын
Absolutely great tutorial and explanation! Your positive energy has made me even more excited to start using this format. I will be updating my project timelines to this format! THANK YOU!
@MatthiasLeimbach-tj2wm
@MatthiasLeimbach-tj2wm Жыл бұрын
You, Sir are one of my favorite human beings!
@leandros40
@leandros40 Жыл бұрын
Excellent clip, thank you David! Very detailed and helpful. One question: is there a way to edit/ament the chart and have the months broken into weeks and the weeks into dates, and then by using the "Group" function under Date to collapse or expand the cells?
@prashantprajapati7006
@prashantprajapati7006 5 ай бұрын
Thankyou so much for the detail explaination, I just created chart by using your methods. It turns out really good. thanks again:)
@coryrubino8007
@coryrubino8007 2 жыл бұрын
Thank you for the video, David! Your instructions made it so easy to replicate. Quick question for you. Is it possible to set an estimated completion date(set with diamond on the Gantt chart) for a task, but it fills in the weekly boxes with the corresponding color as the weeks go by? Essentially extending past the diamond in the chart until an actual completion date is entered?
@marfa233
@marfa233 2 ай бұрын
Really nicely done! Not often you frame-by-frame step through a youtube video :)
@mickholgate3347
@mickholgate3347 Жыл бұрын
Hi David, hope you are open for development suggestions, if so @1:22 when you select complete, the progress should ideally default to 100%.
@vcanadian1971
@vcanadian1971 Жыл бұрын
I agree…what formula would you recommend?
@julianwearne4967
@julianwearne4967 7 ай бұрын
This is a top notch tutorial for a top notch product. Appreciate your efforts a lot here David.
@AmitPatel-123
@AmitPatel-123 2 жыл бұрын
Amazing tutorial , i was able to successfully create a great tracker using this. Made few tweeks to highlight overdue items status box and remove highlights from gantt chart if status marked as not started. Again thank you so much for this great tutorial , subscribed
@siddhanthkaushik3991
@siddhanthkaushik3991 Жыл бұрын
Amit do you mind sharing code for overdue items please?
@chinwanong1899
@chinwanong1899 2 ай бұрын
Hi, do you sharing the overdue items status box? I am looking at adding actual completion date and highlight the overdue items..
@houseoffashionhf6612
@houseoffashionhf6612 Жыл бұрын
Mr. David .. first of all thanks for your efforts and wish you all the best, some functions are not working with me like milestone (the diamond) and blokes filling .. any idea? Is it related to the window or something else? Can you please help in this?
@frederikloumann
@frederikloumann 2 жыл бұрын
Hi David, great tutorial! Do you know why excel returns "there's a problem with this formula", when I e.g. try and run IF(K$4=($F6-WEEKDAY($F6,2)+1),"u",""). The same also goes for the following formula when trying to add the gantt bars? Best regards
@Gowaz89
@Gowaz89 2 жыл бұрын
Try using " ; " instead of " , " That worked for me
@AndreasBodin
@AndreasBodin 5 ай бұрын
Absolutely phenomenal! 🤩 Thank you very much David. 🙏🏻
@joshualederhandler6157
@joshualederhandler6157 2 жыл бұрын
Great video, thank you! If I want to take the individual days timeline and turn them into weeks across a month, how could I do that?
@Safari_Secrets.
@Safari_Secrets. Жыл бұрын
Did you ever find out how to do this?
@joshualederhandler6157
@joshualederhandler6157 Жыл бұрын
@@Safari_Secrets. no
@sandrabiggerstaff8602
@sandrabiggerstaff8602 2 жыл бұрын
OK...this is amazing. Thank you for sharing you learning. I work in Project, but sometimes not everyone has project within an organization.
@steffipullely6907
@steffipullely6907 2 жыл бұрын
Hey David, just wanted to say that I love what you created. I wanted to ask if you have expanded any further using Gantt charts on excel? For example adding in a critical path or milestones, keeping track of budget used in each phase etc
@morristheman1848
@morristheman1848 2 жыл бұрын
Would love to see this as well! Let me know if you found somewhere else to do this
@ksojoel
@ksojoel Жыл бұрын
that would be awsome, since the critical path is.. well.. CRITICAL in any project
Make This Awesome Gantt Chart in Excel (for Project Management)
17:13
Kenji Explains
Рет қаралды 318 М.
How to Make a Risk Assessment Matrix in Excel
16:10
David McLachlan
Рет қаралды 506 М.
when you have plan B 😂
00:11
Andrey Grechka
Рет қаралды 65 МЛН
escape in roblox in real life
00:13
Kan Andrey
Рет қаралды 82 МЛН
How to Make Gantt Chart in Excel
7:44
Kevin Stratvert
Рет қаралды 669 М.
How to Make a Project Management Plan (Complete)
52:43
David McLachlan
Рет қаралды 38 М.
Master Microsoft Project in 20 MINUTES! (FREE COURSE)
18:39
Alvin the PM - Become a Certified Project Manager
Рет қаралды 422 М.
PowerPoint tutorial No 320 How to make Gantt Chart easily in PowerPoint
12:18
POWERPOINT UNIVERSITY
Рет қаралды 312 М.
How to Make a Gantt Chart in Excel
12:54
Vertex42
Рет қаралды 3,7 МЛН
TECH-005 - Create a quick and simple Time Line (Gantt Chart) in Excel
9:36
The Excel Challenge
Рет қаралды 3,2 МЛН
when you have plan B 😂
00:11
Andrey Grechka
Рет қаралды 65 МЛН