🔴 How to modify Out of Sequence activity from the Primavera P6 project?

  Рет қаралды 6,032

Ahmad Setayandeh

Ahmad Setayandeh

Күн бұрын

Пікірлер: 15
@afsanehaliverdi
@afsanehaliverdi Жыл бұрын
thank you for posting this video
@GlobalProjectControl
@GlobalProjectControl Жыл бұрын
You're welcome 🙏
@Dandre01
@Dandre01 7 ай бұрын
Thanks Ahmad. I would agree that if you have many OOS conditions this method might be prudent. I resolve these manually and check these conditions frequently. Appreciate you sharing your techniques.
@GlobalProjectControl
@GlobalProjectControl 7 ай бұрын
Yes, you are right. This method is helpful for big data modifications.
@abdelouahabbelalia2072
@abdelouahabbelalia2072 Жыл бұрын
Great , thanks
@GlobalProjectControl
@GlobalProjectControl Жыл бұрын
I was glad to hear that 🙏
@Adeel2023
@Adeel2023 9 ай бұрын
I have done the same steps to modify out of sequence activity but the result come out schedule log txt does not exist?
@GlobalProjectControl
@GlobalProjectControl 8 ай бұрын
Go to "Schedule" and before "push the schedule" in the schedule dialog box TIK > LOG TO FILE. Now, if you schedule your project, then VIEW LOG will work.
@a.m2764
@a.m2764 7 ай бұрын
hello sir ... i have two questions needing help 1- After fixing in execel , i found this message(The User Preferences used to create this Excel file are not the same as your current preferences. Importing this file could corrupt your data. Please refer to Help for more information about importing data from Excel. Are you sure that you want to continue?) Is there a problem or continue ? 2- After updating : why budgeded units or costs before D.D disappear and the distribution of them is reassigned on next months differently compared to baseline?
@GlobalProjectControl
@GlobalProjectControl 7 ай бұрын
For Error 1: I guess that you exported the file from another system and you want to import it on a different system that doesn’t have the same user preferences setting. This is the wrong approach. Your second question is not clear enough, I suggest you look into this video: 🔴 How to Update Multiple Resources in Primavera P6 with Excel Help 🎞 kzbin.info/www/bejne/pGS8mKGJpNmdrKc
@noumanzia
@noumanzia 3 жыл бұрын
Can please elaborate on the rationale behind changing the relationship in excel and not in primavera p6? Thanks
@GlobalProjectControl
@GlobalProjectControl 3 жыл бұрын
if you want to: 1. Add more relationships to the software, you need to fill all columns which I used in the video. 2. Modify the available relationship, need to change its base on the update. but the important note is, if the change included a compulsory field, you need to remove the available information and re-create it (this is software procedure)
@wasimahmad1423
@wasimahmad1423 3 жыл бұрын
Kindly make a video on revised and recovery schedule
@masoudshams1
@masoudshams1 2 жыл бұрын
Can you Ahmad Jan say why you simply did not click from P6 and change it to SS?
@GlobalProjectControl
@GlobalProjectControl 2 жыл бұрын
If you work with a big database then an excel spreadsheet update is easier than a manual update
🔴 How to create a Project Lag and Lead Report in Primavera P6?
5:27
Ahmad Setayandeh
Рет қаралды 4,8 М.
REAL 3D brush can draw grass Life Hack #shorts #lifehacks
00:42
MrMaximus
Рет қаралды 12 МЛН
ЗНАЛИ? ТОЛЬКО ОАЭ 🤫
00:13
Сам себе сушист
Рет қаралды 3,2 МЛН
Я сделала самое маленькое в мире мороженое!
00:43
Will A Basketball Boat Hold My Weight?
00:30
MrBeast
Рет қаралды 120 МЛН
Method to Eliminate Out of Sequence Activities
17:04
Project Management & Control - by ASIF (Asif)
Рет қаралды 3,6 М.
🔴 How to create DYNAMIC S-Curve by PIVOT table in Primavera P6
12:53
Primavera P6: Out of Sequence Work
7:31
Bill Pepoon
Рет қаралды 50 М.
Out of Sequence Activities Lesson 03
13:49
Ali Katary
Рет қаралды 9 М.
Up and running with Primavera P6
54:32
Obalim Esedebe (Ciel Consulting)
Рет қаралды 79 М.
Out of Sequence in Primavera P6
8:07
Plan Academy Inc.
Рет қаралды 9 М.
🔴 Baseline Modification (Update Baseline)
9:01
Ahmad Setayandeh
Рет қаралды 6 М.
To determine Out of Sequence Activities in Primavera P6
10:34
Project Management & Control - by ASIF (Asif)
Рет қаралды 1,1 М.
REAL 3D brush can draw grass Life Hack #shorts #lifehacks
00:42
MrMaximus
Рет қаралды 12 МЛН