Hello sir, thanks for the video. I noted that the box that contained the last refresh time didn’t change. Do you know how to fix that?
@smokeatlas6 ай бұрын
Thank You for the video. Does it work when Power BI on my computer is closed? How can I make it work out of access to my computer but refresh it online?
@heddyjazy6252 Жыл бұрын
very good, need how to send reporting automatically with power automate to a list of receivers. pro tips!
@hogolytics Жыл бұрын
We have some options, will create another videos for you. Follow the channel to get notified when it's get published.
@dimindimin8306 Жыл бұрын
Hi. Thanks for the good video. Could u help me, how to refresh automatically datasets not simultaneously but each after other? I mean, when one dataset finished refreshing, next starts.
@hogolytics Жыл бұрын
Hi Dmytro, If you know how much it takes for each dataset to get refreshed, between each step you can add a delay step, similar to the time you need for refreshing each dataset. Then the next dataset refresh starts after N minutes when the previous one started. Cheers, Shahab
@josecarlosbenitezmeyer645 Жыл бұрын
Hello, Amazing vídeo, really helpful, but by progamming the date and time Of the Dataset refresh, this will update a published report, who is already being showed on a TV?
@zohra10473 ай бұрын
Great!
@Al-vl3tp8 ай бұрын
what if the Power Automate fails with a 5 min refresh and we have to cancel the dataset refresh in Power BI service. Does Power Automate has a flow or action to cancel out a data refresh? I would like to add this action if my data refresh fails and I can to cancel the data refresh on the Power BI side until the next scheduled API call from Power Automate.
@blasegarrecht73306 ай бұрын
What if you don't want a button? How would you handle a monthly set day of month refresh since Power BI doesn't allow this? I want to just use refresh dataset from power automate, and then schedule it on 7th day of the month
@utubebellamkonda6 ай бұрын
What if I have more than 3 datasets? Can we get items from share point list and loop through?
@alikeyhani9080 Жыл бұрын
Nice tip! Thanks a lot Shahab!
@hogolytics Жыл бұрын
Thanks for your comment Ali
@thangnguyenhuu556 Жыл бұрын
Hi thanks for sharing, but in step select workplan, I can see my workplan, do you know why? Thanks
@persiorak20D4 ай бұрын
what if the data is from a sharepoint list? the button on the report is not refreshing after i update the sharepoint.
@hhjkjjhhhjjjjj6 ай бұрын
Thank You Sir!
@harshyadav-qu8eb8 ай бұрын
Hi , in my case date is not updating if I do refresh via web portal but in power BI desktop it does , any solution
@hogolytics8 ай бұрын
Have you checked if your refresh is not failing on service?
@umarqayyum10988 ай бұрын
Thank You Sir
@hogolytics8 ай бұрын
Cheers
@kuldar.9 ай бұрын
Is it possible to refresh only selected tables in report and publish the result with Power Automate?
@KomailButt Жыл бұрын
The power automate flow has to be in run condition all the kind or it will automatically refresh on the schedule time selected?
@hogolytics Жыл бұрын
We have 3 types of flows: 1. Instant flows: running by pressing a button by user. 2. Scheduled flows: running by setting a schedule and will run on a specific time. 3. Automated flows: running by an event such as arrival of an email from a specific person, or a mention of your company in social media.
@EhsanRavana Жыл бұрын
karet dorosteh, like
@hogolytics Жыл бұрын
Thanks Ehsan jan, happy you liked it.
@cpvardhan5968 Жыл бұрын
There is different way to automate more efficiently using Azure data factory and service principal
@Harry-xi1wy6 ай бұрын
how?
@cpvardhan59686 ай бұрын
@@Harry-xi1wy search same in Google u will get it easily
@manjunathrampure3567 Жыл бұрын
If i add the Run flow button in the same report which I want to refresh it's not refreshing and values are also not refreshing as well while in a published mode
@hogolytics Жыл бұрын
have you checked your refresh limit based on your license?
@noprogramming Жыл бұрын
how much limitation to refresh?
@hogolytics Жыл бұрын
Would you please explain more? What limitation you mean?
@Lukzai Жыл бұрын
@@hogolytics With a Power BI Pro license, data refresh is limited to 8 times per day. Does using Power Automate to refresh the data still count toward this limit?
@hogolytics Жыл бұрын
@@Lukzai Thanks for your comment. Yes, that limitation will apply to whatever method you are using.
@Wzxxx10 ай бұрын
I think that manualy You can refresh without limit
@SubinMathewz6 ай бұрын
@hogolytics Is there any workaround to refresh the dataset more than 8 times per day?? I have a power bi premium license User.. I have to share my report with pro users.Please suggest
@UPHARANAND3 ай бұрын
We have multiple ways to refresh a report. My question is , which refresh is fast
@naiduvikas20211 ай бұрын
Could people tell me is it this feature available for pro users or free users.. ? Im using free version if i share this flow my team members is it works..?
@mohamedamine4425 Жыл бұрын
How to automate the publish report to app ???
@hogolytics Жыл бұрын
This is unfortunately not an option. You have to explicitly update the App to reflect your changes.