Don't miss it one bit. 13 hour long days driver gets 12.50 an hour. Get back to the yard hoping your done for the day and they put one more on ya. Construction delivery sucks.
@bigrigben12028 жыл бұрын
You must have been working for a terrible company. I make $23/hr doing this...
@josephbangle67676 жыл бұрын
31.55
@jeremyquintana46556 жыл бұрын
Joseph Bangle where, I too get 15/hr. To do this
@AccountInactive2 жыл бұрын
Times may have changed since you posted this, but I'm at $20 an hour working 7-4 or 8-5.
@mikearicks77 Жыл бұрын
30.50/hr. Your pay sucked. Even back then.
@tdalton5068 жыл бұрын
what are your rules with PowerLine...or lines in general
@MartinHentges6 жыл бұрын
Tim Dalton I know!!! I was like that’s DAMN close! I’m sure it was either boom it up or hand unload it up.... obviously the boom won that battle
@jacobtoledo32865 жыл бұрын
20ft no matter what from any line in the air smh
@joebeebe794 жыл бұрын
No way in hell you go over power lines no matter how far away you are something gives out and boom! My boss ever told me to hang a boom over power lines I’d hand him keys
@davelapointe69976 жыл бұрын
I see atleast 3 osha regulation fails.
@outrockz29054 жыл бұрын
Who cares?
@mikearicks772 жыл бұрын
I see at least ONE hater.
@sandralazar16303 жыл бұрын
What is minimym thickness used if sheet of dry wall used in condo
@mikearicks772 жыл бұрын
1/2 Inch thick drywall, but if your building contains 6 or more units/condos, more than likely it'll be 5/8 thickness depending on your local/state codes.
@Order-in-Chaos9 жыл бұрын
Crap, look what the plumbers did to the stud wall 1:10 Freaking jokers!
@eugenemills849210 жыл бұрын
Y'all are horrible . Next time place the dolly in the middle of the load while extending that far out ! Hanging right there on the side ? Seriously ? Is that concrete floors you are laying the Sheetrock flat against ? The condensation will surely make that last sheet stuck to the floor ! Stop being lazy and put it on some dunnage or risers !