will you be going back there in near future _ interesting to see the progress of bridge over River Great Ouse _ that section I don't remember being filmed before _ it's interesting to see those structures & sections that get either little or no coverage _ more nice drone footage 👍 looking forward to seeing your next update 👏
@simoncroft97922 ай бұрын
Great video detail thanks, but does anybody know why the track underneath is so wide?
@stevetony68762 ай бұрын
Thanks. Just wondering whether the cutting has yet to reach its bottom? 👍
@JohnHoward-wc9kk2 ай бұрын
To allow space for HS3, when HS2 is so popular it reaches capacity !. ( just kidding !).
@matthewfisher20882 ай бұрын
@@JohnHoward-wc9kk yeah i wonder what hs3 is for any reason
@Paul_7072 ай бұрын
@@stevetony6876 the drawing I found on the HS2 website does suggest the cutting will be significantly deeper, around 17 or 18 metres, and the bridge is the whole width of the future cutting. Between the slopes the track bed is no wider than elsewhere. But I think it does include a continuous maintenance access track alongside it.