Simple and to the point as usual, thanks Eng. Hani
@Hasshirkhanbri Жыл бұрын
Thank you so much Sir for teaching step by step in very easy, understandable way... thanks again.. :) God bless you .
@01234msk10 ай бұрын
Thanks for your knowledge sharing. It will helpful for all planners
@FernandoRodriguez-gx1gq Жыл бұрын
Oh wow, super grateful for this. Thank you sir!
@obadaabuarisheh41298 ай бұрын
this video is of great value. I appreciate the content and the hints that saved a lot of time and effort. thank you very much 👍👍
@danysoty7 ай бұрын
I really appreciate this video, very useful and informative directly to the point. Thank you Sr.
@PlanningengineerNet4 ай бұрын
You are very welcome
@thefutureisnow29342 жыл бұрын
You are the best! I love you! ❤
@mouh48 Жыл бұрын
Thanks for you Mr Hany
@GABSIAN1838 Жыл бұрын
Thank you for the explanation
@marilynyballa8092 жыл бұрын
this video helped me. thanks
@abdullateefmatar23972 жыл бұрын
مشكور أستاذ هاني... تحياتي
@ranjithkumarsakthivel74888 ай бұрын
Thank you for sharing KT. I downloaded the Excel sheet and the same step followed. The sheet didn't work during Ctr+C. Kindly help on this.
@habibmohiuddin8396 Жыл бұрын
Can we use the same method for Physical % completion type? Secondly, once we import the file then do we have to schedule the p6 file again with that particular date as "data date"? Thanks
@ahmed.elnebishi5 ай бұрын
planned % column shown in your layout eng hany .. is this the same schedule % complete ?
@PlanningengineerNet4 ай бұрын
Yes, both are the same.
@LSTSPERUАй бұрын
@@PlanningengineerNet Sir, the ACTUAL % column shown in your layout .. is this the same PHYSICAL % COMPLETE?
@praneshnevalib.e2694 Жыл бұрын
Sir, Thanks for this. I have a doubt. How can we get planned % monthly based on physical activity but not by cost. Can you please reply sir
@ZUBAIR-l6b7 ай бұрын
I have updated the Project as per actual dates and the schedule % is showing progress values like 50% completed for each activity but for whole project the schedule % is still 0. please help me in this regard
@jervettabruce14674 ай бұрын
How do you get the WBS colors?
@PlanningengineerNet4 ай бұрын
Please check this post: planningengineer.net/from-primavera-to-excel-sheet/
@giovannilevering5353 Жыл бұрын
when Ctrl + C doesn't activite the macro, you probably should activate this in Excel by opening the properties of the macro. in this menu you can allow the working of macros from other docs.
@mohamedghobashy207 Жыл бұрын
right click in the file than make it unbolcked file to work
@usmanali-fm3ih10 ай бұрын
Can you change the Short key from Control+C to Some other key because this is using mostly in Excel and its repeating every time
@tinaenowenow9537 Жыл бұрын
So smart. Thanks
@azamkhan43632 жыл бұрын
Good information.
@Hussam072 жыл бұрын
Thanks, useful tips
@LSTSPERUАй бұрын
can we update RELATIONSHIP too?
@PlanningengineerNetАй бұрын
Yes, we can do this. If you are interested in such smart ways, i recommend this course to you: planningengineer.net/courses/construction-project-planning-intermediate-level-with-p6-excel-powerbi/
@TheJawid698 ай бұрын
How can I contact you Eng. Hani?
@ahmedshehata69202 жыл бұрын
excel file template is not working properly.how can i fix this issue
@irshadilamdeen26302 жыл бұрын
Engineer How did you get planned % column, you mean schedule %?
@waqasamin9332 жыл бұрын
Yes u have to rename it
@tarrynbosman13027 ай бұрын
Hi may I please get this excel document of yours its really cool. Thanks
@jousalek7507 Жыл бұрын
how to add the Planned percentage and Actual Percentage Column?
@howyousa29562 жыл бұрын
thank you
@ahmadyassin10892 жыл бұрын
hi sir, i already push ctrl + C but nothing change as per P6. please help. thanks
@tarysen31132 жыл бұрын
yes. Nothing is working.. please help.
@RamblingPen1432 жыл бұрын
Try shft+ctrl+c
@404maciek9 ай бұрын
Something doesn't work here, how are you getting the time in the VLookup when the site engineer document doesn't have that. No engineer will give you the time something will finish at either....
@ahmdrafa887 Жыл бұрын
Thank you Eng.Hany
@TANMOYCHATTERJEE-gn3wx2 жыл бұрын
Useful
@hamzarehman4948Ай бұрын
Sir by importing the data I don't get exact performance percentage
@PlanningengineerNetАй бұрын
If it is a small variance then please check the decimals. You might need to increase it in your P6 settings so P6 will accept them. Otherwise, we need to do further investigation about the reason behind it.
@hamzarehman4948Ай бұрын
Okay sir I try again its same
@hamzarehman4948Ай бұрын
Sir pm ask me to make the 3 schedule of 1 project. How can we make a 3 schedule of 1 project. Is that possible
@ehabsalah84462 жыл бұрын
I paused on ctrl c nothing changed
@mubashiramir892 Жыл бұрын
Ctrl+C not working
@aceringor829011 ай бұрын
There is no marco
@PlanningengineerNet11 ай бұрын
Why you need macro?
@404maciek9 ай бұрын
Enable it in the settings...
@SaadKallih4 ай бұрын
@@PlanningengineerNet me too the Macro was not there, I need it to give the colors to the shchedule