Update P6 Schedule from another P6 Schedule | Update Primavera Baseline from progress

  Рет қаралды 7,271

Planning Engineer FZE.

Planning Engineer FZE.

Күн бұрын

Пікірлер: 15
@SkyOryx
@SkyOryx Жыл бұрын
Hi Hany, this is very informative. However you should include the Remaining Duration in importing to excel, so that it will reflect in the updated baseline as well. Anyhow, keep on posting this kind of tutorial. Cheers
@aasimmohammad643
@aasimmohammad643 3 жыл бұрын
Thanks ! Very clear & easy
@PlanningengineerNet
@PlanningengineerNet 3 жыл бұрын
You are welcome :)
@bosplanner1682
@bosplanner1682 2 жыл бұрын
Hi Mr. Hany very clear explanation thanks .
@PlanningengineerNet
@PlanningengineerNet 2 жыл бұрын
You are most welcome :)
@Aryanss5743
@Aryanss5743 3 жыл бұрын
Hi. Atfer doing this step how to match planned value and earned value and Performance percent complete? Please make a video on this also. Thank You.
@RiyadhScenes
@RiyadhScenes 3 жыл бұрын
Yes it's not coming equal
@jamalahmad5100
@jamalahmad5100 2 жыл бұрын
السلام عليكم انا اتبعت كل الخظات بس في عندي مشكله لما اعمل import ترتيب الانشطه بيختلف يعني كل ال WBS بتختفي وبتظهر كل الانشطه بدون اي wbs/ شو بكون السبب؟
@PlanningengineerNet
@PlanningengineerNet 2 жыл бұрын
ما فى شىء بدون سبب. اتاكد ان WBS path مظبوط
@jamesparker6317
@jamesparker6317 2 жыл бұрын
Hi Hany, why would you not just save a baseline in p6, on the progressed schedule rather than updating the old baseline in excel? Thanks
@ahmdrafa887
@ahmdrafa887 3 жыл бұрын
Thanks a lot!
@RiyadhScenes
@RiyadhScenes 3 жыл бұрын
How to prepare extension of time for a project what is the procedure for doing it
@PlanningengineerNet
@PlanningengineerNet 3 жыл бұрын
The answer is a complete course :) here it is: planningengineer.net/courses/claims-management-and-delays-analysis-online-workshop/
@husammahdi6895
@husammahdi6895 3 жыл бұрын
plz if you can explain just this short video in Arabic
@PlanningengineerNet
@PlanningengineerNet 2 жыл бұрын
There is Arabic Channel you can join me there اهلا باشمهندس ... يوجد قناه عربيه تابعنى هناك kzbin.info/door/oOsUpxqK6hhSOJLyOE3AeQ
Monitor the project without cost or Resource loading
15:34
Planning Engineer FZE.
Рет қаралды 11 М.
import progress updates with actual dates to primavera p6
10:32
Planning Engineer FZE.
Рет қаралды 29 М.
GIANT Gummy Worm #shorts
0:42
Mr DegrEE
Рет қаралды 152 МЛН
#behindthescenes @CrissaJackson
0:11
Happy Kelli
Рет қаралды 27 МЛН
I'VE MADE A CUTE FLYING LOLLIPOP FOR MY KID #SHORTS
0:48
A Plus School
Рет қаралды 20 МЛН
UFC 287 : Перейра VS Адесанья 2
6:02
Setanta Sports UFC
Рет қаралды 486 М.
Managing Baselines in Primavera P6
10:21
Ten Six
Рет қаралды 117 М.
How to Update Shop Drawings and Materials in your schedule
9:40
Planning Engineer FZE.
Рет қаралды 4,1 М.
How to Update a Schedule in Primavera P6
9:45
PJM Scheduling Services
Рет қаралды 28 М.
What P6 Schedule Comparison Tool Should You Use?
26:52
Plan Academy Inc.
Рет қаралды 10 М.
🔴 How to use Resource Curve in Primavera P6
10:44
Ahmad Setayandeh
Рет қаралды 8 М.
Import Cost from excel to primavera 6
7:40
Planning Engineer FZE.
Рет қаралды 63 М.
When Updating Actual Units & Costs - Primavera P6 Settings EXPLAINED
9:04
How to Prepare a Schedule Logic Report in Primavera P6
15:29
Planners' Place
Рет қаралды 9 М.
GIANT Gummy Worm #shorts
0:42
Mr DegrEE
Рет қаралды 152 МЛН