Well first thing I see is a violation an OSHA violation, that would be the man in the manlift has his machine in a very very dangerous place. The beam is elevated above the boom of the manlift placing this man's life in a dangerous situation. Just my first impression of the ongoing operation.
@Real_Tim_S2 жыл бұрын
I saw your comment and watched the video - and yet I disgre with you. It appears the beam was suspended between the base of the man-lift and the foundation piers, based on the direction of rotation of the manlift and which side of the beam the worked ended up on (moving the sling). It also apepars that the jobsite did mitigate exposure of the bulk of the personnel to the high-risk rigging change task (passing an end of the load between cranes), only exposing the one person (probably very well trained and in a hazard pay role). It's important to note the scale of the beam is misleadingly large, each beam appears to be about 6-8 feet tall, and between 80-100 feet long.
@langetv70583 жыл бұрын
Cây dầm tí xíu mà làm thấy ghê
@SIMALUNG4 жыл бұрын
video nya tidak stabil ....pakai HP barangkali ya ....coba sekali pakai drone