Large SIP House Timelapse Installation

  Рет қаралды 120,392

Eco-Panels of Tennessee

Eco-Panels of Tennessee

Күн бұрын

Пікірлер: 32
@FourthWayRanch
@FourthWayRanch 8 ай бұрын
How much more than traditional frame and insulation?
@EcoPanelsofTennessee
@EcoPanelsofTennessee 8 ай бұрын
Generally, a few percent of the overall budget, but it depends on codes where you live and labor costs, so it can vary a great deal. In some areas of the country right now it's just as affordable to build with our panels as the hoops and hurdles builders have to go through to meet energy codes. Most of our customers see a ROI within the first few years from their energy bill savings. After that, it's money saved every month. That's now a $ per square foot answer of course, because that's almost impossible to do and represent everyone that could be reading this. Shoot us a plan, and we'll shoot back an estimate.
@christiancabrera-h4g
@christiancabrera-h4g Ай бұрын
pueden colocar un video de como hacen la instalacion electrica
@JimLogger-jo9ck
@JimLogger-jo9ck 3 ай бұрын
Can a powered retractable awning be mounted when most of the mounting length is osb?
@EcoPanelsofTennessee
@EcoPanelsofTennessee 3 ай бұрын
It very likely could without additional reinforcement. It depends on the number of fasteners the mounting requires. The more opportunity, the better. That said, if we know this up front, we'll add some 2x blocking to the interior to the panel to allow for that connection. We commonly do this with cabinets, porch roof connections, etc. Great questions, thanks!
@reseller7
@reseller7 8 ай бұрын
Was this done in one day? What was the cost of all the panels? Is there additional video's on this home?
@EcoPanelsofTennessee
@EcoPanelsofTennessee 6 ай бұрын
Just realized we missed this question, our apologies. Yes, this was completed in one day. We don't post pricing on YT, but if you would like to email us (info@ecopanelsoftn.com) or give us a call, we'd be happy to talk about your home plans and give you a range on cost. We build panels custom to owner's home plans. Unfortunately, this is the only video of this specific project, but we have several others on the channel. Thank you!
@reseller7
@reseller7 6 ай бұрын
@@EcoPanelsofTennessee A panel that has a aluminum foil sheet covering it would be great for fire protection. I'm wondering how long a torch would take to burn through to the wood?
@BrokersNetwork
@BrokersNetwork 2 жыл бұрын
Surprised I don't see many electrical outlets in panels.
@EcoPanelsofTennessee
@EcoPanelsofTennessee 2 жыл бұрын
We work with customers or their GC / electrician to map out the exterior electrical needs and embed conduit and boxes in our manufacturing process. The panels are pretty easily modified as well, so if additional electrical is needed or was overlooked, in most cases additional electrical can be placed in the panels on-site. Appreciate your comment!
@patsquach4080
@patsquach4080 10 ай бұрын
Some people have chosen base board electrical systems….
@abelma7176
@abelma7176 11 ай бұрын
Hola! Usan clavos o tornillos? Cuáles? Cada cuántas pulgadas en el perímetro? Saludos desde Argentina.
@EcoPanelsofTennessee
@EcoPanelsofTennessee 11 ай бұрын
We don't speak Spanish so I used Google Translate and it gave your questions as: Hello! Do they use nails or screws? Which is it? Every how many inches around the perimeter? Greetings from Argentina. I'll reply first in English, then post what Google Translate gave me as well. Hopefully that helps: You can use nails or screws, your choice. For most project it's 8D Sinkers Nails or #10 1 1/2" Screws, both at 6" O/C. This can vary should engineering on a specific project require something different. Puedes utilizar clavos o tornillos, tu elección. Para la mayoría de los proyectos, se utilizan clavos de plomo 8D o tornillos #10 de 1 1/2", ambos a 6" O/C. Esto puede variar si la ingeniería de un proyecto específico requiere algo diferente.
@abelma7176
@abelma7176 11 ай бұрын
@@EcoPanelsofTennessee gracias
@EcoPanelsofTennessee
@EcoPanelsofTennessee 11 ай бұрын
Denada!@@abelma7176
@donsmith9081
@donsmith9081 2 жыл бұрын
I like the concept and am considering using sips for an ADU project coming up. Are you guys interested in giving me a bid?
@EcoPanelsofTennessee
@EcoPanelsofTennessee 2 жыл бұрын
Absolutely Don. You can give us a call at 800-356-2396 or send us the info through our website: www.EcoPanelsoftn.com
@reseller7
@reseller7 8 ай бұрын
Did you get your bid? Where are you building the ADU? I live in Bay Area. ADU from scratch cost a fortune.
@donsmith9081
@donsmith9081 8 ай бұрын
@@reseller7 Unfortunately my mother had some setbacks and will not be able to live by herself. I liked cutting edge homes Elara model.
@carlosalvarez2352
@carlosalvarez2352 6 ай бұрын
Hi!! How many sq foot ?? And how many days take for done ??
@EcoPanelsofTennessee
@EcoPanelsofTennessee 6 ай бұрын
I believe this was around a couple thousand square feet, and yes, it was completed in part of one day.
@raicebannon1936
@raicebannon1936 9 ай бұрын
Why does it take 5 men to "frame"? Three extra men could cost $120 to $240 more per hour. Labor is expensive. It only had taken two men to "stick frame" our home last time we built.
@EcoPanelsofTennessee
@EcoPanelsofTennessee 9 ай бұрын
Good observation. However, it doesn't. This was something we realized after filming. Basically we had more people on-site for the filming than we needed. For the most part, 2-3 are just standing around the whole time. It's really handy to have 3 and that's probably where you make the best time, but 2 people can handle the process easily. When you have 3, that third person is getting the next panel in place. Good eye. Overall, you should save significantly on labor.
@h20bearboy65
@h20bearboy65 4 ай бұрын
It's time - man hours. i can tell you - as one who used SIPS on my roof (on top of an ICF home) it was much faster - plus - no insulation worries etc - faster cheaper better
@lostasltu3224
@lostasltu3224 Жыл бұрын
2:41
@casimoran
@casimoran 3 ай бұрын
Do you export to Mexico?
@EcoPanelsofTennessee
@EcoPanelsofTennessee 2 ай бұрын
It can be done through a third party.
@edubtte
@edubtte 6 ай бұрын
parece mucha gente , sobren dos
@EcoPanelsofTennessee
@EcoPanelsofTennessee 6 ай бұрын
Sí, es porque estábamos filmando. Teníamos demasiada gente en el lugar de trabajo. Sólo necesitas de 2 a 3 personas para hacer esto.
@marcialsanchez7171
@marcialsanchez7171 Жыл бұрын
INTALATION ELECTRIC AND PLUMBING???
@EcoPanelsofTennessee
@EcoPanelsofTennessee Жыл бұрын
Here's a video addressing electrical: kzbin.info/www/bejne/bIDMqKmuhrlketE Plumbing really shouldn't be installed in exterior walls, as determined by most codes. Penetrations are generally not a problem if needed, but even still, those should be located through a foundation or subfloor joist band where possible. We mention plumbing in a couple videos, but do not have one dedicated to it. Since Eco-Panels are only used for the exterior walls, interior plumbing is no different than any other house as it's ran through typical 2x framing. Hope that helps. Thanks for hte question.
We built a cheap house. A new technology. Step by step construction process
10:11
Enclosing A Timber Frame With SIP Panel Walls | Martha’s Vineyard | Ep. 4
13:10
Une nouvelle voiture pour Noël 🥹
00:28
Nicocapone
Рет қаралды 9 МЛН
SIPs Building Kits for Do It Yourselfer's
3:48
Eco-Panels of Tennessee
Рет қаралды 44 М.
SIPs Electrical Wiring Installation
6:49
West-Eco Panels
Рет қаралды 12 М.
Roof Panel Demonstration | Eco-Panels of Tennessee
10:28
Eco-Panels of Tennessee
Рет қаралды 4,4 М.
SIPs Production Line
2:50
Gluestream Equipment
Рет қаралды 111 М.
We built a frame house in three days. Step by step construction process
10:12
Dad builds a house
Рет қаралды 19 МЛН
We built a Canadian house in three days. Step by step construction process
10:03