Lesson 7 part 1 Add shop drawings submittals and approvals to the time schedule

  Рет қаралды 28,687

Planning Engineer FZE.

Planning Engineer FZE.

Күн бұрын

Пікірлер: 18
@mohammedelewy5878
@mohammedelewy5878 5 жыл бұрын
Thanks So Much E. Hani For this recognized lesson ,,,,,,,
@solomonsackey7775
@solomonsackey7775 4 жыл бұрын
Perfect. Thumps up
@mohammedaltaf4877
@mohammedaltaf4877 10 жыл бұрын
Fantastic job.
@engineerkhan6458
@engineerkhan6458 4 жыл бұрын
Nice
@pkmcpec1020
@pkmcpec1020 7 жыл бұрын
good job
@muhammadusmananwar8992
@muhammadusmananwar8992 Жыл бұрын
any other way to load budgeted cost? can we load as a expenses?
@denisgritsiyenko
@denisgritsiyenko 3 жыл бұрын
How do we take into account long lead items? We approved the shop drawings, but what if it 6 months out?
@caseydoseroscabrera3576
@caseydoseroscabrera3576 8 жыл бұрын
hi I want lesson 1 to finish of this video thank you
@mohammedaltaf4877
@mohammedaltaf4877 10 жыл бұрын
How i can get lesson 10,11,12
@alaaabuenayah1505
@alaaabuenayah1505 3 жыл бұрын
يعطيكي العافيه بس ياريت باللغة العربية
@codhighlights2910
@codhighlights2910 10 жыл бұрын
From previous lesson 6.6, after loading the cost all original duration became zero. Can you explain why this happened and how to fix it? thanks
@hasanshirazi9535
@hasanshirazi9535 7 жыл бұрын
Did you get the answer to this question? I am facing the same problem.
@abdulrahimtaha_
@abdulrahimtaha_ 6 жыл бұрын
1. Define the Cost resource as Material with unit of measurement $, and setting Standard Rate = 1.00/$. Keep "Default units/time" = 0/d. 2. Uncheck "Auto Compute Actuals" and "Compute Costs from units". 3. Assign Cost resource to all required activities. 4. Through Global Change tool, change the value of "Budget Material Units" under Cost Resource to 1. 5. Import Cost from excel file or directly input values into the "Budget Cost" parameter. Now when you will run the Scheduler or "Recalculate Assignment Costs", it will not effect your schedule or the Budgeted Total Cost.
@mingsun6683
@mingsun6683 6 жыл бұрын
How about trying to recopy the duration to excel file then importing the excel into Primavera again?
@hasanshirazi9535
@hasanshirazi9535 6 жыл бұрын
@@abdulrahimtaha_ Strange that your comment is exact copy of my comment on: engineerbook.net/questions/view/50/primavera-p6-duration-and-budgeted-total-cost-turns-zero Did you get it from there?
@abdulrahimtaha_
@abdulrahimtaha_ 6 жыл бұрын
@@hasanshirazi9535 yes 🙂
How to create activities and cost loading from BOQ
13:57
Planning Engineer FZE.
Рет қаралды 10 М.
كم بصير عمركم عام ٢٠٢٥😍 #shorts #hasanandnour
00:27
hasan and nour shorts
Рет қаралды 12 МЛН
Twin Telepathy Challenge!
00:23
Stokes Twins
Рет қаралды 148 МЛН
Mom Hack for Cooking Solo with a Little One! 🍳👶
00:15
5-Minute Crafts HOUSE
Рет қаралды 7 МЛН
Turn Off the Vacum And Sit Back and Laugh 🤣
00:34
SKITSFUL
Рет қаралды 11 МЛН
How to Update Shop Drawings and Materials in your schedule
9:40
Planning Engineer FZE.
Рет қаралды 4 М.
Lesson 7 part 3 Create shop drawing log
10:44
Planning Engineer FZE.
Рет қаралды 26 М.
Lesson 5part 2 Create Activity List and Cost Loading
22:55
Planning Engineer FZE.
Рет қаралды 28 М.
COST LOADING FROM BOQ IN PRIMAVERA P6 || PRIMAVERA P6 TUTORIALS
5:15
Top 5 KPIs for Project Managers [Pay Attention to These!]
7:32
Adriana Girdler
Рет қаралды 48 М.
Using NCC Volume Two
22:09
Australian Building Codes Board
Рет қаралды 3,2 М.
Lesson 6 part 6 Add the cost to each activity in the schedule
7:52
Planning Engineer FZE.
Рет қаралды 114 М.
Primavera P6: How to make S Curves in Primavera P6
19:07
Zero Float
Рет қаралды 216 М.
كم بصير عمركم عام ٢٠٢٥😍 #shorts #hasanandnour
00:27
hasan and nour shorts
Рет қаралды 12 МЛН