Does there need to be a gradient/slope or will the water find its way down naturally-into the first section at least? Very helpful
@tom903754 жыл бұрын
Hi there can you tell me what seaming pliers you were using? Great video.
@copperworks5 жыл бұрын
Isn’t it safer to use an solder iron to melt it together.
@craiginglis65995 жыл бұрын
copperworks lol
@chrisgodfrey24017 жыл бұрын
Code 5 length can't be any longer than 1.5metres. Anyone who use lead knows that. Not 2 metres. Jeezo
@mrc82214 жыл бұрын
Chris Godfrey 1.5m if longer weld a expansion joint on it
@JHZ864 жыл бұрын
You can do up to 2m with code 5 as long as it’s no more than 800mm in total girth.
@Sm17hy13 жыл бұрын
Whats the reason why you can only go to a certain meter? If you made a box gutter 3m long what's the problem?
@AdotHowe3 жыл бұрын
@@Sm17hy1 because of movement. Lead doesn’t stay still once it’s been installed into a box gutter and over time, it’s moves. The longer the sheet of lead you use, the more likely you’ll be for the lead to split, causing leaks.