Miss fishing in that river, back in California now.
@d-dayfishingworld79296 жыл бұрын
I’m sure somewhere in your area will have good fishing, just go out and look for it. Tight Line!!!
@MrVang19806 жыл бұрын
Got almost every kind of fish out here, except for walleyes.
@jonbrillhart51115 жыл бұрын
If you don't mind me asking where is your favorit spot in wood county for the maumee river walleye run
@d-dayfishingworld79295 жыл бұрын
Buttonwood
@jonbrillhart51115 жыл бұрын
@@d-dayfishingworld7929 thank you
@jonbrillhart51115 жыл бұрын
@@d-dayfishingworld7929 is button wood still closed?
@d-dayfishingworld79295 жыл бұрын
The park is now partially open for the run
@jonbrillhart51115 жыл бұрын
@@d-dayfishingworld7929 thanks
@jonathanperry39896 жыл бұрын
Good job my friend.. Good explanation of what to do as situations change.. A+++
@d-dayfishingworld79296 жыл бұрын
Thank you my friend
@林淸-d3v6 жыл бұрын
Now is good time for walleye run fishing
@林淸-d3v6 жыл бұрын
Do you speak Chinese
@林淸-d3v6 жыл бұрын
I am at Chicago,maybe I am going Monday,could you tell me what size and how many walleyes to keep
@alexfamie52556 жыл бұрын
林淸 no I don't speak Chinese but I can tell you 4 fish a day and 15 inches is minimum size. Good luck!
@unicornsandflamingosarebes28466 жыл бұрын
Ooh nice video!🎥 Do you let your bait drift with the current?
@d-dayfishingworld79296 жыл бұрын
Thanks, yes, I let the jig drift with the current
@unicornsandflamingosarebes28466 жыл бұрын
D-day Fishing World nicee! 👍
@burakgokmen14866 жыл бұрын
Nice video for beginners like me. Which area were you if don't mind me asking? I am planning to go tomorrow. Thanks.
@d-dayfishingworld79296 жыл бұрын
I was fishing at buttonwood that day.
@burakgokmen14866 жыл бұрын
Thanks. I caught one today. But buttonwood was running fast.
@alexfamie52556 жыл бұрын
Nice vid! I was over at bluegrass that day only got 2. #TIGHTLINES
@d-dayfishingworld79296 жыл бұрын
Thank you. From now it only going to get better!! Tight line!!
@alexfamie52556 жыл бұрын
D-day Fishing World 2 at Orleans park today was there from 230 pm to 530 pm. #TIGHTLINES
@d-dayfishingworld79296 жыл бұрын
Nice
@dalestickel39066 жыл бұрын
Day do you have a current river report for us viewers? Thanks.
@d-dayfishingworld79296 жыл бұрын
Fishing should be good from now till next high water, multiple limits are caught today . Good luck fishing, tight line!!
@garrettsin68985 жыл бұрын
Hey d-day Im a freshman at UT and I was wondering if you can teach me the ropes to the maumme because I never fished anywhere here before
@d-dayfishingworld79295 жыл бұрын
Hey is the playlist from my channel will show you the basics info how to fish the Maumee River walleye How to Maumee river walleye run kzbin.info/aero/PLOqFLYjzuNhA0tekC1RTrZznjVGuE6ekV Good luck to you. Tight Line!!
@xiangchen24936 жыл бұрын
Do you just let the bait drift or you reel them back?
@d-dayfishingworld79296 жыл бұрын
I let my bait drift with the current
@WebBasedPayroll6 жыл бұрын
How do you snag them like that
@d-dayfishingworld79296 жыл бұрын
Some time the fish will rub against the jig, and feel like a fish bite, when you set the hook it will snag the fish
@dennismosley33006 жыл бұрын
How deep is the river
@d-dayfishingworld79296 жыл бұрын
Where we stand is 3’ or so, where the fish caught is 7’ or so
@dnell33276 жыл бұрын
Where exactly? I’m here now and no luck
@d-dayfishingworld79296 жыл бұрын
Fishing location change based on the water level doing that time. I had a video just for that, so go check it out. Tight line!! kzbin.info/www/bejne/gX3GYaKwjbCDeaM
@mt06875 жыл бұрын
Can I ask you what rod you are using in this video?
@d-dayfishingworld79295 жыл бұрын
It was pro walleye rod 7’ Medium power extra fast action from G-Rods All the gears info are listed in the video description. Thank you for your view and support! Tight Line!!
@timfabian50855 жыл бұрын
Do you ever use shorter or longer leaders when the water is high?
@d-dayfishingworld79295 жыл бұрын
Not so much about how high is the water, is mostly about how active the fish is
@timfabian50855 жыл бұрын
D-Day Fishing World ok so you just try both see what they hit on ?
@d-dayfishingworld79295 жыл бұрын
When water temperature is low during the early season I’ll start with 2.5’ of leader. when the water temperature gets warmer, the fish will get more active, then I’ll start with 4.5’ of leader
@timfabian50855 жыл бұрын
D-Day Fishing World thank you! tight lines!
@d-dayfishingworld79295 жыл бұрын
You are welcome, good luck to you
@brentpeters26046 жыл бұрын
You make it look so easy, Iv been to the river twice this year and didn’t catch a thing.
@d-dayfishingworld79296 жыл бұрын
Always better luck next time to you
@joshuabetz31676 жыл бұрын
Is it me?, Or do they just not fight😕
@d-dayfishingworld79296 жыл бұрын
Walleye don’t fight much at all
@Mallerlyn6 жыл бұрын
oh wow nice !
@d-dayfishingworld79296 жыл бұрын
Thanks
@Rscmgw236 жыл бұрын
Maumee River flossing at its finest
@d-dayfishingworld79296 жыл бұрын
Thanks
@林淸-d3v6 жыл бұрын
Can you tell me the location
@d-dayfishingworld79296 жыл бұрын
Buttonwood
@林淸-d3v6 жыл бұрын
Thank you
@vuhuynh78336 жыл бұрын
No
@matthewsheridan79546 жыл бұрын
Do you realize that you are lining everyone of those fish? Even the ones that are in the mouth most likely didn’t bite you jus flossed them. Disgusting!! The longer leader makes snagging them easier.
@林淸-d3v6 жыл бұрын
hi,可以加你微信吗?
@andytong51126 жыл бұрын
林淸 I don't think he is Chinese
@d-dayfishingworld79296 жыл бұрын
I’m a Chinese, but I don’t use WeChat that much
@foxxxy516 жыл бұрын
Great video!!!! Good stuff
@d-dayfishingworld79296 жыл бұрын
Thank you
@waynepic12075 жыл бұрын
Your setting your hook late I am right across from you down there
@garymiddleton6586 жыл бұрын
run is not in full swing yet
@d-dayfishingworld79296 жыл бұрын
Not yet, but almost there
@asianray6146 жыл бұрын
Any advice? I’m trying to take my son there
@d-dayfishingworld79296 жыл бұрын
If you never fish the Maumee River Walleye Run, watching them fish for little bit. see how people doing it before you start your fishing. Ask the people next to you for some advice if you need, I’m sure there is a lot people willing to help.
@jesusonjesus6 жыл бұрын
Hi I go to your job all the time :)
@d-dayfishingworld79296 жыл бұрын
Thanks for your support
@Brianlee1316 жыл бұрын
Hello sir. Great video. Is the run still happening?