I moved to Union SQ in 1990, was told back then, the Green line was coming. Moved out in 2015, still no Green line, but it's almost under construction! Here we are 32 years after it was first announced and we have this slow train. I love public transit but we are so bad at it.
@blackman74372 жыл бұрын
Impressed, you were able to get this video out and edited just in time for GLX Opening Day Day
@json81192 жыл бұрын
The multi use path mentioned around 7:10 or so is on the other part of the GLX project. It'll be an extension of the Somerville Community Path which currently ends at Lowell St. Lowell St is where the Magoun SQ station will be located. The Community Path Extension will go all the way to Lechmere and connect to existing bike paths there. If you look just behind the new Cambridge REI (edit: spotted at 10:10) you'll actually see where the Community Path Extension will end. Some folks have already pirated the trail (it's kinda done already) but GLX construction vehicles and equipment are being stored on the path extension so it won't open until a month or two after the Medford Branch of the GLX project opens. This will be ~~sometime~~ this year if we're lucky. 🙃
@moishglukovsky2 жыл бұрын
Well done. I regularly stayed at the Fairfield Inn on Msgr O’Brien Hwy for business and watched the line go from a gravel RoW to an elevated line. Nice to see it finally moving!
@JasonBentrosnowqube2 жыл бұрын
I just returned from Norway yesterday and I found out that the new green line extension opened, so I had to go for a ride on it :D
@Token_Nerd2 жыл бұрын
Miles Gigachad moment for getting the first train. Dude just fly next time. It's okay we won't hate you.
@casmatt992 жыл бұрын
As a Bostonian - "Mass Ave at 3:57 AM" is one of the most creepy sentences I've heard
@NortheastbaseballАй бұрын
He's a brave soul.
@MBTA12342 жыл бұрын
Yesterday I managed to ride the new glx and even tho the stations feel a but rushed for their completions the elevated junction makes for a bit a thrilling ride however the fare validation needs to be replaced with fare gates bc I managed to get in the train from both union Square and leachmere without needing to present validation
@RichardChonak2 жыл бұрын
I knew we could count on you to provide a worthwhile report. Thanks!
@AA_8184_12 жыл бұрын
Another milestone documented well done as always!
@mbtagooseman15712 жыл бұрын
nice vid man was cool to see everyone there and get the first rides in!
@matthewdezii2 жыл бұрын
The long platforms were the first thing I noticed about Lechmere from my ride yesterday. Aside from having to run for your train, I guess they'll come in handy when the "as yet unidentified longer Type 10 trains" arrive. Great video!
@andrew_ray2 жыл бұрын
I seem to remember hearing in a board meeting that Lechmere uniquely was sized to accommodate three type 10 cars in case they ever decide to run triple consists. Other stations on the extension will be sized for two-car type 10 consists. The reason only Lechmere is that long is because it is elevated and therefore would be more difficult to extend later.
@xianyuff82422 жыл бұрын
Union square branch has a lot of speed restrictions, it should be 20mph at platform to diamond crossing, and 15mph east bound / 10mph west bound at the 5.75% / 6% grade on the flyover junction. Maybe that is the reason for the five minute trip from union square to lechmere.
@edwardmiessner65022 жыл бұрын
Another milestone for Boston. I hope sometime in the near future they decide to extend the GLX E Line out to Porter to connect to the Red Line with a free transfer
@ianc4352 жыл бұрын
Too bad the 9s are garbage
@AllTransitandAirplaneMedia10392 жыл бұрын
I was there today and I think the 2 new stations are so cool
@Molejules2 жыл бұрын
I guess I'll have to aim for getting the first Medford branch trip, huh.
@casmatt992 жыл бұрын
The lack of fare gates at these new stations is absurd. They chose to forego them because of the new project to update to an entirely new cashless payment system. Bizarre.
@williamerazo39212 жыл бұрын
You can still have faregates.
@graffmixer2 жыл бұрын
Nice video…Ill have to check it out when I head to Cambridgeside Galleria tomorrow. As far as I heard, the fare validation is temporary until they have the fare transponders installed on the Green Line doorways of the trolley. Kinda like they do for other systems like San Fransisco MUNI
@MilesinTransit2 жыл бұрын
Yeah, it's temporary until whenever AFC 2.0 arrives, which...keeps getting delayed.
@andrew_ray2 жыл бұрын
@@MilesinTransit Allegedly because the same contactor got the OMNY contact in New York and decided we didn't matter anymore.
@AmtrakProductions2 жыл бұрын
This was so fun ! So crazy that this happened
@charlesbosselman86492 жыл бұрын
The Dunkin donuts in Union Square is the pits. You cannot go to the bathroom there. Because it's broken. There are not enough benches at any of the station
@chromebomb2 жыл бұрын
Boston is an interesting and confusing place but I'm happy you guys got new trains
@JasonBentrosnowqube2 жыл бұрын
Do you think that there should be new commuter rails adjacent to some of the new green line stations like on the red line or orange line? I feel like a new station at union square will allow easily access between union square and porter
@edwardmiessner65022 жыл бұрын
Actually I think it would have been better if the T had built the extension out to Porter to connect to the Red Line without paying an additional fare or going into the city.
@MilesinTransit2 жыл бұрын
Do you think there would be room? In a world of proper regional rail, though, it would be great!
@matthewennis35912 жыл бұрын
They considered going further but it would require land and property taking.
@TheDylanJoyce2 жыл бұрын
As always, the Trains are Beautiful!!!
@cedricye17672 жыл бұрын
Good video, insane dedication! The speed to upload this video is really impressive, nice job! Could you have not used BlueBikes or something to get to Union?
@MilesinTransit2 жыл бұрын
Thank you! And yeah, good point, that...would've been a better idea...
@mbtavideos2 жыл бұрын
The fare validation is ridiculous and can't go fast enough. I was there later in the day it was rather nice and quite - Union Square offers some great places for lunch.
@kespeth22 жыл бұрын
The trains pulling up as far away from the station exit as possible is even more of a problem...but will hopefully be addressed soon.
@SnowyCountryChicken2 жыл бұрын
@@kespeth2 That’s the MBTA standard operating procedure, to stop as far away from the entrance/exit as possible. For example, Boylston, Kenmore, Government Center, etc.
@012832 жыл бұрын
3:47 I also like how it still says Arbor way instead of heath st
@JacksonBetz2 жыл бұрын
is 0:30 a lost lyric from the chorus of Breakfast at Tiffany’s ~foreshadowing~
@JacksonBetz2 жыл бұрын
4:12 well gosh darn, I always mentally pronounced the first syllable of “Lechmere” to rhyme with “deck” haha
@danib622 жыл бұрын
Couldn’t be there myself today but this is almost as good
@PikalaxALT2 жыл бұрын
I think the new lechmere station platform is as long as it is to support union square and medford branch trains stopping in two different places along the platform, maybe?
@MilesinTransit2 жыл бұрын
I guess that probably could be done with how the Green Line is signaled, but I don't know if that was intentional or not...
@petecolombo Жыл бұрын
I grew up right near here, by the old Lechmere station.
@kespeth22 жыл бұрын
Hmmm, if the longer trains effectively stop closer to the entrance/exit of the station, that could solve the problem I've been harping about...the almost mile walk people have to take to get betweent he trains and the street. No person with disabilities should have to walk that far.
@qjtvaddict2 жыл бұрын
Like the NY G train
@danmur152 жыл бұрын
I rode up to Union Square a few weeks ago (I even went to that same dunks!) and the validation system made no sense. A worked just ended up letting me go anyway lmao
@ClassyWhale2 жыл бұрын
Can't catch a break with New Haven, can you?
@Madness8322 жыл бұрын
How many ticket machines are there? Could imagine that bein' a bottleneck if not enough.
@MilesinTransit2 жыл бұрын
2 at Union and 4 at Lechmere - I could definitely see lines forming!
@j7gy8b2 жыл бұрын
I did not know how to pronounce "Lechmere", apparently. Thanks for saving me some embarrassment when I visit next week.
@kespeth22 жыл бұрын
3:10 "no comment". I think he was probably winded out from the walk too. lol
@kespeth22 жыл бұрын
Also, I wonder if pass holders have to get a receipt too. I can see this as detrimental to the environment. That and the long walk are two strikes already.
@kespeth22 жыл бұрын
Ah, I didn't notice the second exit when I went there later that day. Of course, I went there from inbound so I never tried out the validation system... If the second exit saves any walking, that's a plus...but that exit looks like it's int he middle of nowhere lol. Sorry for so many comments, but I see a LOT wrong here.
@kespeth22 жыл бұрын
As I said a zillion times, I would personally raise the rating if they actually pulled the trains closer to the station exit. That's my biggest problem here. In fact, I give it one point less than you because of that. 5/10 for me. Everything else I agree with you totally.
@MilesinTransit2 жыл бұрын
Fair enough re: your score! And everyone has to get a receipt, including pass holders - it's ridiculous.
@NorEaster_Cyclone Жыл бұрын
they used too much chain link fencing, one of the handicap door buttons was attached to chain link. also it's gotta be freezing, why not enclose the stations more
@anthonycurioso97972 жыл бұрын
Why is there so much squeaking on the new tracks? It's not quite as bad as the Park St/Boylston area, but it's still noticeable
@ianc4352 жыл бұрын
They are new They’ll wear in. Also they are using flange lubricators on wheels made from graphite. It’ll take time. But hopefully it gets better.
@brianreed312 жыл бұрын
I heard that they want to extend it west from union square
@MilesinTransit2 жыл бұрын
To Porter, yeah!
@3506Dodge2 жыл бұрын
That is an extraordinarily complicated ticketing system.
@casmatt992 жыл бұрын
New stations are longer than existing because they are procuring a new fleet of green line trollies that will be a much longer, single car set.
@anthonybanchero30722 жыл бұрын
The Type 10s? I believe those will be 7 sections.
@damiancooper30632 жыл бұрын
I was on the first train that made the union sq announcements
@damiancooper30632 жыл бұрын
This was Saturday morning
@soflaav8r2 жыл бұрын
NERDS!!!! Haha just kidding, great video. What is your opinion on extending commuter rail into NH? Think it will ever happen?
@qjtvaddict2 жыл бұрын
Umm it already runs it’s called SLE and metro north
@soflaav8r2 жыл бұрын
@@qjtvaddict The furthest north it goes is Lowell. That's not NH. There have been proposals to extend it as far north as Concord
@MilesinTransit2 жыл бұрын
I'd love to see New Hampshire commuter rail, at least to Manchester. Concord feels like something that might be better served by a shuttle train to Manchester.
@andrew_ray2 жыл бұрын
@@soflaav8r I believe qjtv misunderstood NH to refer to New Haven (as seen at the start of the video).
@damiancooper3063 Жыл бұрын
RIP the Union Sq walkway March 21 2022 to April 20 2023
@danib622 жыл бұрын
At least the validation system is supposed to be temporary
@AmtrakProductions2 жыл бұрын
@2:35 *jaywalking fines*
@trainandmore2 жыл бұрын
OH SHIT I forget that's today, I know what I'm doing tomorrow! I do disagree with your union sq score, the validation system is stupid yes, should just be fare gates. You're building a new station from the ground up, why didn't you install gates properly, or tap on the train? But the fact that majority of the wheelchair/ disabled accessibility ( particularly the entrance at 7:25) is teetering on passing by the looks of it, I'd give it a 2/10 Lechmere seems to be a improvement over Union & the old Lechmere, but again why didn't they install gates, you're not remodeling and there's no space, you're building from the ground up. Why didn't you install gates?
@large_bean2 жыл бұрын
I agree that gates would have been the logical option, but: 1. Tapping on the train isn't a great solution because GLX uses all island platforms, so the doors open on the left while the fareboxes in the open cabs are on the right (and up the stairs, so not accessible), and 2. GLX was designed without gates to work with AFC2.0, which would have made tapping on the train work (readers at all doors). but yes, since AFC2.0 is pretty far away and there is space for gates, especially at USq, they should just put some gates in. Or if they really had to do some kind of validator half-measure, at least use a standalone validator (a la SEPTA Regional Rail) rather than doing the whole complex thing with the FVMs. Heck, if you need a cheap temporary half-measure, even taking a bunch of fareboxes out of buses being retired and lining 'em up in a row would be an improvement - at least it'd avoid bottlenecking riders with the slow process and only two FVMs to use for it
@andrew_ray2 жыл бұрын
Gates were removed to save costs. AFC2.0 was supposed to be done by now. Sometimes things don't work as planned.
@damiancooper30632 жыл бұрын
I got there before you did
@charlesbosselman86492 жыл бұрын
You can only go to Heath Street from Union Square
@SnowyCountryChicken2 жыл бұрын
You can switch over trains once you’re at Government Center to Lines B, C, or D. You can switch over the trains before you passed Copley Square. You don’t have to stay on the same train all the way to Heath.
@AIRRAZOR442 жыл бұрын
Again, Boston & MA as a whole has a habit of not prioritizing key issues when it comes to safety, reliability. Light rail makes absolutely no sense for Boston & it’s metro area They should get rid of a bunch of stops on the B & C lines Ideally, the green line should have a 4 track local-express system in down town Boston similar to the system used in NYCT All trains should be heavy rail & allow bikes Restart the late night bus system as the population as the cities/towns around the City of Boston continue to grow in population & wealth. The rents, construction of new residential construction have shot up around the extension It would save a massive amount of time
@Token_Nerd2 жыл бұрын
Dude just use the city share bikes
@AmtrakProductions2 жыл бұрын
That’s what I told him ! 😂
@MilesinTransit2 жыл бұрын
Hahaha, I know, it didn't even cross my mind!
@Token_Nerd2 жыл бұрын
@@MilesinTransit too much Amtrak brain for you
@charlesbosselman86492 жыл бұрын
My rating is 4 very poor. To long between trains
@joshgoldstein15682 жыл бұрын
Not even a new train for the first run? Lame MBTA
@qjtvaddict2 жыл бұрын
It will be gone soon thankfully
@trainrover2 жыл бұрын
clearly shan't age well
@charlesbosselman86492 жыл бұрын
Why must we listen to this guy? Anyway the Green line extension is good. But needs improvement Union Station is too far from the street