No video

Mill Woods to City Centre LRT Video

  Рет қаралды 55,832

City of Edmonton

City of Edmonton

Күн бұрын

This video follows the southeast portion of the route from Mill Woods Town Centre to City Centre West, shows the locations of stops and stations and provides an overall look and feel of how new tracks and low-floor trains could integrate with Edmonton neighbourhoods.
The video offers a preliminary idea of how the Southeast to West LRT could look based on the Concept Planning phase. It does not include details from the current Preliminary Design phase or future developments. It also does not reflect the results of past and ongoing consultation with the public and various community groups throughout the city. The video will be updated to incorporate valuable information resulting from public consultation when the Preliminary Design phase is completed. Preliminary design will continue through 2013.
www.edmonton.ca...

Пікірлер: 35
@MultiCappie
@MultiCappie 12 жыл бұрын
- Moving attractions back downtown - Focusing on walkability and street feel - Building a five spoke LRT hub at Churchill Square Really like the way this city is going in the last 6 years.
@tomysshadow
@tomysshadow 11 жыл бұрын
I think the LRT would be a lot more useful if it were expanded to West Edmonton Mall.
@chrisgallo99
@chrisgallo99 11 жыл бұрын
Excellent route plan. All the way from millwoods through bonnie doon and on the surface west from 96 street. Stony to 156 to meadowlark, misericordia, WEM, lewis estates-brilliant. Can't wait to see it.
@mikerisi
@mikerisi 11 жыл бұрын
the design is okay but it should be underground downtown. It shouldnt eliminate several lanes of traffic on 102 ave. It should be underground.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
Each low floor car will be 40 metres long and have a passenger capacity of 270. The new line will support two-car trains, for a passenger capacity of 540 per train. The Southeast to West stops will be built to accommodate two-car low floor trains.
@CityofEdmonton
@CityofEdmonton 11 жыл бұрын
During periods of regular snowfall, trains will be run at continuous intervals along the tracks in order to keep them clear. The LRT corridor itself will have high priority for snow clearing. Beyond this, the LRT Project Team has visited several cities operating urban LRT under winter conditions in order to learn their best practices; some of these may also be adopted depending on the severity of the snowfall.
@WallyWychopenvideosonyoutube
@WallyWychopenvideosonyoutube 11 жыл бұрын
I rode this "Urban" Low Floor LRT in Phoenix, and I think it's great. It's very accessible and is a very smooth ride . It is the kind of train I could ride just for fun to see the sights, and Edmonton has lots of things to see out the windows. I doubt though, that ETS would match the lower fares Phoenix offers seniors.
@MultiCappie
@MultiCappie 12 жыл бұрын
They're two very different centres. Churchill is all cultural facillities and the LRT interchange, while Centre West serves all the office towers and shopping podiums on 101 Street (nearly every major tower we have) plus the proposed arena.
@Oilerfan5
@Oilerfan5 12 жыл бұрын
cuz that's what low-floor LRT is for, in a dense area it's essentially designed to be a fancy street car.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
Under a P3 delivery for the Southeast LRT, the City of Edmonton will continue to control the fares to ensure that all transit services in Edmonton are part of an integrated system. Purchasing a monthly pass, or a single use pass on the bus or either of the LRT lines, will entitle the rider to use all 3 modes of Edmonton’s transit system.
@CityofEdmonton
@CityofEdmonton 11 жыл бұрын
Preliminary design concludes this year (2013); detailed design will take place when a consortium is chosen to construct the Valley Line. Basically, by end of November 2013, the plan for the Valley Line will be "shelf-ready".
@CityofEdmonton
@CityofEdmonton 11 жыл бұрын
The City of Edmonton has held more than 50 public consultation events on the Valley Line since preliminary design began, and will continue to do so over the coming months. The final public consultation for the West segment takes place on September 18, 2013, and the final plan for the entire line will be presented to Edmontonians at City Hall at a future date in November.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
Having a single entity responsible for all these items creates a “whole-of-life” approach to designing, constructing, operating and maintaining the LRT system. This reduces risk on the project, which reduces the cost of the project over its full life cycle.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
Risks associated with the design, construction, operation, maintenance and financing of the infrastructure are transferred in part to the P3 contractor. Risks associated with constructing the infrastructure, along with the long term maintenance of the infrastructure, are passed on to the P3 contractor. Normally, the City receives a 2 year warranty on new infrastructure, however under a P3 scenario, the City receives a 30 year warranty.
@WallyWychopenvideosonyoutube
@WallyWychopenvideosonyoutube 11 жыл бұрын
Snow is still going to be a problem for the low train. We have enough trouble clearing the streets in Edmonton. How is the snow going to be removed from the grooves when the rails are flat with the streets?
@sherwood2222222
@sherwood2222222 11 жыл бұрын
Building underground cost a lot.We here in Edmonton were lucky it was built about 30 years ago.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
Ultimately the City, Province and Federal governments will pay the full value of the capital investment. However under a P3 delivery, the contractor front ends a portion of the capital investment. The contractor is then repaid over the 30-year operations and maintenance term. That front-ended contractor capital ensures that the contractor will deliver the service per the specifications that are prescribed.
@CityofEdmonton
@CityofEdmonton 12 жыл бұрын
The City will also define performance specifications for the service to be provided, including but not limited to the frequency of service, cleanliness of the system and ride quality. If the P3 operator does not perform to the prescribed levels of service, their payments are reduced accordingly. These financial incentives will ensure that service on the SE-W LRT is adhered to the same level as our current LRT system.
@Oilerfan5
@Oilerfan5 12 жыл бұрын
love everything, but why did you have to get rid of whitemud amusement park?! i grew up at that place...
@yegventures
@yegventures 12 жыл бұрын
You gotta understand that this LRT is a LOW FLOOR LRT... more like a glorified street-car, but with it's own dedicated lane. Stations with a low-floor system are no more than just a curb with a few benches. Portland is a great example of low-floor LRT.
@martinrable
@martinrable 11 жыл бұрын
I like where Edmonton's mass transit system is going. I'm a little apprehensive about Calgary's system and where it's heading... The downtown core will be burdened with four above-ground lines, creating so much ridiculous congestion! Why didn't we build underground like you guys?!
@BryanTran
@BryanTran 12 жыл бұрын
Omgomgomgomgomg city centre bike lanes!!
@yegventures
@yegventures 12 жыл бұрын
Going through the traffic circle without a direct free-flow from Connors to 83st is a huge mistake. Other than highway cloverleafs, traffic circles are the most efficient intersections for traffic volume. As well, taking morning commuters on a joyride around the river valley is hardly a faster commute. I can guarantee that this train will be slower than the buses that currently serve Millwoods. On the upside, great job at moving the line from 103ave to 102 now.
@imgursdownvote4love771
@imgursdownvote4love771 10 жыл бұрын
Build it. Either that or make a streetcar system (join the streetcar system with the LRT at the crossing just before southgate station or at the end of the line)
@Gchwow
@Gchwow 12 жыл бұрын
Besides the fact that they both house very different kinds of activities (cultural/festivals vs. shopping/business) building transit stops for low-floor LRT cost a fraction to the huge concrete stops that the current LRT has, and they barely take up any extra room, as well.
@niveoserenity5862
@niveoserenity5862 12 жыл бұрын
Can't wait :)
@timhortans
@timhortans 12 жыл бұрын
Again, thanks for the response. And again secondly, is the private firm(s) that will be running the train contributing money to the project? From everything that i'm reading the City, province, and Federal are the only ones contributions the capital investment into the project. Thanks for the info. a
@squee222
@squee222 12 жыл бұрын
How long are these train platforms? Can this new line support five car trains (the same capacity as the current network)?
@seamusmuldrew5623
@seamusmuldrew5623 11 жыл бұрын
i know that is a problem,but it is still awsome!
@timhortans
@timhortans 12 жыл бұрын
First of all thanks for the response, I really appreciate it. Secondly, whats the point of private company running public funded infrastructure. All the news briefs state that the "risk" of running is being transferred to the private company, what risk are we talking about? For private company, making money is the bottom line, can you please clear up how the City and the Fed gov will ensure same quality of service as we receive now. Where are the rail drivers coming from? How is this better? thx
@GODDAMBATS13
@GODDAMBATS13 12 жыл бұрын
It seems so far away D:
@shikatari
@shikatari 12 жыл бұрын
why make a stop that is just a 3 minute walk away? seems like a waste of money. (churchcill and city center west)
@QuinceM1
@QuinceM1 12 жыл бұрын
Git 'er dun!
@timhortans
@timhortans 12 жыл бұрын
I love the fact that I will have to buy another bus pass because this train will be run by a private company, not the ETS.
@HELLH0WND
@HELLH0WND 12 жыл бұрын
Scrap it. Between using the streetcars instead of the existing real LRT trains we already have and implementing more at-grade crossings that have created more traffic messes then they’ve solved from latest expansion, this is exactly what we don't need. Better to wait for the right plan than hurry through the wrong one.
Giving Edmonton a Transit Makeover
17:18
RMTransit
Рет қаралды 60 М.
Valley Line LRT Animation
5:57
City of Edmonton
Рет қаралды 84 М.
Zombie Boy Saved My Life 💚
00:29
Alan Chikin Chow
Рет қаралды 33 МЛН
City of Edmonton Valley Line West LRT
6:08
ISL Engineering and Land Services
Рет қаралды 57 М.
Valley Line West Preliminary Design
6:08
City of Edmonton
Рет қаралды 32 М.
Capital Line South LRT Extension: Century Park to 41 Avenue
5:30
City of Edmonton
Рет қаралды 34 М.
Edmonton, A City Well Built
4:02
City of Edmonton
Рет қаралды 76 М.
Metro Line NW LRT Extension
5:29
City of Edmonton
Рет қаралды 33 М.
Union Stations: The Best, the Worst, and the Mildly Regrettable
16:16
West Edmonton Mall, Valley LIne
6:02
Mark DeLorey
Рет қаралды 1,2 М.
Hawrelak Park Constuction Update June 22/24
5:00
Ric's Drone Videos
Рет қаралды 2,3 М.