Рет қаралды 30,160
My garage project to raise a 9-foot ceiling height to 12.5-feet, allowing for a motorcycle lift to raise bike to close to 7-feet!
The lift was built by American Custom Lift (aclifts.com/).
Had the structure engineering plans done by Tucker Engineering (tuckerengineeri....
Bicycle lifts, by a kick-starter My Lifter (garagesmart.com/)
Motorbike lifted: BMW K1600 GTL
All other work accomplished with much thanks to my friends for leading a hand or tool when needed (particularly my friend Steve).
How long did it take? Well, considering this was an after-work project with only a few hours in the evening and on weekends here is what it took. Yes, I’m slow and anal …although my friend would argue that sometimes I wasn’t that anal …myself, “let’s just get this done!” :)
- 1-month for engineering plans to be drawn
- 1-week for city structural change and electrical permits (very nice smooth process)
- 2-days sheetrock demolition
- 2.5-months - reframing the ceiling joists
- 1-month - electrical/plumbing
- 2-weeks insulation
- 1-month sheet rocking
- 3-days for hired help to mud and texture
- 2-days painting
- 3-months waiting for lift to be built to specifications
- 3-hours for lift install
Be happy to go into further detail in any area, just hit me up with a comment.
Whether it’s a small or big project, you CAN DO IT!