Background:
Although Nepal's theoretical hydroelectric potential is huge, to date, Nepal has managed to harness only small fraction of such potentiality resulting scarcity of electricity in Nepal. Government's efforts are not only enough to fulfill the higher demand for electricity in the country. Realizing the fact, the government policy is now to maximize private sector involvement in the sector of water resource development for the construction of large, medium as well as small hydropower projects to continuously fulfill the electricity demand of the country and also to attract the foreign investment for the development of the water resource by developing the Hydropower projects. Realizing the situation Nyadi Hydropower Project (NHP) is a run-of-river type project, located in Lamjung District of Western Development Region of Nepal. The NHP was first identified in 1993 during the preparation of the Small Hydropower Master Plan. COWEL International (P) Ltd., sponsored by German Development Agency (GTZ) had conducted the first pre-feasibility study.
Project Area:
The entire project area (ie intake to powerhouse) is located within the Bahundanda Village Development Committee (VDC) in Lamjung District, Gandaki Zone. NHP is located on the right bank of Nyadi Khola which is one of the tributaries of the Marsyangdi River. The proposed intake site of the project is located approximately 2.50 km upstream of Naiche village of Bahundanda VDC and about 9 km upstream of the confluence of the Nyadi and the Marsyangdi Rivers. Similarly, the powerhouse has been proposed near Thulobeshi village of Bahundanda VDC about 3 km downstream from Naiche Village.
Technical Aspect of the Project:
The project has an installed capacity of 30 MW and will generate 168.5 GWh of energy annually. Water from the Nyadi River will be diverted to the 65 m long underground settling basin by constructing a 14 m long and 10 m high dam and then to the powerhouse through the around 4 km tunnel. The surface powerhouse contains two Pelton turbines. The tailrace water from the powerhouse will be released back to the Nyadi River through tailrace canal. The generated power will be transmitted through a 5 km long 132 kV capacity transmission line to the Khudi Hub to be constructed by the Nepal Electricity Authority at Khudi VDC of Lamjung district. From there the Nyadi Hydropower Project electricity will be linked to the national grid.
Accessibility:
The nearest town from project site is Beshisahar, which is the head quarter of Lamjung district and is about 176 km west from Katmandu, capital of Nepal. The first 130 km section of the highway between Katmandu to Dumre is a part of Prithivi Rajmarg and the rest 46 km from Dumre to Beshisahar is linked by Bhanubhakta Highway. The project site is accessed by a seasonal road of about 20 km from Beshisahar to Thakanbesi. Nyadi Hydropower Limited has constructed remaining seasonable road upto proposed intake site which is at Naiche Village of Bahundanda VDC. The road passes through powerhouse site at Thulobesi of Bahundanda VDC. The project site is accessed by a seasonal road of about 20 km from Beshisahar to Thakanbesi. Nyadi Hydropower Limited has constructed remaining seasonable road upto proposed intake site which is at Naiche Village of Bahundanda VDC. The road passes through powerhouse site at Thulobesi of Bahundanda VDC. The project site is accessed by a seasonal road of about 20 km from Beshisahar to Thakanbesi. Nyadi Hydropower Limited has constructed remaining seasonable road upto proposed intake site which is at Naiche Village of Bahundanda VDC. The road passes through powerhouse site at Thulobesi of Bahundanda VDC.

Пікірлер
Mini Hydroelectricity With 4 Extremely Powerful Water Outlets
13:58
Construction General
Рет қаралды 79 МЛН
He bought this so I can drive too🥹😭 #tiktok #elsarca
00:22
Elsa Arca
Рет қаралды 44 МЛН
Incredible Dog Rescues Kittens from Bus - Inspiring Story #shorts
00:18
Fabiosa Best Lifehacks
Рет қаралды 35 МЛН
when you have plan B 😂
00:11
Andrey Grechka
Рет қаралды 19 МЛН
Api Power Company Ltd
21:42
Api Power
Рет қаралды 2,8 М.
Micro-Hydro Feasibility Study Video Guide
13:20
Nathaniel Suryo
Рет қаралды 548
Nyadi Hydropower Project (30 MW)
18:29
Nyadi Hydropower Limited
Рет қаралды 641
Nepal-China Relations and Belt Road Initiative (BRI) | Prashant Singh
7:50
The 15MW Lusiwasi Upper Small Hydropower Station
6:19
ZESCO Limited
Рет қаралды 11 М.
Nepal Micro-Hydro
5:15
United Nations Development Programme (UNDP)
Рет қаралды 1 МЛН
He bought this so I can drive too🥹😭 #tiktok #elsarca
00:22
Elsa Arca
Рет қаралды 44 МЛН