Discovering the O-Train's East Extension: An Immersive Ride from Blair to Trim

  Рет қаралды 10,679

Rail Fans Canada

Rail Fans Canada

Күн бұрын

Пікірлер: 27
@kevinwhalen9377
@kevinwhalen9377 2 ай бұрын
Saw the first train go all the way to Trim while testing, very excited for this extension!
@RailFansCanada
@RailFansCanada 2 ай бұрын
We are really much looking forward to increased testing and are hopeful the line will open in Early 2025! Fingers crossed!
@alexitanguay
@alexitanguay 2 ай бұрын
Super intéressant!
@aduseihayford3325
@aduseihayford3325 2 ай бұрын
Great job keeps it up
@nanaokachi7657
@nanaokachi7657 2 ай бұрын
Second report of a train going all the way to Trim Station - rails and electrical would appear to be working - now just need to get the stations squared away
@footballfanstyleonye
@footballfanstyleonye 2 ай бұрын
That stretch is only max 80km/hr??? but it's a straight line..
@OntarioTrafficMan
@OntarioTrafficMan 2 ай бұрын
I was going to say exactly this
@danc1513
@danc1513 2 ай бұрын
Considering the train is supposedly rated for 105km/h max, it's disappointing that it's only 80.
@RailFansCanada
@RailFansCanada 2 ай бұрын
The speed in the simulator might not be the final speed in real life. They have yet to run a train end to end at any decent speed, so perhaps with the testing it may be faster and the simulator is being conservative on the speeds. I would suggest not taking the top speed in the sim as being the definitive top speed in real life when it opens (might end up being 80kph in the end but we do not know that for certain just yet). - Shane
@KerloTech
@KerloTech 2 ай бұрын
I worry that if 80km/h is the max esp on the highway sections, the public will 100% notice that the train is running much slower than traffic when traffic is clear. There will be much complaining. Lol
@OntarioTrafficMan
@OntarioTrafficMan 2 ай бұрын
@@RailFansCanada I think it's very unlikely that they are training operators on a different set of speed limits than the ones they will need to know, but I'm willing to give them the benefit of the doubt for the moment
@bonemar66
@bonemar66 2 ай бұрын
"Yeah control, I went to manual mode and went 82 km/h. Can you reset the e-brakes so the train can go?" "Fifth time this week Serge, watch it." "That 20 second button is driving me nuts."
@MysticalPerson48K
@MysticalPerson48K 2 ай бұрын
The Train might as well drive itself lol , You can't do what you want in the operator seat you are forced with speed limits pretty much a fool proof system. The Vancouver Skytrain is almost all computerized and I think that Ai will eventually take over train jobs in future.
@mlmielke
@mlmielke 2 ай бұрын
The control room generally controls the speed, not the operator, typically.. the signalling and speed control are the same as used on Skytrain for this.
@johnbrack3913
@johnbrack3913 2 ай бұрын
This video only went from Blair to Trim.
@TechOttawa
@TechOttawa 2 ай бұрын
I expect AUTO mode might be most common? So an operator can expect to press that button every 20 seconds FOREVER? Yikes...
@RailFansCanada
@RailFansCanada 2 ай бұрын
Yes most run in Automatic ATO so that button must be continually pressed. Alternatively there is also a foot pedal they can keep clicking away but the button is by far the most commonly used.
@TechOttawa
@TechOttawa 2 ай бұрын
@@RailFansCanada Thanks for the info, that would drive me nuts. A slot machine handle might be more fun. Some noises and lights?? LOL
@Brett-ws5eo
@Brett-ws5eo 2 ай бұрын
If your really a fan of rails stay far away from this monstrosity that destroyed the transit system in our city
@WasReloading
@WasReloading 2 ай бұрын
Too late now might as well support it. I think they should sell the trains the infrastructure is almost perfect. Except for those sharp bends.
@mlmielke
@mlmielke 2 ай бұрын
​@WasReloading Skytrain is only now replacing their Mark I lemons from the 1980s this decade... it is lifecycle stuff.
@Brett-ws5eo
@Brett-ws5eo 2 ай бұрын
@@WasReloading if it's not down for maintenance or flooding or derailment or whatever reason possible the service only runs half the year causing huge traffic jams and hundreds of people waiting for buses
@WasReloading
@WasReloading 2 ай бұрын
@@Brett-ws5eo yes exactly
@WasReloading
@WasReloading 2 ай бұрын
@@mlmielke This isnt the skytrain, this is a tram on a grade seperated line.
Is the Besançon light rail transit a good model to follow?
12:34
Félix on Rails
Рет қаралды 11 М.
Ozoda - Lada ( Official Music Video 2024 )
06:07
Ozoda
Рет қаралды 30 МЛН
How I Turned a Lolipop Into A New One 🤯🍭
00:19
Wian
Рет қаралды 10 МЛН
Why Train Tickets Cost So Much In America
20:17
CNBC
Рет қаралды 1,9 МЛН
The New Piccadilly Line Trains Are Being Constructed
10:39
Geoff Marshall
Рет қаралды 79 М.
56 High Speed Rail Links We Should've Built Already
18:35
CityNerd
Рет қаралды 418 М.
I Got Told Off By The Station Manager: Chasing Trains
18:28
Francis Bourgeois
Рет қаралды 244 М.
The COMPLETE History of London's Airport Express Services!
13:17
The TfL Three
Рет қаралды 11 М.
Ottawa's WEIRD Transit System
8:00
GeoNerd
Рет қаралды 18 М.