Is anyone else counting the number of cement trucks coming in from the top right??? I wonder what it costs to have a pumping machine like that per hour? Or the cost of the machine period? Amazing video again. Thank you.
@manuelmartin88903 жыл бұрын
Each truck is about 1500 to 2000 depending on mix desighn .the pump will have like a 2000 set up fee then anywhere from 200 hr to 500 hr
@whosbrian4071 Жыл бұрын
Pump over here is anywhere from 100-300 an hour depending on size minimum 5 hours
@dianawagner6151 Жыл бұрын
That’s the first thing I saw!
@michaelrexrode37595 жыл бұрын
The seawater eventually will go over, under, around and through that concrete. Within 3-5 years.
@victorofiesh21346 жыл бұрын
Houses shouldn't be there in the 1st place. Waste of time and resources.
@alexklenin3689 Жыл бұрын
Что хотят сделать? Образовавшийся провал залить бетоном? Но он будет своей массой давить на наружную стенку и она опять отвалится... Покажите, что стало с этим местом через 1, 2, 3 года? Какое состояние сейчас? Это интересно.
@ersinyasar76934 жыл бұрын
Mükemmel bir manzara 👏👏👍
@Once800-5 жыл бұрын
Mother Nature is showing us she’s the boss.
@Batman-wv5ng6 жыл бұрын
What a waste of concrete
@scotts65964 жыл бұрын
The Construction quality, on a precarious location ,( preparation of the site, and ground ), was obviously subpar. Questionable practices on using cheaper , inferior supplies, design and workmanship. Plus, Adding in the evident rising sea levels, resulting exacerbated erosion, which surpassed the previous construction specifications. And you have a recipe for eminent failure.