Very good content Full of knowledge, thanks for sharing such valuable stuff. I'm working as Quantity Surveyor but I want to join/change to cost control department
@AceCPAsBookkeeping7 ай бұрын
TLDR: Cost control in construction projects can be simplified and done with minimal involvement from the project team by developing baseline plans, collecting daily reports, and automating the process. 00:00 👷 Cost control in construction projects is simple and can be done with minimal help from the project team. 01:38 🏗 Develop baseline and forms to compare actual progress in cost control for construction projects, continuously revising based on project conditions and resources. 03:50 👷 Develop a cost control baseline plan in four sections: man-hours, equipment, materials, and forms. 05:56 🏗 Daily reports from site engineers, material stores, and equipment supervisors are essential for cost control in construction projects. 07:12 🏗 Cost control in construction projects involves tracking materials, manpower, and equipment usage to ensure accurate reporting and comparison. 08:58 🏗 Simplify cost control in construction projects by creating simple Excel sheets and templates to collect information from the site for material, labor, and equipment updates. 10:44 🏗 Populate all construction project data in one sheet for reporting, including materials, labor, and equipment updates, and automate the process to reduce working hours. 12:12 🏗 Control costs in construction projects by collecting information, preparing progress reports, and taking actions based on observations, while showing the team that cost control can be done with minimal involvement.
@shahiddr713 жыл бұрын
Excellent presentation
@PlanningengineerNet3 жыл бұрын
Thanks a lot
@anaselmasre27687 жыл бұрын
Very simple and informative, Regards.
@sayeedurrahmankhan85532 жыл бұрын
Thanks for such nice presentation can I have link to download the files?
@LifeOfHopeMinistry4 жыл бұрын
How can I get the sample excel sheets you used in this video? This is an outstanding job though
@rzs7867867 жыл бұрын
wonderful and easy
@ayushmansdiary26945 жыл бұрын
Can anyone pls explain me difference between budget and cost or should I say both terms are similar to each other.
@mohamedmedhat99426 жыл бұрын
1st I would like to thank you for these valuable course and your effort. 2nd I'm trying to download the course files but the link is not working.
@briansheils84854 жыл бұрын
HI Mohamed - did you manage to get hold of the files at all? I am also interested thanks
@quangduong28417 жыл бұрын
Very good presentation! How can I get the these excel files to practice? Many thanks
@mdmonowar73395 жыл бұрын
This was great, thanks, I've been looking for "construction schedule pdf" for a while now, and I think this has helped. Have you heard people talk about - Peyiley Fantastic Paramountcy - (Have a quick look on google cant remember the place now ) ? It is a good exclusive product for discovering how to download construction document templates without the normal expense. Ive heard some great things about it and my m8 got amazing results with it.
@mohamedelshafey16096 жыл бұрын
how we can get rest of the cost control lectures ?
@AbdSalam-uy4zt Жыл бұрын
كيف انزل شيت
@mohdirfan72917 жыл бұрын
Very informarive
@engrkamranullahkhan10836 жыл бұрын
There is no difference between the Activity item and Boq item ? plz elaborate this point i.e how to convert boq major detail in activity detail?
@zakariaalzubair66544 жыл бұрын
lCONST CONTROL PROBLEMS CONSTRUCTION PROJECTS IN UNITED KINGDOM (U.K) I need help for this one
@vugarmammadov1988 Жыл бұрын
Dear instructor at first thank you for such kind of valuable video. If may I ask you could you please share all these files (excel etc). If yes I will mention my email address. Thank you