Great but it would be good to see the pond finished though. That is the point of digging it
@spcpitts4 жыл бұрын
Showed it done at the end.
@gilb80724 жыл бұрын
Great job, great operator. The tilting attachment and ditching bucket are a great combination for something like this. Too bad you didn't have a helper to haul away the dirt so that you didn't have to keep moving your dirt piles. Where was the jobsite?
@AFHProjects4 жыл бұрын
It's so little pond project and to bring another machine to move dirt is not practical. Jobsite was in South-Estonia.
@owizcomg2 жыл бұрын
You have way more patience than I do, I fast forwarded through most of the video. Hey, I have a lot of videos to watch. LOL retired and nothing else to do.
@AFHProjects2 жыл бұрын
😄 Thanks! Keep watching.
@HeiniJrv5 жыл бұрын
Nice video!
@sebi_s51374 жыл бұрын
hello can you help me maybe i dug a pond a year ago but it is leaking and i don't know what i can do best
@AFHProjects4 жыл бұрын
I need more information. Like what is the soil type and where it's leaking. Is there a dam or something?
@sebi_s51374 жыл бұрын
@@AFHProjects yes there is a dam towards the valley below is a 90 degree bend with a standpipe 180cm floor type is slate :( sry for my bad english i come from germany
@sebi_s51374 жыл бұрын
I don't know where it's leaking
@AFHProjects4 жыл бұрын
How you know that it's leaking? Is there water coming in somewhere?
@sebi_s51374 жыл бұрын
@@AFHProjects yes spring water comes in the pond is 60000l but is empty again overnight
@MrBoatside3 жыл бұрын
Nice work! How many days did it take to dig that out? Was it about 10ft deep?
@AFHProjects3 жыл бұрын
Thank you! Around 2 days and yes maybe 8-10ft deep.
@Iamam3132 жыл бұрын
how long would it take to dig a 1600 sqr meter pond? (no an actual pond but where a pond will be made) a V-shaped hole with gradual depth (no more than 30 degrees slope) to be exact. I'm trying to calculate how much it would be to DIY it but I have no idea how quickly it could be done with an excavator
@AFHProjects2 жыл бұрын
Depends the place and soil type, shape and what's around there. If there's chance to haul the dirt around the pond and you don't have to lay all over several times it will take around 200 hours to dig and grade all out. But I don't know the exact condition, what type of excavator you have and your experience to operate with the excavator. It may take less or more time, so many factors.
@scalp6844 жыл бұрын
Il est plein maintenant....? ( is it full now...? do you have picture ?) Merci.. ( thank's)
@AFHProjects4 жыл бұрын
It's all most full. I don't have any pictures.
@srikantamal98792 жыл бұрын
Is type pond ka area And quantity please find attached.
@spcpitts4 жыл бұрын
Seems like the operator moved alot of dirt twice that he could have side casted sooner.
@AFHProjects4 жыл бұрын
Tell me more, please. How? If I needed to move all back there.
@hunterrichmond42194 жыл бұрын
why did you not have a little Drott or blade to move the spoil.???
@AFHProjects4 жыл бұрын
No point for that.
@natethevoicemusic60854 жыл бұрын
Will this pond hold water without being packed down with a dozer?
@AFHProjects4 жыл бұрын
Yes, water is raising up slowly. Water will close the earth by itself too.
@natethevoicemusic60854 жыл бұрын
AFH Projects That’s great news, I’ve got good clay soil but everyone’s keeps telling me I’m going to have to rent 2 machines and I don’t have the money. Thank you for the info, I’m just gonna dig the hole and smooth it with the bucket!
@AFHProjects4 жыл бұрын
Where is that spot where you want to dig? Is there wet ground or is it somewhere in slope? If it's up on hill or the place is quite dry then you may be problems.
@natethevoicemusic60854 жыл бұрын
AFH Projects it’s a spot in my yard that always stays wet unless we are in a drought.
@natethevoicemusic60854 жыл бұрын
AFH Projects flat ground
@Earthwatcher572 жыл бұрын
How big is the digger?
@AFHProjects2 жыл бұрын
12t
@johnkmcgregor52094 жыл бұрын
I really enjoyed that, it would be nice to see it now as a comparison, so we can see the fruits of your labour. Otherwise it’s just you digging a hole.
@AFHProjects4 жыл бұрын
I'm glad you enjoyed it. I try to make better videos in the future. It was work for client and I didn't have any chances to film better. Thank you for your feedback!
@gregblanton93864 жыл бұрын
A skid steer would have saved the excavator operator a ton of time moving dirt, otherwise it was great work.
@AFHProjects4 жыл бұрын
Yeh, but what's the difference? Cost to client is the same or higher. Need transport for 2 machines and pay for another operator. If there is longer distances then it's better to use some kind of dumper.
@manimdearantinasilva2715 жыл бұрын
Ficou top
@dflatt39628 ай бұрын
How does this hold water now? How high is the normal level?
@AFHProjects8 ай бұрын
It holds now, there was the old field drainage system close to the pond. He sealed some of them and digged them through.