Nice vlog bro ❤ @ 12.13 Porur Bypass to Porur JN single elevated station, From Alappakkam To Azhwarthirunagar in Arcot Road would be Double Decker Elevated 5.1km line then Virugambakkam metro comes into Red line goes to Madhavaram Milk Colony. Please correct it
@rideaway78253 ай бұрын
Thanks Bro. That's how the CMRL Phase II map appeared to me, therefore I made my statement based on that observation. I checked again, and everything you described is accurate. I will address this in the upcoming Vlog.🙂
@balajinatarajan3283 ай бұрын
Just look at the pillars you can easily identify single or double decker
@deepakdkrishna18543 ай бұрын
Good coverage 👍..... however itha paatha 2025 dec kulla mudiya vaaipu ella. 2026 mid mela aedum pola
I think it is not Poonamalee By Pass Road, it is Poonamalee Outer Ring Road. The actual By Pass Road is the one, in which Vanagaram Toll is situated and over which Metro Railway Station is also being consturcted.
@vanithav6343 ай бұрын
Your camera is covered only road. Little bit only view the construction so kindly full view on the construction site.
If you look at it just as Station, both serve the same purpose. A regular train shares its track and other infra with long distance passenger trains , suburban and freight trains. Metro has an exclusive infrastructure, and operate within the city and both are having rails so both words are right 🙂
@rajanjacob25773 ай бұрын
Why dont they clean garbage and mud on side of road. Or people should not throw plastic bottles on road .
@BRRUHHHHHH3 ай бұрын
12:20 wrong information double tucker metro starts only in karambakam station which comes after to porur junction metro But you are showing porur bypass metro
@rideaway78253 ай бұрын
@@BRRUHHHHHH yes Bro already noticed, I will address this in the upcoming vlog.