Not sure if this helps, but I use ladies nail files (the type made from sandpaper) to burnish relays and they work for me, mainly because they are rigid.
@RailroadSignsandSignals2 ай бұрын
That is definitely a good idea! I will try that out next time. Thanks for the tip!
@Isaactheviolinistandviolist7 ай бұрын
Fantastic two things one how did you lower the gate with the lights and bells coming on and two watch out for storms they could be severe hopefully they won't damage any of your equipment
@RailroadSignsandSignals7 ай бұрын
When the gate drops past a certain point, the lights (and bell if connected to the same relay like in this case) will activate. The thing that activates the lights and bell is one of those copper contacts you see me maintaining in the video. In the beginning of the video, I used insulation to keep that contact open as I made my gate light inspection to reduce noise. As for the weather, big storms definitely cause problems with railroad signals. I am currently on call in case if any problems are reported with the crossings.
@Isaactheviolinistandviolist7 ай бұрын
@@RailroadSignsandSignals nice fantastic and you guys are like in the Austin San Antonio area right
@RailroadSignsandSignals7 ай бұрын
Yes.
@Isaactheviolinistandviolist7 ай бұрын
@@RailroadSignsandSignals That's what I thought just wasn't sure
@conraillock6667 ай бұрын
😂 2x makes the e bell sound like a foreign bell or a mini bell 😂
@jayasmrmore36877 ай бұрын
Same! They should use that Bell too.
@wearethekbproductions7 ай бұрын
Awesome work man! Gonna need to get in contact with you soon, my GS Type 2 E Bell Speaker fell apart while I was moving sadly
@RailroadSignsandSignals7 ай бұрын
I can definitely fix that! You still have the same number since last time? I can contact you directly.
@wearethekbproductions7 ай бұрын
@@RailroadSignsandSignals Yes you can, my number is still the same
@hotbytesB7 ай бұрын
How many times a day does a train go bye
@RailroadSignsandSignals7 ай бұрын
This (isolated line) is estimated at 14 trains per week (as train traffic is estimated per week or year by the railroad). This is actually very important information for me as I better understand the amount of traffic this track sees on average. More trains means more operation cycles and more wear on moving components.
@jayasmrmore36877 ай бұрын
@@RailroadSignsandSignalseven without operation, over time stuff starts to collect dust, dirt, rust etc.