Рет қаралды 49
The existing Road Over Bridge near Tiruchchirappalli Jn. was dismantled using advanced methods, including the diamond blade cutting method/floor saw cutting method for the deck slab and the diamond rope cutting method for the parapet wall and column cutting work.
The dismantling work was successfully completed without lowering or lifting the OHE contact wires, achieving the entire task within just 17 working days.