Raised Floor - ATLAS ITK ENDCAP

  Рет қаралды 225

Marco Kraan

Marco Kraan

Күн бұрын

April 29-30, 2024
Company 'System Floor Technics' supplies and installs in 2 days (7min video) the 1.3 meter high floor around the Super Frame & Petal Platform of the ATLAS ITK ENDCAP detector. The floor measures 8.4x8.4 meters and is covered with 60x60cm ESD tiles
The raised floor is necessary because cables and cooling tubes must be reconnected approximately every 2/3 weeks under the detector (at the so-called Bulk Head) after the installation of a half ring of Petals on one Wheel
A partially raised floor has been considered but is still more inconvenient in this relatively small area in the Nikhef cleanroom H070 which is shared with the ETpathfinder project.

Пікірлер: 1
@MartinInAmsterdam
@MartinInAmsterdam 4 ай бұрын
nice
The Hidden Engineering of Landfills
17:04
Practical Engineering
Рет қаралды 2,8 МЛН
Самое неинтересное видео
00:32
Miracle
Рет қаралды 1,7 МЛН
Angry Sigma Dog 🤣🤣 Aayush #momson #memes #funny #comedy
00:16
ASquare Crew
Рет қаралды 49 МЛН
Just Give me my Money!
00:18
GL Show Russian
Рет қаралды 1,1 МЛН
Best Fails of the Week! Too Much Caffeine!
12:02
FailArmy
Рет қаралды 1,3 МЛН
Aluminum Raised Floor System Installation -- Titanflor
2:33
TitanFlor
Рет қаралды 3,2 М.
Efficient Lockable Spring Ankle (ELSA) prosthesis
2:27
SLMC-EdinburghUni
Рет қаралды 16 М.
Electromagnetic Aircraft Launcher
15:09
Tom Stanton
Рет қаралды 1,2 МЛН
3D measurement of the new LHCb VELO C-side RF Box
3:46
Marco Kraan
Рет қаралды 57
Underfloor heating system installation by Continal Underfloor
3:05
Continal Underfloor Heating
Рет қаралды 3,1 МЛН
New optical table for MultiSAS at Nikhef R&D department
9:33