I captured the construction chronologically from undercutting the masonry, concreting the MIAKO ceiling, jamming the wreath, concreting the floors, building the chimney, stuccoing, laying a wooden floor, electrical installation, central heating installation, fireplace insert installation to kitchen installation.
During this reconstruction, approximately 1/2 of the cottage was reconstructed. Reconstructed area 40m2. Approximately 45 t of sand was consumed. And i spent CZK 500,000 on materials and craftsmen. Worked 300 manday. Produced 100 tons of building rubble.
Everything is described in the title.
#Cubivideo