SAP Production Execution E2E (Part 1/2) | PIR | Planning Time Fence | Fixed Lot Size | SAP Demo

  Рет қаралды 7,809

SAP with IK

SAP with IK

Күн бұрын

Пікірлер: 27
@vijaykumarsutar6458
@vijaykumarsutar6458 Жыл бұрын
Easy and fantastic explanation. PTF
@venkatsapsd1615
@venkatsapsd1615 3 жыл бұрын
Your explanation is smooth and clear and I am a big follower from Bangalore pls do more videos
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Thank you..sure will do.
@vishwanathakn577
@vishwanathakn577 7 ай бұрын
HI SIR YOU ARE TEACHING IS VERY CLEAR AND EASILY UNDERSTANDABLE. I HAVE ONE DOUBT , WHILE RUNNING MRP FOR FINISHED PRODUCT FOR PLANNING STRATEGY 11 , ITS NOT GENERATING PURCHASE REQUISITIONS . PLS HELP ME
@SAPwithIK
@SAPwithIK 7 ай бұрын
Strategy type 11 is for gross requirements planning which will not consider plant stock for net requirement calculations. Pls see if you had proper demands in MD04 and the mixed MRP indicator is checked.
@bhatt005
@bhatt005 3 жыл бұрын
Thanks sir for this video, Sir where and when we use planning time fence basically?
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Thanks for watching. Let’s say the planner wants to freeze the MRP proposals in a specific time period and he doesn’t want MRP to disturb the proposal within the time frame..in such scenarios the planning time fence helps to firm the proposals so that the planning data in the planned order cannot be changed during the MRP run.
@vinitthakre5593
@vinitthakre5593 3 жыл бұрын
sir pls upload part 2....and thank you so much for this😊
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Thanks for watching..part 2 is premiered today at 10:15pm IST
@bhatt005
@bhatt005 3 жыл бұрын
Sir do you provide online paid training? Pls make a video on MPS
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Sorry Sandeep..I do not provide training’s at the moment. Sure will do a video on MPS.
@pushprajsingh2210
@pushprajsingh2210 2 ай бұрын
Sir please demo sap pp variant configuration super bom, super routing dependancie brife explain
@SAPwithIK
@SAPwithIK 2 ай бұрын
This topic is already covered. Please check the playlist.
@vaithijosh1368
@vaithijosh1368 Жыл бұрын
Hi IK, Thanks for the explanation. I have one query, Why system generate Pln order next to the PTF. I'm also tried for the same scenario, System generate pln order after PTF only even through demand fall under PTF. Could you please explain?
@SAPwithIK
@SAPwithIK Жыл бұрын
Pls check the available stock, lead times and requirement date of the PIR. For PIR in case of material shortage, MRP generates proposals for the first day of the PIR month.
@prasadg7210
@prasadg7210 3 жыл бұрын
Thank you sir for this detailed explanation.. can you please make the video on Long term planing
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Thanks for watching..sure will do
@kanthreddy7585
@kanthreddy7585 3 жыл бұрын
Sir, Very well explained. Please do a video on how to use 10 ,11, 20 strategy combine. That is I want to assign 3 strategies for the FG. Based on the usage I want to change the strategy.
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Thanks for watching. You can only assign one strategy group in the material master at a time.
@WheelWari
@WheelWari Жыл бұрын
Thanks for this video, I am getting an error that "production version required - planned order will not be converted to prod order. What is the solution for this??
@SAPwithIK
@SAPwithIK Жыл бұрын
Have you maintained prod version in MRP4? Is it in the validity period? Did the planned order pick the prod version? Pls check
@narenaw4258
@narenaw4258 3 жыл бұрын
Not followed, why MRP Run putting Pl Order date as 20 Jan, instead of 01 Jan, the Demand date. What is the reason its creating around 20/21 Jan ?
@SAPwithIK
@SAPwithIK 3 жыл бұрын
because of the inhouse production days.
@sravansshow9543
@sravansshow9543 3 жыл бұрын
Hi can you please do a series video of FS with cases thank you so much…sir🙏🏻
@SAPwithIK
@SAPwithIK 3 жыл бұрын
Hi, do you mean functional specifications?
@sravansshow9543
@sravansshow9543 3 жыл бұрын
@@SAPwithIK exactly sir. Functional specification and tables also sir. Thanks for reply made my day
Мен атып көрмегенмін ! | Qalam | 5 серия
25:41
SAP MM MRP Lot Size Calculation
26:06
Expert Coaching in SAP MM, WM, SRM, EWM and ALE
Рет қаралды 8 М.
Think Fast, Talk Smart: Communication Techniques
58:20
Stanford Graduate School of Business
Рет қаралды 44 МЛН
SAP Phantom Assembly | SPK 50 | Production Execution | SAP Demo
14:52
How to Go from Manager to Director - Land an Executive Level Position
15:12
How I Would Become a Data Analyst In 2025 (if I had to start over again)
15:40
Avery Smith | Data Analyst
Рет қаралды 152 М.