Building an intermodal train on the BNSF, Seattle, 8-10-2010, part 1

  Рет қаралды 129,827

SeattleRailFan

SeattleRailFan

Күн бұрын

Пікірлер: 37
@Smoovious
@Smoovious 12 жыл бұрын
They've been pretty common for years now on intermodal, as well as coal. You'll see them most often in the mountain areas, but just about anywhere you could see them. I've often seen one or two engines in the middle of the consist as well, either together, or in 2 different spots. Helps spread the tractive/braking effort around, particularly where there are a lot of curves.
@CSXEMDTrainLover
@CSXEMDTrainLover 8 жыл бұрын
nice video and great catch of all 5 BNSF engine's making a intermodal train.
@davidfrobel7582
@davidfrobel7582 11 жыл бұрын
good video,,as an old truck driver,,mooving trailers around the yard ment for a long boaring day,but it was better than sitting home waiting for a load cross country,,I dont know if rail crews feel the same way,,,,,lol.
@SeattleRailFan
@SeattleRailFan 12 жыл бұрын
Excellent info. I over-simplified things. Probably should have said that the hostler crew "drops off the engines and prepares them so they're ready to go for the next crew that will assemble the train".
@SeattleRailFan
@SeattleRailFan 13 жыл бұрын
@inels100 The "Champion Tracks" are a small 2-track yard where engines are stored. In this case, hostlers brought the engines down from Balmer Yard and dropped them off at the Champion Tracks several hours earlier. At the correct time, the road crew brought the engines out of Champion and into Stacy Yard to make up their train. A train that ends its trip at Stacy could also have the engines moved to the Champion Tracks where the hostlers will pick them up and take them back to Balmer.
@Smoovious
@Smoovious 12 жыл бұрын
you'll also see them on some local runs if they need to keep a car on the mainline to protect the siding/spur they're shunting on. There are also some loads that require them for extra personnel. Some hazmat, for instance. I've been seeing the railroads do some overdimensional loads too (as a heavy-haul truck driver, I'm against this :) ), that may need a caboose for the additional people if the load requires it. You just won't see them replacing the FREDs tho.
@Patriot1776
@Patriot1776 9 жыл бұрын
I think the 'shoving platform' bylaws are now why DPUs are used on the rear-end so much nowadays. Rear DPUs can in a historical sense now be considered 'powered cabooses'. ^^
@Theoriginaltkg2902
@Theoriginaltkg2902 11 жыл бұрын
Yeah, some roads even use white for main and red for lined over. When I worked for the B&O years ago some switch targets even had different shapes, so if you could not see the color, you at least saw the shape .
@SeattleRailFan
@SeattleRailFan 12 жыл бұрын
Here in Seattle, BNSF uses switch flags that use green to indicate the switch is set straight for "mainline movement" and yellow for diverging. In contrast, UP up here uses red switch flags that show red for diverging and turn sideways (i.e.: you don't see them) for mainline movement. I assume it's a local thing. Different railroads do thing differently. May even be differences in different divisions on the same railroad. Different countries will have their own way of doing things.
@SeattleRailFan
@SeattleRailFan 13 жыл бұрын
@hardwork454 I'm not a railroader but from what I've seen it's hard in that you're constantly walking, climbing on cars, setting handbrakes, wrestling with brake hoses, etc. You have to do that in all weather conditions: 95 & sunny or 10 degrees & snowing and everything in between. You have to have a good head on your shoulders as there's lots of rules and procedures to know and follow. And it's not a 9 to 5 job, you'll be working all sort of crazy schedules. More of a lifestyle than a job.
@Theoriginaltkg2902
@Theoriginaltkg2902 11 жыл бұрын
Nice to see the red and silver warbonnet.
@SeattleRailFan
@SeattleRailFan 11 жыл бұрын
Air reservoirs. The air compressor fills these and the compressed air is used to power the braking system.
@Class1aNScaleModelRailroading
@Class1aNScaleModelRailroading 12 жыл бұрын
I have never seen a DPU on any intermodal train. Interesting.
@walt1064
@walt1064 12 жыл бұрын
I still like the Warbonnet paint.
@Passengervehicles
@Passengervehicles 10 жыл бұрын
Fantastic videos !
@SeattleRailFan
@SeattleRailFan 12 жыл бұрын
@MrJimmybgood Zero chance of seeing them regularly on the big Class 1 railroads. The FRED (Flashing Rear End Device) & the cost of the old 5-man crews spelled the end of the caboose. Cabooses are seen occasionally on both Class 1s & shortlines when a job requires shoving cars a long distance. You don't want to have the conductor hanging off the grab irons for 10 miles - very unsafe. In those cases the conductor will ride in a caboose, also called a "shoving platform".
@attlevi
@attlevi 11 жыл бұрын
Great Video. Thanks for sharing. Im in S. Florida. We nver see anything on this end. I too, Like the War Bonnet Paint Scheme. I the BNSF should keep them in addition to the the pumpkins. Funny, about the sounds.be. read my comments & You will see. I love the sounds they make. But CSX keeps running a shtload of Dash 8. We rarely get a GEVO this far South.
@RailfanNoah
@RailfanNoah 10 жыл бұрын
fantastic video!
@SeattleRailFan
@SeattleRailFan 13 жыл бұрын
@jpfrench325 Some things are obvious, like a crewman throwing a switch to line the engines onto the correct track. Experience helps with other things. When they left 2 engines on a track I knew from experience those would be used on the rear of the train. I also have a scanner, so I was listening to the crew talk amongst themselves on the radio.
@SeattleRailFan
@SeattleRailFan 12 жыл бұрын
Don't think I've yet got an engineer to sound his horn just to acknowledge me. I have got two or three to give a wave, which is nice...
@phoenixrailfan7956
@phoenixrailfan7956 9 жыл бұрын
Nice pop off at 0:24
@UPMAN2011
@UPMAN2011 12 жыл бұрын
Yes according the bylaws they must have shoving platform while moving a train in reverse.
@ElliottWolcott
@ElliottWolcott 12 жыл бұрын
cool i love trains.
@SeattleRailFan
@SeattleRailFan 13 жыл бұрын
@micksquizzy I was at maximum zoom in from the start until about 5:00, when I started zooming out to get a wider shot. At 5:18 I was maybe at 1/3 of max, by 6:10 or so the lens was at it widest as the train approached. My camcorder has a 12x zoom (35mm equivalent is 40-480mm).
@hardwork454
@hardwork454 13 жыл бұрын
Great videos, im starting at kcs in a bout a week as a conductor trainee and wanted to know what you think of the job like is it hard or just hard if you don't like to work, im looking forward to starting my career cause im 18 and just graduated and see this as a great thing.
@jpfrench325
@jpfrench325 13 жыл бұрын
How do you know what those people are doing as well as whats happening?
@SamWalworth
@SamWalworth 12 жыл бұрын
Just wondering why does the "switch flag" shows "Yellow' even when the danger of derailment is 100% if the locomotive goes by it? Other countries (e.g. Indian Railways) i see it as Red whenever there is a switch like this is involved
@jonnhanlan930
@jonnhanlan930 9 жыл бұрын
What you are calling a foreman is called a conductor in Canada (CN,CP, etc.)
@SeattleRailFan
@SeattleRailFan 9 жыл бұрын
+Jonn Hanlan I've noticed on local jobs the term "foreman" is used on the radio, on road trains they use the term "conductor". Might just be that BNSF has a certain way they like to do things.
@inels100
@inels100 13 жыл бұрын
what is a Champion Track?
@lrcopeland09
@lrcopeland09 11 жыл бұрын
I filmed 748 today. I will respond with the video.
@curtis13450
@curtis13450 10 жыл бұрын
run it
@scudrunner79
@scudrunner79 11 жыл бұрын
Two words. Hand signs.
@adamkrajewski5040
@adamkrajewski5040 9 жыл бұрын
Brad Thomas for what? Engineer on point.
@charlesdell2864
@charlesdell2864 9 жыл бұрын
Boring for some, fastinating for others, all depends on who you are.
@bryanwhitford2729
@bryanwhitford2729 8 жыл бұрын
So disappointed to see a Warbonnet on point. Ugly engine lol
Building an intermodal train on the BNSF, Seattle, 8-10-2010, part 2
13:13
Stacy Street Yard switch job having problems, 8-6-2010
14:20
SeattleRailFan
Рет қаралды 150 М.
Wait for it 😂
00:19
ILYA BORZOV
Рет қаралды 11 МЛН
Perfect Pitch Challenge? Easy! 🎤😎| Free Fire Official
00:13
Garena Free Fire Global
Рет қаралды 73 МЛН
Real Man relocate to Remote Controlled Car 👨🏻➡️🚙🕹️ #builderc
00:24
Wait… Maxim, did you just eat 8 BURGERS?!🍔😳| Free Fire Official
00:13
Garena Free Fire Global
Рет қаралды 9 МЛН
BNSF Race Track part 1
11:17
F&R HO Equipment
Рет қаралды 249 М.
Trains in Kent, WA on 4/20/2024 with an NS Leader on an Oil Train
9:19
Union Pacific Intermodal Ramp Operations Tour
6:40
Union Pacific
Рет қаралды 313 М.
Hanging out above the BNSF mainline, Seattle, 11-19-2013
22:08
SeattleRailFan
Рет қаралды 100 М.
Communications and Signals:Then and Now
15:01
Norfolk Southern
Рет қаралды 927 М.
How It's Made - Locomotives
4:57
Panos Egglezos
Рет қаралды 1,4 МЛН
CSX North Baltimore Intermodal Yard (Drone Video)
6:32
Delay In Block® Productions
Рет қаралды 216 М.
Switch Job 145 on Harbor Island, Seattle, 7-15-2011
11:51
SeattleRailFan
Рет қаралды 49 М.
Wait for it 😂
00:19
ILYA BORZOV
Рет қаралды 11 МЛН