bro, your updates are fantastic .. thank you for doing this, great job!
@NambiValavan6 ай бұрын
@@gabrielleraul Thanks
@mohammedmohideen-vz7joАй бұрын
Siruseri-kaelambakkam-pudubakkam-sidlabakkam-VIT-kandigai-nedunkundram-kilambakkam bus stand-padappai-oragadam-sunguvachadiram-pranthur airport.. must need this line..
@pg48326 ай бұрын
Super Coverage & Update
@NambiValavan6 ай бұрын
Thanks
@vijayadurailakshmanan6 ай бұрын
The work just started at small section near college. This section work was not happening for more than 1 year. Per latest news in paper there will be delay of 6 months. It's a far fetch. Hope the OMR section from SRP to Sipcot get complete by 2026 end.
@soundar42706 ай бұрын
Kelambakkam - Kovalam is 3.5 KM. Metro should be extended up to Kovalam Beach. Kovalam is already a tourist spot. Many foreign tourists visit Kovalam. ECR traffic is also will reduce if Kovalan is connected by Metro. Tiruporur MLA is sleeping. Already, New 2nd International Airport planned at Tiruporur is shifted to Sriperumbur (Parandur)
@psrmovieandgamingstudiopsr78046 ай бұрын
Correct Said Bro
@vro6676 ай бұрын
Please Give us a Update on Broadway Bus Stand Redevelopment and 4th Line Work Between Beach-Egmore. If Possible. Thankyou.
@NambiValavan6 ай бұрын
@@vro667 Will do
@r.a.j.a.n.r.g12126 ай бұрын
💜💜💜💜
@KamalKanth-ji1xw6 ай бұрын
Bro Pattabiram Railway Bridge Update Podunga.
@NambiValavan6 ай бұрын
@@KamalKanth-ji1xw Will try
@suryadce186 ай бұрын
Kuthambakkam bus terminus present status enna nu video coverage panna try pannaunga
@NambiValavan6 ай бұрын
Will do
@elanchezhiyans20426 ай бұрын
Poonamalle metro depot full pls update
@NambiValavan6 ай бұрын
@@elanchezhiyans2042 Will try
@bloggernatzm92956 ай бұрын
Why shouldn't metro fine the contractor for delaying things?
@NambiValavan6 ай бұрын
They should do. More than that work has to kick start fast to compensate that delay.
@venkateshandavan41226 ай бұрын
Bro, Omni bus stand Varadharajapuram chennai status cover pannunga if possible
@NambiValavan6 ай бұрын
Will try
@deepakdkrishna18546 ай бұрын
But i vaugely remember how this place was during late 1999. My parents took me to thiruporur murugan temple wen i was studying 5th.... even 2002 ! Apah totally isolated and terribly a outskirt place from city.... proper thar road kuda ella if im not wrong. Oru rented ambassador car... from kknagar .
@sathishkumar-wy7tk4 ай бұрын
Tar road ter, but nt upto t mark
@nandhakumar18196 ай бұрын
At that place only, they are building metro girders
@djtamilgamer0076 ай бұрын
Bro kilambakkam railway station work process video poto bro
@NambiValavan6 ай бұрын
@@djtamilgamer007 Will do
@communication-up6ol6 ай бұрын
Kamatchi thoraipakkam la thana iruku
@NambiValavan6 ай бұрын
@@communication-up6ol Kamatchi hospital located at intersection of Velachery - Tambaram main road & Pallavaram - Thoraipakkam radial road. Located around round 4 km distance from Thoraipakkam signal i guess
@saran.seenivasan6 ай бұрын
This section romba worst bro..perusa no progress at all.Romba delay aagirum ipdi pona
@NambiValavan6 ай бұрын
@@saran.seenivasanHope gradually work will be speed up for the delay
@saikrishnathiwakarrk6 ай бұрын
Ippp thaan start pannuranga so paakalam but , oru angle la paatha other all finish achu na inga workers nerya add panni work fast ah mudika chance iruku.
@MOHAMEDYusuf-ye7rb5 ай бұрын
iam from Mohamed Sathak aj college of engineering marina mall opposite but athukula na clg mudichuruva poola😂😂 enum approximate evalo days agum 😊
@NambiValavan5 ай бұрын
Approximately 2 years
@joshuad0076 ай бұрын
First it was Vandalur Kelambakkam road but was dropped
@NambiValavan6 ай бұрын
@@joshuad007 Yes, but there is proposal to extend upto Thiruporur in future
@karagis756 ай бұрын
Looks like nothing going on.. Currently ... thanks sir
@NambiValavan6 ай бұрын
@@karagis75 Yes but couple of pile machine are placed for foundation work near Semmancheri . Gradually work will pick up in upcoming days
@karagis756 ай бұрын
@@NambiValavan thanks sir
@deepakdkrishna18546 ай бұрын
2027 dec minimum.... athuku koranju 1% vvaaipu ella. Since this purely driverless metro. After civil construction .. testing matume 3 to 4 months pogum. For sure by 2028 1st quarter this seruseri line will be ready