Snowy 2.0 Explained: Powering Australia’s Transition to Clean Energy

  Рет қаралды 1,588

Fuconomy

Fuconomy

Күн бұрын

Пікірлер: 10
@JETechnology66
@JETechnology66 Ай бұрын
You know what? I am a regular viewer of your KZbin channel. I have seen all your videos and the content quality is very good. I learned Lots of things from you. your channel has great quality content but still, it is not delivering its right audience due to SEO problems. You should focus on your SEO so that you can get a big fanbase. Thanks
@FUCONOMY2024
@FUCONOMY2024 Ай бұрын
Thanks for your feedback we are already focusing on seo also we keep improving all aspects of video
@JETechnology66
@JETechnology66 Ай бұрын
@@FUCONOMY2024 Your Video SEO score onlay 59 out of 100 your creator suggested 0 out of 20 if you want i can share with you my SEO strategy and I can help you Growth in your channel
@JETechnology66
@JETechnology66 Ай бұрын
@@FUCONOMY2024 If you want I can share with You my SEO Strategy and I can help you Growth in your channel
@JETechnology66
@JETechnology66 Ай бұрын
If you want I can share with You my SEO Strategy and I can help you Growth in your channel
@FUCONOMY2024
@FUCONOMY2024 Ай бұрын
Thanks I don't need your service we already have seo expert and he is doing good
@darthgbc363
@darthgbc363 Ай бұрын
Basically - a gravity battery.
@lokesh303101
@lokesh303101 Ай бұрын
Cascading Hydroelectric Stations are Better for Maximized Output of Electricity. Looped Tunnels from Reservoirs are Much Better from the Headstream of Water towards the Downstream by the Water Grid.
@owenwilson25
@owenwilson25 Ай бұрын
What BS!! The amount of energy lost in converting, pumping, fluid drag, and conversion back again is immense, and that is AFTER having to transmit the electricity to the Snowy; and this is meant to be making use of excess production periods? It was NEVER going to save money or energy. It's as stupid as the hydrogen con by the gas industry. Renewable at grid scale is simple, pick the best locations where you want power stored for distribution (preferable locations with affordable land & a need for work) and install large-scale batteries - such as iron & zinc batteries, very old but reliable and long-lasting technologies. Sure, in time there will be even better battery technologies available, but these would already provide two to four days of unlimited power storage that can be switched on & off in a fraction of a second and located in places between the power source & power demand instead of having to re-route power to Victoria and back. These old techs will last twenty to forty years easily, and when new technology is available it can be phased in while the old is still doing its stuff, no drama.
Snowy 2.0 an ‘absolute disaster’: Chris Kenny
11:17
Sky News Australia
Рет қаралды 15 М.
The Truth About Pumped Hydro
16:53
Real Engineering
Рет қаралды 1,1 МЛН
Из какого города смотришь? 😃
00:34
МЯТНАЯ ФАНТА
Рет қаралды 1,6 МЛН
Amazing remote control#devil  #lilith #funny #shorts
00:30
Devil Lilith
Рет қаралды 15 МЛН
How Physicists Broke the Solar Efficiency Record
20:47
Dr Ben Miles
Рет қаралды 693 М.
Australia's Massive Infrastructure Projects | Talking Tactics with Mel Pikos
11:57
Talking Tactics with Mel Pikos
Рет қаралды 25 М.
Calls for Australia to become a renewable energy superpower | 7.30
7:10
ABC News In-depth
Рет қаралды 16 М.
Niall Ferguson Stuns World Leaders at ARC Australia - "Are We The Soviets Now?"
19:44
Alliance for Responsible Citizenship
Рет қаралды 408 М.
Tidal Power: Unlocking the Greatest Untapped Energy Resource on the Planet | FD Engineering
56:30
Connecting Solar to the Grid is Harder Than You Think
18:48
Practical Engineering
Рет қаралды 1,2 МЛН
Plagued by delays: Snowy Hydro 2.0 project moving at snail's pace
8:08
Sky News Australia
Рет қаралды 2,6 М.
Из какого города смотришь? 😃
00:34
МЯТНАЯ ФАНТА
Рет қаралды 1,6 МЛН