We ended up using some lime in a few holes I dug with a small 2” auger….. That and some drying fixed my problem.
@weeweed8610 ай бұрын
Great info.....Looking to place a shipping container is a spot where the soil moves likes it's floating. There are 2 spots that showed up while clearing for the container. Both are maybe 4 or 5 feet in dia and they do not connect. What's the best method to take care of this. The grading contractor said to just give it time to dry out....?
@ProudtobeaCivilEngineer9 ай бұрын
It's all about the safety concerns. Therefore, better allow for dry before proceeding.