Switching out Chapel-en-le-Frith Signal Box

  Рет қаралды 13,607

eagle50043

eagle50043

Күн бұрын

Пікірлер: 11
@YerDa67
@YerDa67 Ай бұрын
Do the exact same in my box 😂 Best part of the day. You’re just hoping the signals come off properly.
@simonnunn3200
@simonnunn3200 3 жыл бұрын
It closes every night. Not for the last time, it's still operating !
@Luigi-uj5ml
@Luigi-uj5ml Жыл бұрын
Good evening, some single track museum railways in the United Kingdom are still operated with staff or token blocks although all their stations are equipped not only with home signals but also with starting signals. It is therefore not clear to me the need to have a staff or token block in the presence of starting signals. In other words, couldn't the signals that authorize the sending of trains in the opposite direction along the single track section be interconnected to avoid head-on collisions? If I'm not mistaken, as far as physical Europe is concerned, only in the United Kingdom, Man and Ireland is the staff or the token-block used, while in the other railway networks of continental Europe, telephone block or Sole Management apart, electric locking systems are used which do not provide for the delivery of staffs, tokens, keys or other suitable metal or wooden objects to the train driver. If I'm wrong, correct me! Grateful for the attention given to me, I would like to take this opportunity to extend cordial and sincere regards
@Steve14ps
@Steve14ps 9 ай бұрын
Normally signal boxes on single lines cannot be switched out because of the requirement to exchange single line tokens. However, there are some boxes that can be switched out, let's say the signal boxes are A, B and C; there will be Long-Section token for A to C & vv with token instruments at A, B and C, the instrument at B will be an intermediate instrument and the signalmen at A and C will communicate with each other. When the signalman at box B opens up he will request a long section token and insert that token into a lock with the King Lever, with the Long Section Token locked it is the possible to use the Short Section Tokens A to B and B to C. When it is time to close box B, provided both Short Sections are clear and no tokens are out, the signalman at B can clear his King Lever and return the Long Section token to his intermediate instrument then box A will work with box C. The King Lever also allows the signals to be pulled off to allow what looks like a conflicting movement. Different railways use variations, I am sure someone will clarify or correct me, I am only explaining the basics
@antman09ful1
@antman09ful1 9 жыл бұрын
Thanks for shearing filming from this box.
@andyelliott8027
@andyelliott8027 7 жыл бұрын
..........and also for sharing.
@TheStevemcgregor
@TheStevemcgregor 3 жыл бұрын
Lived in Chapel as a child, my parents and myself used to travel from and back to there by train, 1950's. Wonderful times? There were different pressures on people then. Glad the line is still open now and that the box is still there. How much longer?
@Isochest
@Isochest 3 жыл бұрын
That is a big gap especially as there is no more Whaley Bridge signal box
@jammiebeasts
@jammiebeasts 9 жыл бұрын
Helfire chief and thats all I have to say on the matter for now
@ProfessorPesca
@ProfessorPesca 3 жыл бұрын
So is that it, the last 5-5-7? Sad times
@lucyanderson9322
@lucyanderson9322 2 жыл бұрын
The box is still open! It spends some time switched out though outside of peak hours so Buxton and Furness Vale boxes communicate directly.
Totley Signalbox (The Final Shift)
5:56
IRSE Minor Railways Section
Рет қаралды 11 М.
An hour at Horsted Keynes Signalbox
7:43
IRSE Minor Railways Section
Рет қаралды 12 М.
Lazy days…
00:24
Anwar Jibawi
Рет қаралды 8 МЛН
How to Fight a Gross Man 😡
00:19
Alan Chikin Chow
Рет қаралды 20 МЛН
Do you love Blackpink?🖤🩷
00:23
Karina
Рет қаралды 23 МЛН
James May finally drives the Tesla Cybertruck
14:15
James May’s Planet Gin
Рет қаралды 7 МЛН
Why Do We Still Have Semaphore Signals?
17:31
Geoff Marshall
Рет қаралды 163 М.
Signal Box at Southport 1992
12:27
Mike Wilcock. Rails in Wales.
Рет қаралды 1,1 М.
Damems Jcn signalbox
7:33
IRSE Minor Railways Section
Рет қаралды 9 М.
Working On It - Signalman
16:57
Mid Hants Railway 'The Watercress Line'
Рет қаралды 11 М.
A lever frame crossover at Acle signal box - 30th January 2020
4:33
Basics of Railway Signalling - Absolute Block - Easy to understand!
22:17
Horton Common Model Railway
Рет қаралды 18 М.
Switching out Elmton & Creswell Jct Signalbox
1:35
Railway Russ
Рет қаралды 111 М.
Brewery Sidings Signalbox
5:33
John C. Earwicker
Рет қаралды 61 М.
Lazy days…
00:24
Anwar Jibawi
Рет қаралды 8 МЛН