Outstanding explanation, in less than 12 minutes this video clearly explains a concept often cause of headache and frustrations to those who try to grasp it. Most grateful.
@JeffB-ry7pp26 күн бұрын
You have a gift for explaining complex concepts in a simple, easy-to-understand manner. Thanks!
@eh8092 Жыл бұрын
very good. This was very straight forward and easy to understand.
@z_vast49602 жыл бұрын
Okay. This was a VERY good example. I am not the type to leave public comments tho, but this is really good. Looking at the title of the video, my expectations rose and you met it. Good job.
@DPA24623 жыл бұрын
This was the most comprehensive video explaining the information I needed. Your tempo was at a good speed not too slow not too fast and the flow was perfect. Thank you.
@svedanthАй бұрын
Simple but great explanation on EVA. Recommend this to every PM as a primer.
@larakirwan9297 Жыл бұрын
Awesome explanation for my math-weary brain. Thank you!
@efosaodiase5018 ай бұрын
You are heaven-sent!!! Thank you.
@TacticalProjectManager6 ай бұрын
Glad I could help!
@charlesopikkwot7247 Жыл бұрын
I love it because it becomes the easiest way to learn about earned value management.
@madshopper763 Жыл бұрын
Excellent video with a real live example - I think I actually have it now, thanks so much :)
@grigorekushnir Жыл бұрын
Watched this video while doing my exam, made everything super clear!
@aperson20203 күн бұрын
Excellent video. I was wondering if it would be good to formulate the PV into the tables as well. It would complicate the structure though.
@lithapelomosuoe39624 ай бұрын
Very helpful crash course, literally minutes before my CAPM exam. Easy to grasp thanks.
@TacticalProjectManager4 ай бұрын
Hey ... good to hear! I'm sure you crushed the CAPM exam
@bixby569011 ай бұрын
short and crisp way of revising EVM concept.. cheers!
@caseyculpepper44223 жыл бұрын
This was a wonderful illustration of EVA. It helped me during one of my PM courses. The visual aids that you provided really added value as well. Thanks you sir!
@milner267 Жыл бұрын
A great example. Thank you so much for sharing.
@agamingff11816 күн бұрын
Very well explained. Thanks
@maheshkamthe3 жыл бұрын
One of the best one on EVM for such a short duration and simplicity.
@cvijaykumarreddy Жыл бұрын
This was a wonderful illustration of EVA.
@ronaldbrown1766 Жыл бұрын
Very well put together and explain. Thank you. Here is another Thumbs-up.
@amerkhan7006 Жыл бұрын
Excellent video on EVM.
@dindody3893 жыл бұрын
Great way to refresh my EVA! Very helpful indeed, very simple and direct explanation. Can be applied to Program Management
@Seko934 Жыл бұрын
Amazing! Thank you so much. Showing this to my students
@brianalfandi82712 жыл бұрын
this video very helpfull to simplify understanding process of EVA..good
@joeysaavedra56 Жыл бұрын
Well explained and easy to understand!
@aschedi3 ай бұрын
Life saving video.Thank you
@TacticalProjectManager3 ай бұрын
Hey, thanks for the nice comment.
@teshomekebede740311 ай бұрын
Outstanding explanation. Thanks!
@carolgreaves3 жыл бұрын
Amazingly easy to understand. Thank you!!. You are wonderful!
@TacticalProjectManager3 жыл бұрын
Thank you Carol. I give the compliment back to you, my followers.
@lanacahe Жыл бұрын
Amazing. Clear as heck
@CosiderCana2 ай бұрын
Good job, very useful
@BruceWilliams-mt9xt Жыл бұрын
Very concise. Thank you.
@messaghkavilla4954Ай бұрын
excellent work, however, I'm still not sure how you got 1500 on Create Design #2,when per day is 600 and 2days 100% completed = 1200?
@joshuadcryer3 жыл бұрын
Excellent video!
@gregsimard-ol1hr4 ай бұрын
Thank you, this was a good and helpful video.
@TacticalProjectManager4 ай бұрын
Thanks for commenting Greg! Really appreciate it.
@horlansiren96073 жыл бұрын
Thanks Sir, this video was really helpful and easy to understand
@NasdaqInvestors5 ай бұрын
Great video. Thanks
@Frosty__GT11 Жыл бұрын
I don’t get the point of the schedule answer; behind 900, what does that mean in time? I can’t say the schedule will be late 900. How late will the project be (based on the example, how many days late? )?How much over budget of the delays continue? I know how much we are over budget today, but what is the projected end cost?
@rodrigomencos46153 жыл бұрын
Quite well explained. Thanks for sharing this video. Very helpful.
@TacticalProjectManager3 жыл бұрын
Thank you Rodrigo! Glad you found the video helpful!
@JudgeHolden138 ай бұрын
This is reallly good!
@TacticalProjectManager6 ай бұрын
Happy to help!
@FzegeyeАй бұрын
Great job
@abiolaibrahim891 Жыл бұрын
Excellent work!
@namjoonsmoonchild12253 жыл бұрын
Thank you so much for the simple explanation.
@cynthiamcculley285 Жыл бұрын
This was great! Thank you!
@moutasemabdulrahman1194 Жыл бұрын
What will be the case for BCWS if activity 3 was completed beyond week 8
@HassanAhmed-nc7kc2 ай бұрын
Thank you ❤
@mirror1023 Жыл бұрын
I’m the 2000th subscriber!
@tgnupe29 ай бұрын
Does this mean we are over budget by $1200 and almost a day behind schedule?
@desmondonotafe21310 ай бұрын
Great explanation
@enokouchristian80212 жыл бұрын
Very helpful. Thanks very much
@amosolalekanadebayo56153 жыл бұрын
Thank you so sir this is helpful
@MsYagiz3 жыл бұрын
very clear explanation, thank you!
@josiazeb38762 жыл бұрын
Very good sir
@jutiarhasan2 жыл бұрын
Wonderful illustration, did the table make by MS Excel?
@TacticalProjectManager2 жыл бұрын
Hi Jutiar, I built these slides in PowerPoint 😃
@jutiarhasan2 жыл бұрын
@@TacticalProjectManager Nice👏🤔
@Zaperlott Жыл бұрын
thank you, really very helpful
@ashu2502 Жыл бұрын
Thank you 👍👍👍
@francesguingon58093 жыл бұрын
please explain again why we get AC of 50% on activity C?
@horlansiren96073 жыл бұрын
50% is the actual percent of work completed on activity c on ground which is less than the percent of work as per schedule.
@ProfessorJoaoArantes3 жыл бұрын
Thank you for your wonderful explanation. However, maybe there is a small error. The EV for Build Product activity should be calculated based on the 3 days (900*3*0.5= 1350), not the four days (900*4*0.5= 1800). The same error appears on EV for Test and Refine, that should be 1*700*0.25 = 175 instead of 700(4*700*0.25=700). Thank you so much for the example your created. If you do these corrections, the final numbers are sv= -1875, spi =0.73, cpi =0.7 and cv =-2175. I hope it helps. Please also check the name of activity on table EVA Metrics, it should be Build Machine instead of Build Product. All my best and thanks again
@sourod2 жыл бұрын
The earned value calculated is correct in the video. The Planned total cost for Build Product is 3600. And, at the current timeline, the completion is 50%. Hence it is simply (50% * 3600 = 1800). Earned Value is not based on how many days has been worked. Simply put, it is the value of the work completed based on initial budget.
@eleayeproctor94902 жыл бұрын
Did you mean Planned value as this indeed, should be 50% x 2 days.