Temporary bracing pieces have been installed on the #GordieHoweBridge to hold the deck in alignment. It will now appear as if the bridge deck is connected but there are a few more steps. #DeckConnect Read more here: www.gordiehoweinternationalbridge.com/en/Final-Steps-in-Connecting-the-Gordie-Howe-International-Bridge-Deck-Underway
@theroadnottaken93785 ай бұрын
Finally the answer to all the questions and to the doubters who thought the engineers didn't know what they were doing.
@arthurf.cleary47505 ай бұрын
Wow fantastic work.
@anthonyhitchings10515 ай бұрын
These beams are detailed for a lot of pulling force!
@frameoftimeproductions5 ай бұрын
Amazing 🤩
@kdestinyphotos5 ай бұрын
Awesome
@powershop19035 ай бұрын
Rock and roll !
@romangerdejesussayago25325 ай бұрын
cuenta regresiva, god for united state and Canadá, Greetings.
@dylanluhowy5 ай бұрын
I don’t know why they just didn’t start in the middle and build towards the sides of the river. That would have eliminated this connection problem. Let me know if you need any more advice.
@paulthesoundguy15 ай бұрын
Yes sir, I was looking for a left handed smoke shifter. Amy Leeds?
@ronparrish66665 ай бұрын
O I don't know maybe it's because the main cement supports are on land and they have to come out of that way because there's no supports in the water
@dylanluhowy5 ай бұрын
@@paulthesoundguy1 Sorry I’m only an expert in bridge engineering.
@lavluvlov5 ай бұрын
It's called the "Gordie Howe high-sticking penalty"
@Geartooth905 ай бұрын
Anyone walk the beam yet?
@benmarshall37885 ай бұрын
Believe it or not, once the the bridge was connected it officially became an international border crossing and CBP from both sides are now strictly monitoring activities on the bridge. I doubt if any of the steelworkers are going risk their job for that.
@johnlahr58284 ай бұрын
Is there anyone here who can explain to me HOW they brought the two sides to the same elevation since one side was lower. I retired from bridge erection long before the cable stayed bridge design and I am curious how it was accomplished since there seems to be no videos out there showing this crucial step. Thanks
@lzgbe.19615 ай бұрын
why can't you keep the video sequence in the correct order when editing.
@nikolatesla55535 ай бұрын
I wonder why they put in temporary bridge connections. I know that it was generally to help with alignment. But they couldn't align it with the permanent connections?
@anthonyhitchings10515 ай бұрын
You need to align it BEFORE bolting it up
@paulthesoundguy15 ай бұрын
Also….they use these temp pieces to push or pull the two sides and then they MEASURE for the real piece and then build it and then install it
@JoachimwGermain-co4zw5 ай бұрын
Bracing for wind load and temperature variations
@benitopelaez24175 ай бұрын
Only transverse alignment
@paulthesoundguy15 ай бұрын
@@benitopelaez2417 ACTUALLY…… they pull or push and then because they have multiple connection points at each end….. They connect and use torque force to raise or lower a respective side to be in alignment with the other side.
@nathancommissariat35185 ай бұрын
W massive
@dylanluhowy5 ай бұрын
I guess KZbin commenters are as knowledgeable about structural engineering as they are about anything else.
@aljock69275 ай бұрын
Come on guys you drew pictures on everything you wrote your names and whatever else you wrote and you can't paint the last pieces the Expansion Joints the most critical piece all the bridge
@anthonyhitchings10515 ай бұрын
they are not expansion joints
@dylanluhowy5 ай бұрын
As the title says these are TEMPORARY braces. Temporary means they will be removed.
@ChrisSeliga5 ай бұрын
The only expansion joints are on the land side where the bridge "ends" connect to the roadway.